Intelligence Reports/Water Utility Intelligence Report
Water Utility of the Future: K-Water cover

Water Utility Intelligence Report

Water Utility of the Future: K-Water

An assessment of how far K-Water is moving from service provider to system operator, across digital control, energy and carbon, climate-ready infrastructure, customers, governance and capital planning. K-Water already plans dam releases on a digital twin covering 56 dams and weirs, runs 43 treatment plants autonomously and produces more renewable power than it uses. Its next stage is constrained by bulk water that recovered only 78.1% of its cost in 2025, a dam program cut from 14 sites to 5, and a chief executive post in transition.

Geography
South Korea · headquartered in Daejeon
Evidence current to
31 October 2026
Format
PDF
Length
13 pages
Edition
October 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

1,833 GWh vs 1,747 GWh: renewable electricity K-Water generated against its own on-site consumption; RE100 achievement certified by CDP in May 2026 (utility statement)

56 dams and weirs: covered by K-Water's digital twin water management platform by 2025, from a first basin in 2021

78.1%: bulk water cost recovery in 2025, down from 92.6% in 2021; bulk tariffs unchanged since September 23, 2016

KRW 2.2 trillion: planned total cost of the Yongin semiconductor cluster integrated water supply to 2034, for 1,072,000 tonnes a day; phase 1 construction began September 18, 2026

02

Buyer relevance

Who the report is for

Water and energy ministry officials and board members

Weigh the 2025 bulk water cost gap of KRW 410.2 billion against the tariff frozen since September 23, 2016.

Floating solar developers and power buyers

Plan against the four published 2030 targets, from about 500 MW of floating solar to 10 GW of renewables, side by side.

Contractors bidding on industrial water supply

Track Yongin phase 1 lots of KRW 275.6 billion and KRW 344.9 billion against the May 2029 supply date.

Credit and green bond investors

Follow the debt ratio from 167.0% in FY 2019 to a reported 92.7% in FY 2025 alongside falling water margins.

03

Decision scope

Questions answered

01

How far has K-Water's digital control gone?

Its digital twin covered 56 dams and weirs by 2025, and 43 multi-regional treatment plants run autonomous operation, with about KRW 11 billion of operating cost saved in 2025 as reported.

02

Is K-Water's water business paying its way?

No. Bulk water recovered 78.1% of its cost in 2025, down from 92.6% in 2021, and the water supply segment's FY 2024 operating margin was -3.6%.

03

What happened to the 14 new climate-response dams?

The August 27, 2026 review approved 5 for further study, shifted 2 to alternatives and scrapped 7, cutting estimated cost from KRW 4.75 trillion to about KRW 1.67 trillion.

04

How much renewable power does K-Water produce?

It produced 1,833 GWh against 1,747 GWh of its own use, and CDP certified its RE100 achievement in May 2026.

04

Inside the report

Inside the complete report

Executive Snapshot

1. From Service Provider to System Operator

2. System Intelligence and Digital Control

3. Energy, Carbon, and Resource Decoupling

4. Infrastructure Strategy for a Non-Stationary Climate

5. Governance, Regulation, and Institutional Reform

6. Capital Planning and Financial Architecture

7. Workforce, Capability, and Organisational Change

8. Strategic System Roadmap

Conclusion

Source Register

05

Public preview

What to watch next

1. From Service Provider to System Operator

Segment results in the FY 2025 and FY 2026 audited accounts, especially whether the water supply margin stays negative.

5. Governance, Regulation, and Institutional Reform

The chief executive appointment and the appointee's first stated priorities; any MCEE decision on bulk water tariffs.

6. Capital Planning and Financial Architecture

FY 2025 audited consolidated accounts and the 2027 budget; any MCEE tariff decision; the next KIS review; green bond issuance and allocation reports.

8. Strategic System Roadmap

Yongin award results and construction progress; a reconciled renewable target; MCEE decisions on tariffs and the five dams.

Sample page · page 8 of 13

Capital planning: consolidated results FY 2019 to FY 2025 and bulk water cost recovery

Report page showing a table of K-Water's consolidated revenue, profit, assets, borrowings and debt ratio from FY 2019 to FY 2025, a table of bulk water cost recovery from 2021 to 2025, and a green financing table.

06

Included

What you receive

The complete PDF report: 13 pages, 11 sections, 13 tables and a register of 26 sources.

This edition

October 2026, First edition.

07

Evidence & method

Evidence and method

The report draws on K-Water's sustainability reports, green financing framework and green bond reporting, the June 2025 KIS credit opinion with consolidated FY 2019 to FY 2024 results, and ministry announcements on dams, floating solar and the Yongin supply project. Project, leadership and policy status was checked against Korean news reports to October 31, 2026.

Sources

26 sources, listed in the report's source register. Evidence current to 31 October 2026. Principal data periods: FY 2019–FY 2024 consolidated results (years ended December 31); FY 2025 reported results; 2025–2026 plans and decisions. Project and policy status checked on October 31, 2026. All currency is Korean won (KRW)..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Utility of the Future: K-Water

Format
PDF
Length
13 pages
Edition
October 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
October 2026, First edition
Format
PDF
Length
13 pages
Reference
OFW_EXT_WATER_UTILITY_OF_THE_FUTURE_K_WATER_843565c63e2e
Evidence current to
31 October 2026

14

Explore this report family

More Water Utility of the Future reports

Explore the same report family covering other utilities.

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate cover

Water Utility of the Future

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate

An assessment of how Abu Dhabi's Department of Energy is moving from regulating licensed water companies to planning, monitoring and decarbonizing the emirate's water system as a whole, and what its 2027–2035 milestones depend on. The Department of Energy has set dated system targets, a 40% cut in network water losses by 2035 and a 500 million m³ cut in groundwater abstraction by 2030, of which measures for half had been identified by October 2026. Reverse osmosis reached 45% of water generation at EWEC-contracted plants in 2025, while the RC2 price control that funds the network companies ends on December 31, 2026 with no successor published.
Geography
Abu Dhabi, United Arab Emirates
Edition
November 2026, New edition
Length
16 pages
Explore report
Water Utility of the Future: Water and Sanitation Directorate, City of Cape Town cover

Water Utility of the Future

Water Utility of the Future: Water and Sanitation Directorate, City of Cape Town

An assessment of how Cape Town's Water and Sanitation Directorate is turning a dam-fed network into a diversified, metered and data-managed water system, and what could slow it before 2036. Cape Town's committed New Water Programme, a peak design capacity of 305 Ml/day, is now due by December 2036, while the City expects to reach its raw water allocation within two years. In the meantime it is installing about 83,000 smart meters by February 2029 and opened Faure reuse procurement on 25 September 2026, with 70 Ml/day due by June 2031.
Geography
Cape Town, South Africa
Edition
November 2026, New edition
Length
14 pages
Explore report
Water Utility of the Future: Electricity and Water Authority cover

Water Utility of the Future

Water Utility of the Future: Electricity and Water Authority

An assessment of how Bahrain's Electricity and Water Authority is changing from owning plants to buying private supply and operating the system, and which awards and targets set its path to 2032. Two private reverse osmosis plants in procurement, Hidd at 60 MIGD and Sitra at 30 MIGD, would add capacity equal to 42.2% of EWA's 213.22 MIGD installed in 2024, but neither had been awarded by 24 November 2026. EWA has set a 23% water loss target for 2032 with staged flow-meter replacement from 2026, while its first solar IPP was retendered with operation now targeted for 31 December 2028.
Geography
Bahrain, Middle East
Edition
November 2026, New edition
Length
15 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.