Intelligence Reports/Complete library

Our Future Water Intelligence

Report Library

Search reports by subject, geography and report family. Each product page describes its contents, price and ordering availability.

Paste the caption with your link. Social platforms control how previews appear.

67 reports

Showing 1–24
Water Systems Overview: Denver Water cover

Water Systems Overview: Denver Water

An assessment of whether Denver Water's two-basin snowmelt supply, near-static storage, Board-led governance and treatment and pipe assets can hold up through drought years and the 2030s. Denver Water's constraint is supply, not plants: treated water consumption averaged 183.8 MGD in FY 2025 against 600 MGD of listed treatment capacity, while storage capacity grew 0.3% in a decade. In 2026 runoff fell to 22% of normal, and the Gross Reservoir Expansion, adding 77,000 acre-feet, is now due for completion in 2028.
Geography
Denver and surrounding suburbs, Colorado, United States
Edition
November 2026, First edition
Length
14 pages
Explore report
Water Systems Overview: Austin Water cover

Water Systems Overview: Austin Water

An assessment of whether Austin Water's single river supply, its institutions and its treatment, network and wastewater assets can keep pace with a growing city through the 2040s. Austin Water's average diversions of about 164,409 acre-feet a year use about half of its 325,000 acre-feet firm supply, so the strain lies in wastewater capacity, water loss and slow new supplies. Its US$3.2 billion five-year capital plan is led by the US$1.5 billion Walnut Creek expansion, while an estimated 7.1 billion gallons of water was lost in 2023.
Geography
Austin and surrounding areas, Texas, United States
Edition
November 2026, First edition
Length
14 pages
Explore report
Utility Intelligence Profile: Austin Water cover

Utility Intelligence Profile: Austin Water

A reference profile answering what Austin Water runs, whom it serves, how it is financed, governed and regulated, and which projects and decisions come next. Austin Water earned operating income of US$133.4 million on US$644.7 million of operating revenues in FY 2024 and holds an Aa1 Moody's rating, but its five-year capital plan has grown to US$3.2 billion and the typical residential bill was proposed at US$107.67 a month for FY 2027, up 7.8%.
Geography
Austin and surrounding areas, Texas, United States
Edition
November 2026, First edition
Length
13 pages
Explore report
Austin Water: Utility Account Brief cover

Austin Water: Utility Account Brief

A supplier's guide to where Austin Water is spending, how the City of Austin buys for it, who already holds its major contracts and which projects to pursue first. Austin Water's five-year capital plan grew from US$2.7 billion to US$3.2 billion, mainly because of the US$1.5 billion Walnut Creek expansion, whose construction manager at risk is MWH Constructors. The next largest named contracts are wastewater pipes: the US$125.58 million Williamson Creek tunnel and the US$20.6 million Harris Branch interceptor.
Geography
Austin and surrounding areas, Texas, United States
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: San Diego County Water Authority cover

Water Systems Overview: San Diego County Water Authority

An assessment of whether San Diego County Water Authority's supplies, institutions and regional conveyance system still fit a region where the Authority's own supplies fell 40.3% between FY 2016 and FY 2025. The Water Authority's own supplies fell 40.3% between FY 2016 and FY 2025, to 291,721 acre-feet, while conserved Colorado River water rose to 68.7% of them and the melded supply rate rose 75.0% to US$1,855 per treated acre-foot. Its 2025 plan projects a normal-year surplus of 16,333 acre-feet a year in 2030, which the Authority began selling in 2026 as S&P cut its senior lien rating to AA.
Geography
San Diego County, California, United States
Edition
November 2026, First edition
Length
15 pages
Explore report
San Diego County Water Authority: Utility Account Brief cover

San Diego County Water Authority: Utility Account Brief

A supplier's guide to where San Diego County Water Authority spends, how it buys, who holds its major work and which of its projects are open or emerging. The Water Authority's steadiest contract line is renewal of its 308-mile large-diameter conveyance system, where 50 miles of PCCP have been relined since 2009 and the current relining contract near Bonsall runs to summer 2027. It returned to the bond market with US$285 million of Series 2026A bonds in September 2026, weeks after S&P cut its senior lien rating to AA, while a 3% rate rise for 2027 keeps cost pressure on suppliers.
Geography
San Diego County, California, United States
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: Orange County Water District cover

