Intelligence Reports/Utility Intelligence Profile
Utility Intelligence Profile: Dubai Electricity and Water Authority cover

Utility Intelligence Profile

Utility Intelligence Profile: Dubai Electricity and Water Authority

A reference profile of the Dubai Electricity and Water Authority: its service mandate, water supply, treatment and networks, wastewater, finances, major projects, tariffs, governance and climate resilience. An assessment of how Dubai Electricity and Water Authority's supply, networks, finances, projects and plans to 2030 position it to meet Dubai's growing demand for water and power. DEWA added 120 MIGD of desalination capacity in the first nine months of 2026, reaching 615 MIGD at September 30, 2026, after a 2025 daily peak of 487 MIG had left 8 MIGD of headroom. Group revenue reached AED 32.84 billion in FY2025 (audited), while borrowings rose to AED 43,725.0 million at March 31, 2026.

Geography
Emirate of Dubai, United Arab Emirates
Evidence current to
29 November 2026
Format
PDF
Length
15 pages
Edition
November 2026, New edition
Price
USD 99
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

AED 32.84 billion: group revenue in FY2025 (audited), with EBITDA of AED 17.37 billion (DEWA results release) and profit after tax of AED 9,055.3 million (audited)

AED 25.74 billion: group revenue in the nine months to September 30, 2026, with profit after tax of AED 7.63 billion (actual)

615 MIGD: installed desalination capacity at September 30, 2026, up from 495 MIGD at the end of 2025; DEWA plans 735 MIGD by the end of 2030 (actual; plan)

AED 43,725.0 million: total borrowings at March 31, 2026, up from AED 38,576.3 million at December 31, 2025 (actual)

02

Buyer relevance

Who the report is for

Equity and credit analysts

Follow revenue, profit after tax of AED 7.63 billion for 9M 2026, borrowings of AED 43,725.0 million and the AED 6.2 billion minimum dividend against the Moody's A3 rating.

Desalination developers and EPC contractors

Track Hassyan Phase 1 (180 MIGD), the 60 MIGD Phase 2 agreement worth AED 1.76 billion and the three Phase 2 water transmission packages.

Grid and solar suppliers

Size work from 65 new 132 kV substations under construction, more than AED 8.5 billion of transmission projects due by 2028 and Solar Park Phase 7 (2,000 MW and 1,400 MW of storage).

Consultants preparing Dubai market entry

Get DEWA's customer base, desalination fleet, tariffs, governance and 2030 plan in one reference before deeper work.

03

Decision scope

Questions answered

01

How much desalination capacity does DEWA have?

615 MIGD at September 30, 2026, up from 495 MIGD at the end of 2025, against a plan of 735 MIGD by the end of 2030.

02

How large is DEWA financially?

It reported FY2025 revenue of AED 32.84 billion (audited) and EBITDA of AED 17.37 billion (results release), and nine-month 2026 revenue of AED 25.74 billion.

03

How much has it borrowed?

Total borrowings were AED 43,725.0 million at March 31, 2026, up AED 5,148.7 million in the quarter, including a new AED 5,000.0 million two-year term loan.

04

How fast is its customer base growing?

Customer accounts reached 1,380,844 at September 30, 2026, 5.5% more than a year earlier.

05

How much of its power is clean?

Clean sources produced 16.23% of DEWA's generation in 2025, up from 11.2% in 2024, and clean capacity was 4,910 MW of 19,029 MW at September 30, 2026.

04

Inside the report

Inside the complete report

Executive Overview

Utility and Service Mandate

Water Resources and Supply

Networks and Assets

Financial Position

Investment and Major Projects

Tariffs and Customer Context

Energy and Sustainability

Governance and Regulation

Climate and Resilience

Forward Developments

Key Intelligence Summary

Source Register

05

Public preview

What to watch next

Financial Position

Borrowings in the nine-month 2026 and FY2026 accounts; FY2026 results (FY2025 preliminary results were published on February 10, 2026); any Moody's rating action; the dividend policy after 2027.

Investment and Major Projects

The Phase 2 pipeline awards; Hassyan reservoir completion; the Phase 2 commercial operation date; full-year 2026 capital expenditure.

