Intelligence Reports/Water Utility Intelligence Report
Water Systems Overview: Seattle Public Utilities cover

Water Utility Intelligence Report

Water Systems Overview: Seattle Public Utilities

An assessment of whether Seattle Public Utilities' watersheds, treatment, network, institutions and finances can carry a larger capital program of seismic, storage, dam and overflow obligations through the 2030s. Seattle Public Utilities has supply to spare: water produced in 2025 averaged 126.7 MGD against a 172 MGD firm yield, and leakage fell to 4.5%. The pressure is capital: the Mayor's proposed 2027–2032 water program is about US$1,067 million, rates rise 4.3% a year from 2027, and the 2026 Official Statement expects US$553.2 million of new parity bonds over 2027–2031.

Geography
Seattle, Washington, United States
Evidence current to
16 November 2026
Format
PDF
Length
13 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

172 MGD: firm yield of the Cedar and South Fork Tolt supply (2019 Water System Plan, projection), against about 124 MGD of average daily delivery (2025–2030 Water CIP)

4.5%: distribution system leakage in 2025 (2,081 MG), with a three-year average of 5.2% against a 10% compliance threshold

US$974.3 million: adopted 2026–2031 Water CIP; the Mayor's proposed 2027–2032 program is about US$1,067 million and awaits Council adoption

4.3% a year: retail water rate increases adopted for 2027–2029 (Ordinance 127486, August 6, 2026)

02

Buyer relevance

Who the report is for

Engineering and construction firms

Size the storage, seismic and Tolt Dam work, including the US$90.2 million Bitter Lake Reservoir replacement now in construction.

Metering and data technology suppliers

Track where the advanced metering business case and the 8-meter wholesale pilot stand before any procurement.

Municipal bond investors and credit analysts

Compare SPU-reported coverage of 2.01x with Moody's 1.40x for 2025 against the 1.70x policy target as borrowing rises.

Wholesale customers and regional water planners

Follow the Operating Board, the 2026 wholesale rate study and the 2029 Tolt Dam license expiry that affect regional supply.

03

Decision scope

Questions answered

01

Does Seattle need new water supply?

Not on current plans: water produced in 2025 averaged 126.7 MGD, about 74% of the 172 MGD firm yield, and the 2019 Water System Plan expects no significant new sources for climate change until about 2060.

02

How large is the water capital program?

The adopted 2026–2031 Water CIP totals US$974.3 million; the Mayor's proposed 2027–2032 program is about US$1,067 million and awaits Council adoption.

03

How fast will water rates rise?

The Council adopted 4.3% a year for 2027–2029, and the median residential bill is projected to rise from US$50.71 in 2026 to US$59.26 in 2029.

04

How much water does the network lose?

Distribution system leakage was 4.5% (2,081 MG) in 2025, with a three-year average of 5.2% against a 10% compliance threshold.

05

Who runs the treatment plants?

Seattle Public Utilities took over the Tolt Treatment Facility on January 1, 2026; the May 2026 Water Official Statement confirms that Jacobs Solutions Inc. operates the 180 MGD Cedar Treatment Facility under a long-term contract.

04

Inside the report

Inside the complete report

Executive Overview

1. Water Resource Profile

2. Governance and Institutional Framework

3. Infrastructure and Service Delivery

Strategic Outlook and Opportunities

Source Register

05

Public preview

What to watch next

1. Water Resource Profile

The next Water System Plan and any revised demand forecast or climate horizon; Saving Water Partnership use against the 110 mgd goal through 2028; the Tolt Dam relicensing terms, which could carry new flow or habitat conditions.

2. Governance and Institutional Framework

Council adoption of the 2027 budget and 2027–2032 CIP; the outcome of the 2026 wholesale rate study; any withdrawals from the Revenue Stabilization Subfund; the next three-year Strategic Business Plan update, expected in 2027; Tolt Dam relicensing filings ahead of July 2029; Moody's view of the Drainage and Wastewater positive outlook as consent decree works near completion.

3. Infrastructure and Service Delivery

The advanced metering business case (bulk of work due by end of June 2026; status last confirmed February 2026) and any procurement; whether the Cedar contract follows the Tolt plant in-house; uptake of the widened Utility Discount Program from 2027; leakage in 2026 after the drop to 4.5% in 2025.