Water Systems Overview: Orange County Water District

An assessment of how the Orange County Water District keeps northern Orange County's groundwater basin full, safe and funded, from recharge sources and governance to the GWRS and PFAS treatment. The basin's accumulated overdraft rose from 133,000 af to 183,000 af in the dry 2024-25 water year, while PFAS treatment has returned 55 wells to service against more than 100 impacted. Replenishment Assessment revenue of US$206.4 million made up about 96.8% of FY2025 operating revenues.
Geography
Orange County Groundwater Basin, California
Edition
November 2026, First edition
Length
14 pages
Explore report
Orange County Water District: Utility Account Brief cover

Orange County Water District: Utility Account Brief

An assessment of where the Orange County Water District spends, how it buys and which PFAS treatment, well and plant refurbishment opportunities suppliers should pursue first. PFAS treatment leads the District's purchasing: US$90.1 million is budgeted for producer PFAS facilities in FY2026-27, and two plant contracts of US$23,587,500 and US$31,785,907 went to the lowest responsive bidders in 2026. Resin supply and three more PFAS sites are in procurement or design.
Geography
Orange County Groundwater Basin, California
Edition
November 2026, First edition
Length
11 pages
Explore report
Metropolitan Water District of Southern California: Utility Account Brief cover

Metropolitan Water District of Southern California: Utility Account Brief

An assessment of where Metropolitan Water District of Southern California is spending, how suppliers can win its work, and which projects are open, emerging or strategic through 2027. Metropolitan has raised its Capital Investment Plan to US$1.025 billion to address a backlog of aging infrastructure, and in October–November 2026 it awarded a US$14,475,037 aqueduct liner contract and scheduled bid openings for three packages worth an estimated US$60–74 million. Larger decisions on Pure Water Southern California, whose first stage carries a US$2,881 million Metropolitan share, and the Delta Conveyance Project are still pending.
Geography
Southern California, United States
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Systems Overview: Metropolitan Water District of Southern California cover

Water Systems Overview: Metropolitan Water District of Southern California

An assessment of whether Metropolitan Water District of Southern California's imported supplies, aging aqueduct, distribution system and treatment plants, and its governance can carry the region through the supply and capital decisions due from 2027. Metropolitan's share of the Pure Water Southern California first stage alone, US$2,881 million, is about 2.8 times the US$1.025 billion Capital Investment Plan in its adopted budget, and only design is funded. The decision comes after debt service coverage fell to 1.14x in FY2024 before recovering to 2.45x in FY2025; water sales dropped 21.6% in a single year and new Colorado River reductions take effect in 2027.
Geography
Southern California, United States
Edition
November 2026, First edition
Length
13 pages
Explore report
Water Systems Overview: Seattle Public Utilities cover

Water Systems Overview: Seattle Public Utilities

An assessment of whether Seattle Public Utilities' watersheds, treatment, network, institutions and finances can carry a larger capital program of seismic, storage, dam and overflow obligations through the 2030s. Seattle Public Utilities has supply to spare: water produced in 2025 averaged 126.7 MGD against a 172 MGD firm yield, and leakage fell to 4.5%. The pressure is capital: the Mayor's proposed 2027–2032 water program is about US$1,067 million, rates rise 4.3% a year from 2027, and the 2026 Official Statement expects US$553.2 million of new parity bonds over 2027–2031.
Geography
Seattle, Washington, United States
Edition
November 2026, First edition
Length
13 pages
Explore report
Seattle Public Utilities: Utility Account Brief cover

Seattle Public Utilities: Utility Account Brief

An assessment of where Seattle Public Utilities will spend on water and drainage over 2027–2032, how its contracts are bought, and which suppliers are best placed to win them. Seattle Public Utilities' own May 2026 contract list names on-call consultant pools of US$20 million and US$30 million and a US$200 million Lower Duwamish construction contract. Behind them sit a proposed 2027–2032 Water CIP of about US$1,067 million and a Drainage and Wastewater CIP of US$2,344.3 million, neither adopted by November 16, 2026.
Geography
Seattle, Washington, United States
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Systems Overview: Philadelphia Water Department cover

