Utility Intelligence Profile: Dubai Electricity and Water Authority cover

Utility Intelligence Profile: Dubai Electricity and Water Authority

An assessment of how Dubai Electricity and Water Authority's supply, networks, finances, projects and plans to 2030 position it to meet Dubai's growing demand for water and power. DEWA added 120 MIGD of desalination capacity in the first nine months of 2026, reaching 615 MIGD at September 30, 2026, after a 2025 daily peak of 487 MIG had left 8 MIGD of headroom. Group revenue reached AED 32.84 billion in FY2025 (audited), while borrowings rose to AED 43,725.0 million at March 31, 2026.
Geography
Emirate of Dubai, United Arab Emirates
Edition
November 2026, New edition
Length
15 pages
Explore report
Water Utility of the Future: Department of Energy, Abu Dhabi Emirate cover

Water Utility of the Future

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate

An assessment of how Abu Dhabi's Department of Energy is moving from regulating licensed water companies to planning, monitoring and decarbonizing the emirate's water system as a whole, and what its 2027–2035 milestones depend on. The Department of Energy has set dated system targets, a 40% cut in network water losses by 2035 and a 500 million m³ cut in groundwater abstraction by 2030, of which measures for half had been identified by October 2026. Reverse osmosis reached 45% of water generation at EWEC-contracted plants in 2025, while the RC2 price control that funds the network companies ends on December 31, 2026 with no successor published.
Geography
Abu Dhabi, United Arab Emirates
Edition
November 2026, New edition
Length
16 pages
Explore report
Dubai Water Intelligence Report cover

City Water Intelligence

Dubai Water Intelligence Report

An assessment of whether Dubai's desalinated supply, storage, wastewater and drainage programmes, tariffs and governance can keep pace with a resident population heading for 5.8 million by 2040. DEWA lifted installed desalination capacity from 495 MIGD to 615 MIGD in the year to 30 September 2026, after a 2025 peak of 487 MIG left about 8 MIGD of margin, and has a contracted route to its 735 MIGD target for 2030. The larger open commitments are on the wastewater side: the AED 80 billion sewerage tunnel concessions had preferred bidders but no formal award as of 24 November 2026, while the sewerage fee rises 87% between 2025 and 2027.
Geography
Dubai, United Arab Emirates
Edition
November 2026, New edition
Length
32 pages
Explore report
Abu Dhabi Water Intelligence Report cover

City Water Intelligence

Abu Dhabi Water Intelligence Report

An assessment of whether Abu Dhabi's desalinated supply, networks, wastewater and regulation can keep the capital's water secure and affordable as the price control and the next round of reverse osmosis plants arrive from 2027. Abu Dhabi's drinking-water supply is secure on the regulator's 2023 data, with 98.91% of customers in the ADDC area connected and all of them on continuous supply, and reverse osmosis output up 46% in a year. The open questions are regulatory and resource-led: the RC2 price control, which set a revenue limit of AED 50 billion for 2023–2026, ends on 31 December 2026, and groundwater, about 60% of all water used in the emirate, is pumped at about 20 times natural recharge.
Geography
Abu Dhabi, United Arab Emirates
Edition
November 2026, New edition
Length
30 pages
Explore report
Water Utility of the Future: Dubai Electricity and Water Authority cover

Water Utility of the Future

Water Utility of the Future: Dubai Electricity and Water Authority

An assessment of how Dubai Electricity and Water Authority is moving from thermal desalination and conventional generation to a reverse osmosis, solar, storage and smart-grid system, and what must happen by 2030. DEWA plans 735 MIGD of desalination by 2030, with reverse osmosis rising from 68 MIGD at the end of 2025 to 308 MIGD on renewable energy, and installed capacity already reached 615 MIGD at September 30, 2026. Clean power supplied 16.23% of generation in 2025, while borrowings rose to AED 43,725,005 thousand at March 31, 2026, a quarter that included a new AED 5,000 million term loan and the Empower purchase.
Geography
Dubai, United Arab Emirates
Edition
November 2026, New edition
Length
16 pages
Explore report
Water Security and Supply Outlook in Abu Dhabi cover