Strategic Outlook and Opportunities

Council adoption of the 2027–2032 CIP and the size of the 2027 water capital budget; the next water bond sale against the US$553.2 million projection; reported coverage against the 1.70x target; the Bitter Lake contract award; the advanced metering decision; court entry of the Lower Duwamish consent decree; any emissions inventory after 2021.

Sample page · page 7 of 13

Infrastructure and service delivery: treatment plants, network assets, leakage and water quality, 2019–2025.

Report page with tables of Seattle Public Utilities treatment facilities and network assets, distribution system leakage from 2019 to 2025, water quality results and the projected median residential water bill.

06

Included

What you receive

The complete PDF report: 13 pages, 6 sections, 13 tables and a register of 19 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The report draws on Seattle's water and drainage revenue bond Official Statements (2021–2026), the audited 2025 Water Fund financial statements, the adopted and proposed capital improvement programs, drinking water quality and wastewater collection reports, rating agency reports from May 2026, City Council legislation and staff analysis, and Operating Board minutes.

Sources

19 sources, listed in the report's source register. Evidence current to 16 November 2026. Principal data periods: FY 2025 audited results (year ended December 31, 2025); 2021–2025 operating statistics from the 2026 Water Official Statement; calendar 2025 water quality data; capital programs and project status as published to September 2026 and re-checked on November 16, 2026. All currency is US dollars (US$)..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Systems Overview: Seattle Public Utilities

Format
PDF
Length
13 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
13 pages
Reference
OFW_EXT_WATER_SYSTEMS_OVERVIEW_SEATTLE_PUBLIC_UTILITIES_98adc53a5f61
Evidence current to
16 November 2026

14

Explore this report family

More Water Systems Overview reports

Explore the same report family covering other utilities.

Water Systems Overview: Watercare Services cover

Water Systems Overview: Watercare Services

An assessment of whether Auckland's dam and Waikato River supply, Watercare's treatment plants and networks, and its new regulatory settlement can carry a NZ$15.2 billion investment program. Watercare reported results within its Charter standards in FY2026, with real water loss of 11.26% and 7.4 unplanned interruptions per 1,000 connections, but its dams fell to uncomfortably low levels in March 2025 and the replacement of the 1928 Huia plant now runs to 2038. Capital delivered fell to NZ$959.5 million, NZ$90.5 million below target, as borrowings reached NZ$4,699.8 million ahead of the first price-quality path from 1 July 2028.
Geography
Auckland (Tāmaki Makaurau), New Zealand
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: Acea cover

Water Systems Overview: Acea

An assessment of how Rome's water system fits together, from the Peschiera–Marcio springs through Acea Ato 2's networks to the regulators and concession that decide its tariffs and investment. Rome's water system depends on one spring system for most of its supply and loses about four in ten cubic meters in its network: in 2018 Acea Ato 2 abstracted 700.0 Mm³, of which 597.8 Mm³ entered the ATO 2 network. Service quality improved on most ARERA measures between 2019 and 2023, but samples exceeding wastewater discharge limits rose to 9.60%, and the €1.449 billion Peschiera doubling is before the courts after its first award was annulled.
Geography
Rome and ATO 2 Lazio Centrale, Italy
Edition
November 2026, First edition
Length
10 pages
Explore report
Water Systems Overview: Johannesburg Water cover

Water Systems Overview: Johannesburg Water

An overview of how Johannesburg's water system works as a whole, from bulk supply under Rand Water's licence through the utility's network and six wastewater works to the plans that must close its supply gap. Johannesburg used 1,801 Ml/d in June 2024 against the 1,550 Ml/d its plan requires under Rand Water's licence, while non-revenue water was 44.79% in FY2024/25 and total water losses of 207,136 Ml equal about 567 Ml/d. Downstream, the six wastewater works averaged 49% in the 2023/24 Green Drop audit, and new bulk water from Lesotho is expected about 2028.
Geography
City of Johannesburg, Gauteng, South Africa
Edition
November 2026, First edition
Length
11 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.