Water Systems Overview: Philadelphia Water Department

An assessment of whether Philadelphia's two-river supply, three treatment plants, aging pipe networks and City-owned institutions can meet a regulatory calendar running to 2036. Philadelphia's plants have ample room: average distribution of 228.9 MGD in FY 2024 used about 42% of 546 MGD rated treatment capacity. The pressure sits in the networks, where non-revenue water rose to 103.2 MGD in FY 2023 from 92.4 mgd (41.7%) in the FY 2019 audited balance, and in a capital program stated as US$4,731.85 million by PWD and about US$6.4 billion by Moody's.
Geography
Philadelphia, Pennsylvania, United States
Edition
November 2026, First edition
Length
13 pages
Explore report
Philadelphia Water Department: Utility Account Brief cover

Philadelphia Water Department: Utility Account Brief

An assessment of where Philadelphia Water Department will spend on its capital program, how it buys, who already holds its major contracts and which projects suppliers should pursue first. PWD's proposed capital program for FY 2026 to FY 2031 totals US$4,731.85 million, against about US$6.4 billion reported by Moody's, with replacement and rehabilitation at 80%. The City's Fall 2026 forecast already names PWD plant contracts for 2027, including the Lardner's Point pumping station and a sixth sedimentation tank, each estimated at more than US$10m.
Geography
Philadelphia, Pennsylvania, United States
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Utility of the Future: San Francisco Public Utilities Commission cover

Water Utility of the Future: San Francisco Public Utilities Commission

An assessment of how far the San Francisco Public Utilities Commission is moving from service provider to system operator, across digital control, energy and carbon, climate-ready infrastructure, customers, governance and capital planning. SFPUC's US$12,559.0 million capital plan for FY2026-27 to FY2035-36 moves its growth to public power, lifting Hetch Hetchy Power capital 81.6% to US$2,242.7 million while the Water plan falls 15.4%. Its largest single commitment is US$1,470.3 million for Bay nutrient removal, forecast for November 2039, all paced by an Affordability Policy under which US$15.9 billion of proposals were cut back.
Geography
San Francisco, California, United States; regional wholesale supply in Alameda, Santa Clara and San Mateo counties
Edition
November 2026, First edition
Length
15 pages
Explore report
Water Systems Overview: San Francisco Public Utilities Commission cover

Water Systems Overview: San Francisco Public Utilities Commission

An overview of the water system served by the San Francisco Public Utilities Commission: its water resources, governance and institutions, infrastructure and service delivery, and its strategic outlook. SFPUC's regional water system depends on Hetch Hetchy Reservoir for up to 85% of deliveries to about 2.7 million people, while storage expansion and purified water supply have been canceled or deferred. In FY2025 it renewed 9.1 miles of water main against a 15-mile target, and its adopted US$12,559.0 million capital plan puts US$5,916.1 million into wastewater.
Geography
San Francisco, California, United States; regional wholesale supply in Alameda, Santa Clara and San Mateo counties
Edition
November 2026, First edition
Length
11 pages
Explore report
Utility Intelligence Profile: San Francisco Public Utilities Commission cover

Utility Intelligence Profile: San Francisco Public Utilities Commission

A reference profile of the San Francisco Public Utilities Commission: its service mandate, water supply, treatment and networks, wastewater, finances, major projects, tariffs, governance and climate resilience. SFPUC's Water Enterprise earned US$678.6 million of operating revenue in FY2025 with indenture coverage of 2.17, while department-wide debt principal reached US$11,443.7 million. Its adopted US$12,559.0 million capital plan is about 70% debt-funded, and sewer rates rose 15.0% in July 2026 with a further 14.5% adopted for July 2027.
Geography
San Francisco, California, United States; regional wholesale supply in Alameda, Santa Clara and San Mateo counties
Edition
November 2026, First edition
Length
12 pages
Explore report
San Francisco Public Utilities Commission: Utility Account Brief cover

