Intelligence Reports/City Intelligence Profile
Dubai City Intelligence Profile cover

City Intelligence Profile

Dubai City Intelligence Profile

A reference profile of the water system in Dubai: its sources and supply, the institutions that run it, major projects, tariffs and finance, climate risk and what to watch next. DEWA's installed desalination capacity of 555 MIGD in Q1 2026 would reach 735 MIGD once Hassyan's remaining 120 MIGD and its 60 MIGD second phase are added, the figure in DEWA's end-2030 target. Daily peak demand rose from 455 to 487 MIG in 2025, while Dubai Municipality's AED 80 billion sewerage tunnel PPP still had no formal award as of 10 November 2026.

Geography
United Arab Emirates
Evidence current to
10 November 2026
Format
PDF
Length
13 pages
Edition
November 2026, First edition
Price
USD 99
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

555 MIGD: DEWA's installed desalination capacity (Q1 2026), with seawater reverse osmosis (SWRO) at 23% of the water mix

180 + 60 MIGD: Hassyan SWRO Phase 1 (60 MIGD in service since Q1 2026; all phases due Q1 2027) and Phase 2 (agreements signed, 2026)

AED 80 billion: Dubai Strategic Sewerage Tunnels, a three-package PPP still in procurement (Dubai Municipality figure; MEED reports it includes long-term operations)

AED 30 billion: Tasreef stormwater programme, scheduled for completion in 2033; three contract rounds worth about AED 6.9 billion awarded (calculated)

02

Buyer relevance

Who the report is for

Firms entering the Dubai water market

Identify which of DEWA, Dubai Municipality, the RSB and the Supreme Council of Energy handles each part of the water cycle before approaching a client.

Desalination and water transmission suppliers

Track the remaining 120 MIGD of Hassyan Phase 1, due by Q1 2027, and the 60 MIGD second phase signed in 2026.

Wastewater and drainage contractors

See where the AED 80 billion sewerage tunnels, the Jebel Ali plant expansion and the AED 30 billion Tasreef programme stand in procurement and construction.

Analysts covering Gulf utilities

Set DEWA's FY2025 group revenue of AED 32.84 billion and Q1 2025 water sales of AED 1,356.842 million beside the current slab tariff.

03

Decision scope

Questions answered

01

How much desalination capacity does Dubai have?

DEWA reported 555 MIGD of installed capacity in Q1 2026, with seawater reverse osmosis at 23% of the water mix.

02

How fast is water demand growing?

Daily peak desalinated water demand rose from 455 MIG in 2024 to 487 MIG in 2025, while the resident population grew 7.5% to 4.580 million.

03

What does a household pay for water in Dubai?

DEWA's residential slabs are AED 7.700, 8.800 and 10.120 per m³, plus a September 2026 fuel surcharge of AED 1.100 per m³ and 5% VAT.

04

Where do the sewerage tunnels stand?

Preferred bidders for Packages J and W were selected in June 2026, but no formal award had been made as of 10 November 2026, and Links bids are due 19 November 2026.

04

Inside the report

Inside the complete report

Executive Snapshot

1. City Water Profile

2. Water Resources and Supply

3. Institutions and Utilities

4. Infrastructure and Major Projects

5. Tariffs and Finance

6. Climate and Resilience

7. Outlook and What to Watch

Source Register

05

Public preview

What to watch next

2. Water Resources and Supply

Capacity above 555 MIGD in DEWA's next results; any storage figure newer than early 2024; a recycled-water reuse rate after 2023.

4. Infrastructure and Major Projects

Formal DSST awards for J and W; Links bids on 19 November 2026; commissioning of Hassyan's remaining 120 MIGD; the Jebel Ali EPC award.

5. Tariffs and Finance

Monthly fuel-surcharge rates; the 2027 sewerage step; DEWA's FY2026 results in early 2027.

6. Climate and Resilience

Further Tasreef rounds; Deira against end-2027; completion of the aquifer storage project.

Sample page · page 7 of 13

Dubai's sewerage, sewage-treatment and drainage projects with owner, value, stage and timeline, followed by DEWA's current water tariff.

Report page showing a table of Dubai Municipality water projects, including the sewerage tunnels, Jebel Ali sewage plant and Tasreef, and a table of water tariffs.

06

Included

What you receive

The complete PDF report: 13 pages, 9 sections, 11 tables and a register of 32 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The report draws on DEWA's FY2025, Q1 2026 and H1 2026 results, its 2024 Integrated Report and interim financial statements, Dubai legislation and Dubai Municipality releases. Project status comes from official announcements and trade press, checked as of 10 November 2026.

Sources

32 sources, listed in the report's source register. Evidence current to 10 November 2026. Principal data periods: DEWA FY2025 and Q1 2026 results; population at end-2025; project status as of 10 November 2026. Currency: UAE dirhams (AED), with US dollars where the source gives them. Volumes in imperial gallons, as DEWA reports them..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Dubai City Intelligence Profile

Format
PDF
Length
13 pages
Edition
November 2026, First edition
Price
USD 99
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
City Intelligence Profile
Edition
November 2026, First edition
Format
PDF
Length
13 pages
Reference
OFW_EXT_DUBAI_CITY_INTELLIGENCE_PROFILE_8b1532bd0754
Evidence current to
10 November 2026

14

Explore this report family

More City Intelligence Profiles

Explore the same report family covering other cities.

Muscat City Intelligence Profile cover

Muscat City Intelligence Profile

A reference profile answering who runs Muscat's water, where it comes from, what it costs and which projects will change the capital's supply, wastewater and flood protection from 2027. Muscat's own plants do not cover its demand: the governorate's two contracted desalination plants hold 391,000 m³ a day and two operating NWS plants about 40,000, against 2025 Muscat Zone demand of 606 thousand m³ a day on average and 677 thousand at peak, with the balance carried from the Barka Zone. Ghubrah III, a 300,000 m³ a day plant 93% built in November 2026, is expected to operate from Q2 2027, while water produced for Muscat fell from 233.3 million m³ in 2024 to 202.2 million m³ in 2025.
Geography
Oman
Edition
November 2026, New edition
Length
13 pages
Explore report
Jeddah City Intelligence Profile cover

Jeddah City Intelligence Profile

A reference profile of the water system in Jeddah: its sources and supply, the institutions that run it, major projects, tariffs and finance, climate risk and what to watch next. Jeddah's bulk supply has grown at regional scale, with Shuaiba-5 raised to 665,000 m³/day and Shuaibah 3 Conversion operating since May 2025; these plants serve the wider Makkah Region. The city's own weak points are local: leakage above 20% (2017) and stormwater projects covering 46% of the city at end-2024. The capital now moving is local too: NWC packages of over SAR 2.3 billion (wastewater) and over SAR 1.8 billion (water), and municipal drainage contracts.
Geography
Saudi Arabia
Edition
November 2026, First edition
Length
13 pages
Explore report
Doha City Intelligence Profile cover

Doha City Intelligence Profile

A reference profile of the water system in Doha: its sources and supply, the institutions that run it, major projects, tariffs and finance, climate risk and what to watch next. Doha has no separate water system: its water comes through KAHRAMAA's single national network from desalination plants with 538 MIGD of capacity in 2024, against national demand of 420 MIGD. Capacity is expected to reach 648 MIGD after the Facility E plant is commissioned in 2028, while Ashghal's sewer, treated-effluent and flood-drainage works make up seven of the eleven projects listed.
Geography
Qatar
Edition
November 2026, First edition
Length
13 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.