Intelligence Reports/Water Utility Intelligence Report
Water Systems Overview: Portland Water Bureau cover

Water Utility Intelligence Report

Water Systems Overview: Portland Water Bureau

An overview of the water system served by the Portland Water Bureau: its water resources, governance and institutions, infrastructure and service delivery, and its strategic outlook. Portland's water system depends on one primary source: the Bull Run supplied 98% of the city's water in FY 2014-15 and 86% in FY 2015-16, and the Columbia South Shore Well Field, at close to 100 million gallons a day, cannot meet demand without it. The system's institutions are organized around filtering that supply by September 30, 2029, and the $2.46 billion filtration project was 43% complete at end-September 2026.

Geography
Portland and surrounding areas, Oregon, United States
Evidence current to
12 November 2026
Format
PDF
Length
11 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

Close to 100 million gallons a day: capacity of the Columbia South Shore Well Field, about half Bull Run's daily capacity

About 93 million gallons a day: average water delivered, about 31.8 billion gallons in the fiscal year reported in the FY 2024-25 Financial Plan

2,253 miles of mains and 204 million gallons of storage: FY 2025 capital asset statistics

43% complete: Bull Run Filtration at end-September 2026; filtered water is required by September 30, 2029

02

Buyer relevance

Who the report is for

Engineering and infrastructure firms

Map the network (2,253 miles of mains, 204 million gallons of storage) and the status of filtration, Washington Park and the paused Willamette River Crossing.

Regional water providers and planners

Understand the Bull Run and well field supply arrangement and the end of most of the 19 regional water sales agreements on June 30, 2026.

Public finance and policy analysts

See who decides rates, borrowing and compliance, from City Council's 9-3 bond vote to the Oregon Health Authority's September 30, 2029 deadline.

03

Decision scope

Questions answered

01

Where does Portland's water come from?

Mainly the Bull Run, about 30 miles east of the city, which supplied 98% of city water in FY 2014-15 and 86% in FY 2015-16; the Columbia South Shore Well Field can produce close to 100 million gallons a day as backup.

02

Who regulates the filtration requirement?

The Oregon Health Authority, through a Bilateral Compliance Agreement entered in 2017 and revised in 2023 and 2026, which requires filtered water by September 30, 2029.

03

How large is the distribution network?

The City's FY 2025 capital asset statistics list 2,253 miles of water mains, 204 million gallons of local storage and 14,898 fire hydrants.

04

What does a typical household pay?

The typical residential water bill at 5 ccf a month is $70.89 in FY 2026-27, up 8.1% from $65.57.

04

Inside the report

Inside the complete report

Executive Overview

1. Water Resource Profile

2. Governance and Institutional Framework

3. Infrastructure and Service Delivery

Strategic Outlook and Opportunities

Source Register

05

Public preview

What to watch next

1. Water Resource Profile

Filtration progress toward the 2029 date; the length of any future switch to groundwater; wildfire seasons in the Bull Run.

2. Governance and Institutional Framework

Any further revision of the compliance agreement; Council's FY 2027-28 rate decision; how the Unified Capital Improvement Program changes budgeting for the two bureaus.

3. Infrastructure and Service Delivery

A restart decision on the Willamette River Crossing; main break and water loss figures after FY 2023-24; smart meter activation from mid-2027.

Strategic Outlook and Opportunities

The project list in the FY 2026-27 budget and five-year capital plan adopted in June 2026 (the FY 2024-25 plan was $1.98 billion); the FY 2027-28 rate proposal and rate study findings; filtration spending against its $2.46 billion budget.

Sample page · page 6 of 11

Infrastructure and Service Delivery: network assets by source and period, main break and water loss indicators, and treatment projects.

Report page with tables of Portland's mains, storage, hydrants and meters from several sources, network performance by fiscal year, and the status of treatment and major projects.

06

Included

What you receive

The complete PDF report: 11 pages, 6 sections, 12 tables and a register of 23 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The report draws on the Bureau's system, supply, project and water quality pages, its Water Management and Conservation Plan and requested budgets, City ordinances and audited annual financial reports, the Environmental Protection Agency's WIFIA record, and 2026 bond market and news reporting.

Sources

23 sources, listed in the report's source register. Evidence current to 12 November 2026. Principal data periods: City financial report and capital asset statistics for FY 2024-25 (year ended June 30, 2025); FY 2026-27 adopted rates; Bull Run Filtration progress to end-September 2026; calendar 2024 and 2025 water quality monitoring; supply and demand series from FY 2008-09 to FY 2023-24. All currency is US dollars..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Systems Overview: Portland Water Bureau

Format
PDF
Length
11 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
11 pages
Reference
OFW_EXT_WATER_SYSTEMS_OVERVIEW_PORTLAND_WATER_BUREAU_08b2bc6ba982
Evidence current to
12 November 2026

14

Explore this report family

More Water Systems Overview reports

Explore the same report family covering other utilities.

Water Systems Overview: Watercare Services cover

Water Systems Overview: Watercare Services

An assessment of whether Auckland's dam and Waikato River supply, Watercare's treatment plants and networks, and its new regulatory settlement can carry a NZ$15.2 billion investment program. Watercare reported results within its Charter standards in FY2026, with real water loss of 11.26% and 7.4 unplanned interruptions per 1,000 connections, but its dams fell to uncomfortably low levels in March 2025 and the replacement of the 1928 Huia plant now runs to 2038. Capital delivered fell to NZ$959.5 million, NZ$90.5 million below target, as borrowings reached NZ$4,699.8 million ahead of the first price-quality path from 1 July 2028.
Geography
Auckland (Tāmaki Makaurau), New Zealand
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: Acea cover

Water Systems Overview: Acea

An assessment of how Rome's water system fits together, from the Peschiera–Marcio springs through Acea Ato 2's networks to the regulators and concession that decide its tariffs and investment. Rome's water system depends on one spring system for most of its supply and loses about four in ten cubic meters in its network: in 2018 Acea Ato 2 abstracted 700.0 Mm³, of which 597.8 Mm³ entered the ATO 2 network. Service quality improved on most ARERA measures between 2019 and 2023, but samples exceeding wastewater discharge limits rose to 9.60%, and the €1.449 billion Peschiera doubling is before the courts after its first award was annulled.
Geography
Rome and ATO 2 Lazio Centrale, Italy
Edition
November 2026, First edition
Length
10 pages
Explore report
Water Systems Overview: Johannesburg Water cover

Water Systems Overview: Johannesburg Water

An overview of how Johannesburg's water system works as a whole, from bulk supply under Rand Water's licence through the utility's network and six wastewater works to the plans that must close its supply gap. Johannesburg used 1,801 Ml/d in June 2024 against the 1,550 Ml/d its plan requires under Rand Water's licence, while non-revenue water was 44.79% in FY2024/25 and total water losses of 207,136 Ml equal about 567 Ml/d. Downstream, the six wastewater works averaged 49% in the 2023/24 Green Drop audit, and new bulk water from Lesotho is expected about 2028.
Geography
City of Johannesburg, Gauteng, South Africa
Edition
November 2026, First edition
Length
11 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.