San Francisco Public Utilities Commission: Utility Account Brief

A supplier's guide to the San Francisco Public Utilities Commission: how it is organised and makes decisions, its financial position and priorities, how it buys, and the opportunities to target first. SFPUC is buying against a US$12,559.0 million capital plan in which Wastewater takes US$5,916.1 million and Hetch Hetchy Power capital rises 81.6%. Its largest construction package out for bid in October 2026, the Folsom Harrison/Treat box sewers, is estimated at US$200 million to US$240 million after an earlier round drew a single bid.
Geography
San Francisco, California, United States; regional wholesale supply in Alameda, Santa Clara and San Mateo counties
Edition
November 2026, First edition
Length
11 pages
Explore report
Portland Water Bureau: Utility Account Brief cover

Portland Water Bureau: Utility Account Brief

Portland Water Bureau's spending is led by Bull Run Filtration, 43% complete with $1,028.34 million spent of a $2.46 billion budget at end-September 2026, and its two construction contracts, worth $1,290,000,000 and $382,000,000, are already held by construction manager/general contractor teams. The next openings sit in smart metering, energy, leak reduction and conduit work, with City purchasing on SAP Ariba since March 2026 and formal solicitations above $250,000.
Geography
Portland and surrounding areas, Oregon, United States
Edition
November 2026, First edition
Length
10 pages
Explore report
Utility Intelligence Profile: Portland Water Bureau cover

Utility Intelligence Profile: Portland Water Bureau

Portland Water Bureau is a City of Portland bureau whose Bull Run Filtration project, budgeted at $2.46 billion, was 43% complete at end-September 2026 and must deliver filtered water by September 30, 2029. First-lien debt service coverage was 7.07 times in FY 2024-25, and the typical residential water bill rose 8.1% to $70.89 in FY 2026-27.
Geography
Portland and surrounding areas, Oregon, United States
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Systems Overview: Portland Water Bureau cover

Water Systems Overview: Portland Water Bureau

Portland's water system depends on one primary source: the Bull Run supplied 98% of the city's water in FY 2014-15 and 86% in FY 2015-16, and the Columbia South Shore Well Field, at close to 100 million gallons a day, cannot meet demand without it. The system's institutions are organized around filtering that supply by September 30, 2029, and the $2.46 billion filtration project was 43% complete at end-September 2026.
Geography
Portland and surrounding areas, Oregon, United States
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Utility of the Future: Portland Water Bureau cover

Water Utility of the Future: Portland Water Bureau

Portland Water Bureau's transition is set by three dated programs: Bull Run Filtration, 43% complete with $1,028.34 million spent of a $2.46 billion budget at end-September 2026 and due to deliver filtered water by September 30, 2029; a smart meter program replacing about 114,000 meters, with digital reading from mid-2027; and a Net Zero Strategy to halve emissions by 2030. A single Director of Public Utilities now leads both the Water Bureau and the Bureau of Environmental Services.
Geography
Portland and surrounding areas, Oregon, United States
Edition
November 2026, First edition
Length
14 pages
Explore report
DC Water: Utility Account Brief cover

DC Water: Utility Account Brief

DC Water's FY 2027 capital budget of US$1,072.3 million is 38.0% above the revised FY 2026 budget, inside a US$9.69 billion ten-year plan, and its October 2, 2026 forecast lists 13 planned capital solicitations. The largest new work is a US$120M–US$130M progressive design-build for M Street transmission mains, alongside lead line packages of US$35M–US$40M each and a CMAR master agreement for Potomac Interceptor rehabilitation.
Geography
Washington, District of Columbia, United States; wholesale wastewater for Maryland and Virginia counties
Edition
November 2026, First edition
Length
11 pages
Explore report
Utility Intelligence Profile: DC Water cover

Utility Intelligence Profile: DC Water

DC Water earned US$1,004.3 million in operating revenues in FY 2025, with combined debt service coverage of 2.40x against total debt of US$4,090.1 million. It serves 127,562 accounts in the District and treats wastewater for about 1.8 million people in neighboring jurisdictions at Blue Plains, inside a US$9.69 billion ten-year capital plan.
Geography
Washington, District of Columbia, United States; wholesale wastewater for Maryland and Virginia counties
Edition
November 2026, First edition
Length
12 pages
Explore report