Intelligence Reports/Water Utility Intelligence Report
Water Systems Overview: Austin Water cover

Water Utility Intelligence Report

Water Systems Overview: Austin Water

An assessment of whether Austin Water's single river supply, its institutions and its treatment, network and wastewater assets can keep pace with a growing city through the 2040s. Austin Water's average diversions of about 164,409 acre-feet a year use about half of its 325,000 acre-feet firm supply, so the strain lies in wastewater capacity, water loss and slow new supplies. Its US$3.2 billion five-year capital plan is led by the US$1.5 billion Walnut Creek expansion, while an estimated 7.1 billion gallons of water was lost in 2023.

Geography
Austin and surrounding areas, Texas, United States
Evidence current to
21 November 2026
Format
PDF
Length
14 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

325,000 acre-feet a year: firm Colorado River and Highland Lakes supply, against a peak annual diversion of 174,781 acre-feet in 2022 (Drought Contingency Plan 2024)

US$1.5 billion: Walnut Creek Wastewater Treatment Plant expansion from 75 MGD to 100 MGD; construction began in April 2026

US$3.2 billion: five-year capital improvement plan for FY 2027–2031 in the 2026-27 budget, up from US$2.7 billion

7.1 billion gallons: water lost in 2023 (City Auditor estimate); the Infrastructure Leak Index was 4.18 in 2023, and Austin Water's water quality reports page gives 5.44 for 2024 and 5.16 for 2025, above the 3 to 5 range it describes as appropriate (goal 3.0 by 2040)

02

Buyer relevance

Who the report is for

Engineering and construction firms

Use the major project table, from the US$1.5 billion Walnut Creek expansion to the US$125.58 million Williamson Creek tunnel, to see where wastewater and pipe work is concentrated.

Water resource planners

Set the 2024 plan's 44,500 acre-feet a year from aquifer storage and recovery against a field-testing timeline that runs to a Phase 1B report in spring 2028.

Municipal credit analysts

Weigh Moody's July 2026 upgrade to Aa1 against a forecast 29.9% cumulative bill increase and a 23.2% cash-funding share of the FY 2027 capital plan.

Leak detection and asset management providers

Compare a break rate of 9.2 per 100 miles with a leak index that rose from 3.86 in 2021 to 4.18 in 2023.

03

Decision scope

Questions answered

01

How much of its firm supply does Austin Water use?

Its five-year average diversion of about 164,409 acre-feet a year is 50.6% of the 325,000 acre-feet firm supply (calculated); the 2022 peak was 174,781 acre-feet.

02

Who decides Austin Water's budget and rates?

The Austin City Council, which adopted the FY 2026-27 Austin Water budget on August 12, 2026, with rates effective October 1, 2026.

03

How is the Walnut Creek expansion financed?

Through a US$59 million state revolving fund loan closed in May 2026, up to US$50 million of Series 2026 bond proceeds, Austin Water funds and a WIFIA loan of up to US$1 billion still listed as 'Applied' on October 13, 2026.

04

How much water does Austin lose?

An estimated 7.1 billion gallons in 2023, up from 6.5 billion in 2021, according to the City Auditor; the leak index goal is 3.0 by 2040.

04

Inside the report

Inside the complete report

Executive Overview

1. Water Resource Profile

2. Governance and Institutional Framework

3. Infrastructure and Service Delivery

Strategic Outlook and Opportunities

Source Register

05

Public preview

What to watch next

Strategic Outlook and Opportunities

The FY 2027-28 proposed budget in summer 2027 and whether the planned 6.7% system-wide rate increase for FY 2028 holds; closing of the WIFIA loan for Walnut Creek, still listed as "Applied" on October 13, 2026; the next S&P and Fitch reviews; Walnut Creek against its 2031 service date, Williamson Creek tunnelling and Fallwell Lane substantial completion around April 2027; the aquifer storage and recovery test wells in spring 2027 and the Phase 1B report in spring 2028.

2. Governance and Institutional Framework

The FY 2027-28 budget cycle in summer 2027; any change in S&P or Fitch ratings after the Moody's upgrade; the 2026 water quality report and the next compliance quarters.

