Intelligence Reports/City Intelligence Report
Dubai Water Intelligence Report cover

City Intelligence Report

Dubai Water Intelligence Report

An assessment of whether Dubai's desalinated supply, storage, wastewater and drainage programmes, tariffs and governance can keep pace with a resident population heading for 5.8 million by 2040. DEWA lifted installed desalination capacity from 495 MIGD to 615 MIGD in the year to 30 September 2026, after a 2025 peak of 487 MIG left about 8 MIGD of margin, and has a contracted route to its 735 MIGD target for 2030. The larger open commitments are on the wastewater side: the AED 80 billion sewerage tunnel concessions had preferred bidders but no formal award as of 24 November 2026, while the sewerage fee rises 87% between 2025 and 2027.

Geography
Dubai, United Arab Emirates
Report type
City Water Intelligence
Evidence current to
24 November 2026
Format
PDF
Length
32 pages
Edition
November 2026, New edition
Price
USD 799
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

615 MIGD: DEWA's installed desalination capacity at 30 September 2026, against 495 MIGD a year earlier (actual); DEWA's target is 735 MIGD by end-2030 (target)

487 MIG: the 2025 daily peak in desalinated water demand, up from 455 MIG in 2024 (actual) and 8 MIGD below the 495 MIGD then installed (calculated)

AED 80 billion: the Dubai Strategic Sewerage Tunnels (DSST) programme, including long-term operating costs; preferred bidders chosen for two packages in June 2026, no formal award reported as of 24 November 2026

1.5 → 2.8 fils per gallon: Dubai Municipality's sewerage fee, 2025 to 2027 (approved schedule), a rise of 87% (calculated)

02

Buyer relevance

Who the report is for

Wastewater concession bidders and lenders

Track the Dubai Strategic Sewerage Tunnels, an AED 80 billion programme with preferred bidders for Packages J and W since June 2026 and Links bids due 19 November 2026, alongside the Jebel Ali sewage plant expansion.

Transmission and desalination contractors

Plan around Hassyan Phase 1's completion in Q1 2027, the 60 MIGD Phase 2 and the two Phase 2 transmission packages, whose lowest bids were AED 335.92 million and AED 792.6 million.

Drainage contractors and consultants

Size the Tasreef programme: AED 30 billion to 2033, with about AED 6.9 billion awarded in three rounds between April 2025 and October 2026.

Investors and analysts covering DEWA

Set DEWA's nine-month 2026 profit after tax of AED 7.63 billion and A3 rating against its water sales, network losses of 4.5% and the independent water producer model in which it holds 60%.

03

Decision scope

Questions answered

01

Is Dubai's desalination capacity keeping up with demand?

Capacity reached 615 MIGD at 30 September 2026, about 21% above the 2025 peak of 487 MIG; in 2025 the peak had come within 8 MIGD of the 495 MIGD then installed.

02

How much water does Dubai hold in storage?

DEWA reported 882 million imperial gallons of reservoir storage in 2024, about 1.8 days of the 2025 peak day, with 1,152 MIG planned and a 6,000 MIG aquifer storage project in implementation.

03

What do customers pay for water and sewerage?

Water costs AED 7.70 to 10.12 per m³ by monthly band, plus a fuel surcharge of AED 1.10 per m³ (September 2026); the sewerage fee is 2 fils per gallon in 2026 and 2.8 fils in 2027.

04

Where do the big wastewater and drainage projects stand?

The sewerage tunnel packages J and W had preferred bidders but no formal award as of 24 November 2026; Tasreef has three contract rounds awarded, worth about AED 6.9 billion of its AED 30 billion estimate.

05

How much water does Dubai's system supply per resident?

System demand of 161.505 billion imperial gallons in 2025 equals about 439 litres per resident per day across all uses and losses, or about 315 litres per person present at peak daytime.

04

Inside the report

Inside the complete report

Executive Snapshot

1. Introduction and City Water Context

2. Water Demand and Consumption

3. Water Infrastructure and Supply Systems

4. Utility Performance, Finance, and Customer Services

5. Governance, Regulation, and Digital Transformation

6. Climate Resilience and Sustainability

7. Strategic Outlook and Recommendations

Source Register

05

Public preview

What to watch next

1. Introduction and City Water Context

The next Digital Dubai population release; DEWA's FY2026 results in early 2027, the first annual results with Hassyan capacity in service.

3.8 Major Projects and Capital Investments

Formal DSST awards for Packages J and W and financial close; the outcome of the Links bids due 19 November 2026; the Jebel Ali Phases 1–2 EPC award and the Phase 3 shortlist; awards of the two Hassyan Phase 2 pipeline packages; completion of Hassyan Phase 1.

4.8 Capital Investment Programmes and Financing Requirements

DEWA's FY2026 results (capacity, demand, losses and water sales); the monthly fuel surcharge; confirmation of the 2027 sewerage fee step; any decree or resolution setting the DSST payment mechanism; any rating action after May 2024.