Water Security and Supply Outlook in Abu Dhabi

Abu Dhabi's desalinated supply met a 2023 peak of 3.59 million m³ a day with transmission interruptions costing only 0.0078% of supply, but the regulator gives installed capacity as both 4.74 and 4.14 million m³ a day, so the margin is about 32% or about 15%. More than 2 million m³ a day of contracted capacity reaches expiry by 2037, and after Mirfa 2 and Shuweihat 4 the next RO plant is uncertain, with Saadiyat at letter of award: cancellation was reported in late 2025, but MEED still described it as being developed by Acciona in April 2026.
Geography
United Arab Emirates
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Infrastructure Investment and Project Pipeline in Abu Dhabi cover

Water Infrastructure Investment and Project Pipeline in Abu Dhabi

Abu Dhabi's water network and wastewater projects are moving through award and procurement, with a US$163 million STEP pumping-station rehabilitation, a 1 million m³ emergency lagoon and the US$775 million Mirfa–Liwa scheme due for bids on 5 January 2027, while the next desalination purchase agreement is unclear: Saadiyat has a letter of award to Acciona but a contested status, with 2025 reports of possible cancellation and MEED still naming Acciona as developer in April 2026. Network investment under RC2 was projected at AED 16.2 billion against about AED 21.3 billion forecast by the companies, and the successor control from 1 January 2027 had not been issued as of 11 November 2026.
Geography
United Arab Emirates
Edition
November 2026, First edition
Length
12 pages
Explore report
Climate Resilience: Drought and Flood Risk in Abu Dhabi cover

Climate Resilience: Drought and Flood Risk in Abu Dhabi

Abu Dhabi's climate risk to water lies in flood, coast and groundwater rather than rainfall drought: potable supply is desalinated and a 2010 study found climate change adds only about 3% to 2050 demand. More than 80 million m³ of rainwater had to be managed in a single week after the late-March 2026 storm, and in May 2026 the government allocated AED 11 billion to five PPP projects for dams, water storage, flood control and stormwater, while the projections cited for heat and sea level date from 2010.
Geography
United Arab Emirates
Edition
November 2026, First edition
Length
9 pages
Explore report
Abu Dhabi City Intelligence Profile cover

Abu Dhabi City Intelligence Profile

Abu Dhabi's potable water is desalinated seawater, and the supply base is moving to reverse osmosis: RO output rose 46% in 2023 while multi-stage flash fell 19.3%, against 1,160 million m³ produced by the plants supplying EWEC's Abu Dhabi system, including two in Fujairah outside the emirate. Taweelah RO operates at full capacity and Mirfa 2's partner ENGIE reports it operational, but Shuweihat 4's Q2 2026 commercial operation had not been announced as of 11 November 2026, and RC2, the price control that caps network revenue, ends on 31 December 2026.
Geography
United Arab Emirates
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Infrastructure Investment and Project Pipeline in Dubai cover

Water Infrastructure Investment and Project Pipeline in Dubai

Dubai Municipality's AED 80 billion sewerage tunnel PPP had preferred bidders for two packages from June 2026 but no formal award as of 10 November 2026, while DEWA's 180 MIGD Hassyan Phase 1 is in commissioning and its AED 1.76 billion second phase is signed. Tasreef drainage contracts worth about AED 6.9 billion have been awarded in three rounds within an AED 30 billion programme due for completion in 2033.
Geography
United Arab Emirates
Edition
November 2026, First edition
Length
12 pages
Explore report
Dubai City Intelligence Profile cover

Dubai City Intelligence Profile

DEWA's installed desalination capacity of 555 MIGD in Q1 2026 would reach 735 MIGD once Hassyan's remaining 120 MIGD and its 60 MIGD second phase are added, the figure in DEWA's end-2030 target. Daily peak demand rose from 455 to 487 MIG in 2025, while Dubai Municipality's AED 80 billion sewerage tunnel PPP still had no formal award as of 10 November 2026.
Geography
United Arab Emirates
Edition
November 2026, First edition
Length
13 pages
Explore report
Climate Resilience: Drought and Flood Risk in United Arab Emirates cover