1. Water Resource Profile

The eastern Travis County site decision in fall 2026 and the spring 2027 test wells; the Phase 1B report in spring 2028; Highland Lakes storage against the 1.4 million acre-feet Stage 1 trigger; the next five-year update of the Drought Contingency Plan.

3. Infrastructure and Service Delivery

The 2024 and 2025 water loss audits submitted to the Texas Water Development Board; delivery of the US$18 million service line program; asset-condition and leak-response measures in the next budget; progress at Walnut Creek against its 2031 service date.

Sample page · page 10 of 14

Major projects with value and status as of November 21, 2026, and the financing table, from the Strategic Outlook.

Report page with a table of Austin Water's major projects, including Walnut Creek, Williamson Creek and Fallwell Lane, with values and status, followed by a financing table.

06

Included

What you receive

The complete PDF report: 14 pages, 6 sections, 13 tables and a register of 25 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

Austin Water's Water Forward 2024 plan, Drought Contingency Plan and annual water quality reports; the City's FY 2024 financial report, 2026-27 budget and bond official statements; City Auditor reports, EPA compliance and loan records, and 2025-2026 Council and Water & Wastewater Commission documents.

Sources

25 sources, listed in the report's source register. Evidence current to 21 November 2026. Principal data periods: FY 2024 audited results (fiscal year ended September 30, 2024); FY 2019–FY 2023 system statistics (Series 2024 Official Statement); FY 2026-27 budget and FY 2027–2031 forecast; Water Forward 2024; drinking water compliance to June 30, 2026; project and financing status checked to November 21, 2026. All currency is US dollars.

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Systems Overview: Austin Water

Format
PDF
Length
14 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
14 pages
Reference
OFW_EXT_WATER_SYSTEMS_OVERVIEW_AUSTIN_WATER_4ca67d4b5800
Evidence current to
21 November 2026

14

Explore this report family

More Water Systems Overview reports

Explore the same report family covering other utilities.

Water Systems Overview: Watercare Services cover

Water Systems Overview: Watercare Services

An assessment of whether Auckland's dam and Waikato River supply, Watercare's treatment plants and networks, and its new regulatory settlement can carry a NZ$15.2 billion investment program. Watercare reported results within its Charter standards in FY2026, with real water loss of 11.26% and 7.4 unplanned interruptions per 1,000 connections, but its dams fell to uncomfortably low levels in March 2025 and the replacement of the 1928 Huia plant now runs to 2038. Capital delivered fell to NZ$959.5 million, NZ$90.5 million below target, as borrowings reached NZ$4,699.8 million ahead of the first price-quality path from 1 July 2028.
Geography
Auckland (Tāmaki Makaurau), New Zealand
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: Acea cover

Water Systems Overview: Acea

An assessment of how Rome's water system fits together, from the Peschiera–Marcio springs through Acea Ato 2's networks to the regulators and concession that decide its tariffs and investment. Rome's water system depends on one spring system for most of its supply and loses about four in ten cubic meters in its network: in 2018 Acea Ato 2 abstracted 700.0 Mm³, of which 597.8 Mm³ entered the ATO 2 network. Service quality improved on most ARERA measures between 2019 and 2023, but samples exceeding wastewater discharge limits rose to 9.60%, and the €1.449 billion Peschiera doubling is before the courts after its first award was annulled.
Geography
Rome and ATO 2 Lazio Centrale, Italy
Edition
November 2026, First edition
Length
10 pages
Explore report
Water Systems Overview: Johannesburg Water cover

Water Systems Overview: Johannesburg Water

An overview of how Johannesburg's water system works as a whole, from bulk supply under Rand Water's licence through the utility's network and six wastewater works to the plans that must close its supply gap. Johannesburg used 1,801 Ml/d in June 2024 against the 1,550 Ml/d its plan requires under Rand Water's licence, while non-revenue water was 44.79% in FY2024/25 and total water losses of 207,136 Ml equal about 567 Ml/d. Downstream, the six wastewater works averaged 49% in the 2023/24 Green Drop audit, and new bulk water from Lesotho is expected about 2028.
Geography
City of Johannesburg, Gauteng, South Africa
Edition
November 2026, First edition
Length
11 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.