6.8 Energy-Water Nexus Considerations

Further Tasreef rounds and Deira against end-2027; completion of the aquifer storage project; a DEWA statement on progress towards clean-energy desalination; reconciliation of the 50% and 30% city targets.

Sample page · page 13 of 32

Major projects and capital investments, with owner, value, stage as of 24 November 2026 and timeline, from Section 3, Water Infrastructure and Supply Systems.

Report page with a table of Dubai water projects, including Hassyan Phases 1 and 2, the Hassyan pipelines, aquifer storage, the Hatta reservoir, the sewerage tunnels, the Jebel Ali sewage plant expansion and Tasreef, with owners, values, stages and timelines.

06

Included

What you receive

The complete PDF report: 32 pages, 9 sections, 45 tables and a register of 48 sources.

This edition

November 2026, New edition.

07

Evidence & method

Evidence and method

The report draws on DEWA's FY2025 and nine-month 2026 results, its 2024 Integrated Report and Q1 2025 interim financial statements, Dubai legislation and the published tariff and sewerage fee schedules, and official population and economic statistics. It adds Dubai Municipality and Government of Dubai Media Office project releases, developer disclosures and trade-press procurement reporting, and national climate and water strategies, with project and procurement status re-checked on 24 November 2026.

Sources

48 sources, listed in the report's source register. Evidence current to 24 November 2026. Principal data periods: DEWA FY2025 results and nine-month 2026 results (to 30 September 2026); population at end-2025; DEWA Integrated Report 2024; tariffs as published on DEWA's tariff page (last updated 16 May 2026); project, procurement and policy status re-checked on 24 November 2026. Currency: UAE dirham (AED); US dollars (US$) where sources report them. Water volumes in imperial gallons, as DEWA reports them (1 MIG = 4,546 m³, calculated from DEWA's 490 MIGD = 2,227,587 m³/day).

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Lead Analyst, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility transformation, infrastructure, governance, finance and climate resilience for executive and policy audiences.

  • Evidence-led water intelligence
  • Decision-focused system analysis
  • Report-specific treatment of scope and terminology

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Dubai Water Intelligence Report

Format
PDF
Length
32 pages
Edition
November 2026, New edition
Price
USD 799
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
City Intelligence Report
Report type
City Water Intelligence
Edition
November 2026, New edition
Format
PDF
Length
32 pages
Reference
OFW-8932233216178_7af6950cf7b8
Evidence current to
24 November 2026

14

Explore this report family

More City Water Intelligence reports

Explore the same report family covering other cities.

Jeddah Water Intelligence Report cover

City Intelligence Report

Jeddah Water Intelligence Report

An assessment of whether Jeddah's networks, sewers and storm drains can deliver the water that an enlarged regional desalination system now supplies, as new tariffs and capital programmes take effect from 2027. Jeddah's bulk supply has expanded at regional scale, with Shuaiba-5 producing 665,000 m³ a day against a 600,000 m³ design, but the city's own weaknesses sit downstream: leakage above 20% (2017), half of its wastewater treated (2021 study) and stormwater projects covering 46% of the city at end-2024. NWC has announced more than SAR 4.1 billion across two Jeddah packages, and from 1 January 2027 the lowest residential block's combined rate rises from SAR 0.15 to SAR 1.50 per m³.
Geography
Jeddah, Saudi Arabia
Edition
November 2026, New edition
Length
31 pages
Explore report
Muscat Water Intelligence Report cover

Muscat Water Intelligence Report

An assessment of whether Muscat's desalination plants, Barka transfers, networks, wastewater programme and the finances of Nama Water Services can keep pace with the capital's demand to 2032. Muscat's own plants total about 431,000 m³ a day, about 64% of 2025 peak demand of 677,000, and even with Ghubrah III (93% complete in November 2026) and the Wadi Dayqah dam plant local capacity would reach about 766,000 m³ a day, just below the 774,000 peak projected for 2032. The utility behind the new contracts drew RO 173.651 million of its RO 428.663 million 2024 operating revenue from government subsidy, while current liabilities exceeded current assets by RO 338 million.
Geography
Oman
Edition
November 2026, First edition
Length
31 pages
Explore report
Abu Dhabi Water Intelligence Report cover

City Water Intelligence

Abu Dhabi Water Intelligence Report

An assessment of whether Abu Dhabi's desalinated supply, networks, wastewater and regulation can keep the capital's water secure and affordable as the price control and the next round of reverse osmosis plants arrive from 2027. Abu Dhabi's drinking-water supply is secure on the regulator's 2023 data, with 98.91% of customers in the ADDC area connected and all of them on continuous supply, and reverse osmosis output up 46% in a year. The open questions are regulatory and resource-led: the RC2 price control, which set a revenue limit of AED 50 billion for 2023–2026, ends on 31 December 2026, and groundwater, about 60% of all water used in the emirate, is pumped at about 20 times natural recharge.
Geography
Abu Dhabi, United Arab Emirates
Edition
November 2026, New edition
Length
30 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.