Water Resources and Supply

The 2026 daily peak against 615 MIGD; DEWA's confirmation of which plant added capacity after Q1 2026; full completion of Hassyan Phase 1.

Energy and Sustainability

The Phase 7 award and tariff; formal Phase 6 completion; the 2026 clean share of generation; DEWA's next published Scope 1 figure.

Sample page · page 4 of 15

DEWA's desalination fleet and installed capacity from 2016 to September 2026, with annual water production and demand.

Report page showing tables of DEWA's desalination plants and capacity in MIGD, the installed capacity series and annual water volumes.

06

Included

What you receive

The complete PDF report: 15 pages, 13 sections, 20 tables and a register of 21 sources.

This edition

November 2026, New edition.

07

Evidence & method

Evidence and method

The profile draws on DEWA's audited and interim financial statements and results releases filed on the Dubai Financial Market, its sustainability and integrated reports, and Dubai Media Office statements. Project and procurement status was checked against developer disclosures and trade press on November 29, 2026.

Sources

21 sources, listed in the report's source register. Evidence current to 29 November 2026. Principal data periods: FY2023–FY2025 audited accounts; FY2025 results release; Q1 2026 results and interim financial information; nine-month 2026 results (to September 30, 2026). Status checked on November 29, 2026. Currency is UAE dirhams (AED). Water is in imperial gallons, as DEWA reports it (MIGD: million a day; MIG: million; BIG: billion).

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Utility Intelligence Profile: Dubai Electricity and Water Authority

Format
PDF
Length
15 pages
Edition
November 2026, New edition
Price
USD 99
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Utility Intelligence Profile
Edition
November 2026, New edition
Format
PDF
Length
15 pages
Reference
OFW_EXT_DUBAI_ELECTRICITY_AND_WATER_AUTHORITY_UTILITY_INTELLIGENCE_PROFILE_ae64b4ac5a93_98c87ee233b4
Evidence current to
29 November 2026

14

Explore this report family

More Utility Intelligence Profiles

Explore the same report family covering other utilities.

Utility Intelligence Profile: National Water Company cover

Utility Intelligence Profile: National Water Company

An assessment of what National Water Company runs, how its networks, wastewater and supply perform against its own targets, and which contracts, tariffs and carbon commitments change its position from 2027. National Water Company's non-revenue water stood at 35% in February 2026 against a 27% target, and supply averaged 20.45 hours a day against 21.9. It treated 99.3% of the wastewater collected in 2024, but 26.33% of treated wastewater was reused, while its first residential tariff block rises from SAR 0.10 to SAR 1 per m³ in January 2027.
Geography
Saudi Arabia — national municipal water and sanitation network
Edition
November 2026, New edition
Length
12 pages
Explore report
Utility Intelligence Profile: Northumbrian Water cover

Utility Intelligence Profile: Northumbrian Water

An assessment of what Northumbrian Water supplies and treats in the North East and Essex & Suffolk, how its assets, finances and environmental performance stand, and what its 2025–2030 program must deliver. Northumbrian Water cut storm overflow spills from 40,792 in 2024 to 27,776 in 2025 and reduced regulatory gearing to 61.3% after a £400 million equity injection, yet its Environment Agency rating stayed at two stars as pollution incidents reached 50 per 10,000 km of sewer. Only 27% of year-one enhancement allowance was spent, and Essex entered drought under a temporary use ban.
Geography
North East England and Essex & Suffolk, England, United Kingdom
Edition
November 2026, First edition
Length
15 pages
Explore report
Utility Intelligence Profile: Unitywater cover

Utility Intelligence Profile: Unitywater

A reference profile answering what Unitywater supplies, how its networks and treatment plants perform, how its growth program is financed and monitored, and what comes next. Unitywater's Queensland Treasury Corporation loans rose to A$1,095.0 million at June 30, 2026 from A$432.0 million in 2023, while EBITDA interest cover fell to 3.6x. It plans more than A$1.6 billion of capital spending over three years, with water distribution charges frozen for 2026-27 and 2027-28.
Geography
Moreton Bay, Sunshine Coast and Noosa, South East Queensland, Australia
Edition
November 2026 edition
Length
15 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.