Climate Resilience: Drought and Flood Risk in United Arab Emirates

With 78 mm of rain a year, the UAE's drinking water is protected from drought by desalination, but floods have tested its dams twice since 2024: they held 40 of 80 million m³ after the April 2024 storm and about 72 million m³ after a 2026 rain event. Dubai has awarded about AED 6.94 billion of its AED 30 billion Tasreef drainage programme, while the National Adaptation Plan due in 2025 had not appeared on NAP Central by 2 November 2026.
Geography
United Arab Emirates
Edition
November 2026 edition
Length
10 pages
Explore report
Water Infrastructure Investment and Project Pipeline in United Arab Emirates cover

Water Infrastructure Investment and Project Pipeline in United Arab Emirates

Desalination fell to 12% of the UAE's US$3.4 billion of water contract awards in 2025, from 35% in 2022, as capital moved into Dubai's AED 80 billion sewerage tunnels PPP and AED 30 billion Tasreef drainage programme. Reverse osmosis plants still advance through privately financed IWPs, but Shuweihat 4 and Al Hamriyah have slipped, and three network decisions fall between 19 November 2026 and 5 January 2027.
Geography
United Arab Emirates
Edition
November 2026 edition
Length
12 pages
Explore report
Water Security and Supply Outlook in United Arab Emirates cover

Water Security and Supply Outlook in United Arab Emirates

The UAE extracts around 2.3 billion m³ of groundwater a year against renewable internal resources of 0.15 billion m³, and groundwater still meets 46% of national demand. Drinking water depends on desalination, where capacity is being added as demand climbs: Dubai's 2025 peak of 487 MIG left 8 MIGD of margin before Hassyan Block A lifted capacity to 555 MIGD.
Geography
United Arab Emirates
Edition
November 2026 edition
Length
11 pages
Explore report
United Arab Emirates Country Intelligence Profile cover

United Arab Emirates Country Intelligence Profile

The UAE meets its water demand of about 5 billion m³ a year almost equally from groundwater (46%) and desalinated seawater (42%), with 7.80 million m³ a day of desalination capacity in the 2023 entity table. New supply is reverse osmosis bought from private developers, such as Dubai's 180 MIGD Hassyan plant. Groundwater, around 2.3 billion m³ extracted a year, is the problem that is not yet solved.
Geography
United Arab Emirates
Edition
November 2026 edition
Length
13 pages
Explore report
Dubai Electricity and Water Authority: Utility Account Brief cover

Dubai Electricity and Water Authority: Utility Account Brief

DEWA is Dubai's only electricity and water utility and a single, well-funded buyer: it reported AED 12,100.3 million of capital expenditure in 2025 and AED 13,026.9 million of future commitments at 31 March 2026. Plants are procured as independent power and water projects with DEWA holding 51–60%, while pipelines, substations and network work are tendered directly, with results published.
Geography
Emirate of Dubai, United Arab Emirates
Edition
October 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: Dubai Electricity and Water Authority cover

Water Systems Overview: Dubai Electricity and Water Authority

Dubai's drinking water comes almost entirely from desalination run by one listed, government-controlled company, and in 2025 the daily peak of 487 MIG came within 8 MIGD of installed capacity. Hassyan's first reverse osmosis block lifted capacity to 555 MIGD in Q1 2026, and DEWA plans 735 MIGD by 2030. The report sets out the resource base, institutions, tariffs, infrastructure and the delivery dates that decide the system's margin.
Geography
Emirate of Dubai, United Arab Emirates
Edition
October 2026, First edition
Length
13 pages
Explore report
Circular Water Economy in Dubai cover

Circular Water Economy

Circular Water Economy in Dubai

This report evaluates how Dubai can transform a desalination-dependent urban water system through demand reduction, reuse, recycling, resource recovery, ecosystem restoration, and climate-aligned investment.
Geography
Dubai, United Arab Emirates
Edition
2025
Length
29 pages
Explore report