Intelligence Reports/Water Utility Intelligence Report
Water Systems Overview: K-Water cover

Water Utility Intelligence Report

Water Systems Overview: K-Water

An overview of the water system served by K-Water: its water resources, governance and institutions, infrastructure and service delivery, and its strategic outlook. Korea's water system is centralized at the bulk level, where K-Water runs the multipurpose dams and the multi-regional and industrial supply networks, and divided below it among municipalities and other public bodies. New storage has been cut from 14 proposed dams to 5 while industrial demand rises, and the bulk tariff funding the national layer has been frozen since 2016.

Geography
South Korea · headquartered in Daejeon
Evidence current to
31 October 2026
Format
PDF
Length
9 pages
Edition
October 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

2.18 billion m³: design flood-control capacity of the 20 multipurpose dams; K-Water secured more than three times this space before the 2025 flood season

1,072,000 tonnes a day: planned integrated industrial water supply for the Yongin semiconductor cluster, in two phases to 2034

KRW 432.8 per m³: bulk treated water tariff, unchanged since September 23, 2016; bulk water cost recovery 78.1% in 2025

14 → 5: new climate-response dams going ahead for further study after the August 27, 2026 review

02

Buyer relevance

Who the report is for

Water policy officials and regulators

See which body holds each layer of the system, from the ministry and the dam committee to municipalities, alongside the 78.1% bulk cost recovery in 2025.

Industrial water users and cluster planners

Compare Yongin phase 1 at 310,000 tonnes a day from May 2029 with phase 2 at 760,000 to 762,000 tonnes a day from existing dams and reclaimed water.

Engineering and desalination firms

Weigh the 5 remaining dams, the 100,000 tonnes a day Daesan plant and municipal consignments such as Yeongju when planning work to 2030.

Lenders and credit analysts

Read the 94.5% government stake, equity injections of about KRW 400 billion a year and the KRW 410.2 billion bulk cost gap in 2025 together.

03

Decision scope

Questions answered

01

How much storage does the national system rely on?

The ministry managed 34 dams in 2022, 20 of them multipurpose, with a design flood-control capacity of 2.18 billion m³ at the multipurpose dams.

02

What happened to Korea's new-dam plans?

The August 27, 2026 review kept 5 of 14 proposed dams for further study and cut estimated cost from KRW 4.75 trillion to about KRW 1.67 trillion.

03

Where is new supply coming from instead?

From conveyance and desalination: the Daesan plant adds 100,000 tonnes a day, and the Yongin project plans 1,072,000 tonnes a day by 2034.

04

Who sets K-Water's bulk tariff, and when did it last change?

The last increase, 4.8% from September 23, 2016, was announced by the Ministry of Land, Infrastructure and Transport; bulk cost recovery was 78.1% in 2025.

04

Inside the report

Inside the complete report

Executive Overview

1. Water Resource Profile

2. Governance and Institutional Framework

Strategic Outlook and Opportunities

Source Register

05

Public preview

What to watch next

1. Water Resource Profile

Feasibility results for the five dams; Daesan's first full year of operation; how Han River dam storage is allocated once Yongin phase 1 begins supply in 2029.

2. Governance and Institutional Framework

The chief executive appointment; any MCEE announcement on bulk or dam water tariffs; further municipal consignments to K-Water.

Strategic Outlook and Opportunities

Yongin lot 1 and lot 3 awards, with bidders to be selected December 18, 2026 (planned); the five dams' feasibility results; FY 2025 audited accounts; any tariff decision; the next KIS review.

Sample page · page 5 of 9

Governance: the institutions in Korea's water system, K-Water ownership and funding, and bulk tariff history

Report page with tables listing the ministry, the national dam committee, K-Water, municipalities and other bodies and their roles, K-Water ownership and funding figures, bulk tariff history and leadership status.

06

Included

What you receive

The complete PDF report: 9 pages, 5 sections, 8 tables and a register of 19 sources.

This edition

October 2026, First edition.

07

Evidence & method

Evidence and method

The report draws on ministry announcements and policy briefings on dams, drought and industrial supply, the June 2025 KIS credit opinion with K-Water's consolidated results, the 2016 tariff decision, and Korean news reports of K-Water statements, contracts and leadership, checked to October 31, 2026.

Sources

19 sources, listed in the report's source register. Evidence current to 31 October 2026. Principal data periods: FY 2024 consolidated results (year ended December 31, 2024); FY 2025 reported results; 2024–2026 national water decisions. Project and policy status checked on October 31, 2026. All currency is Korean won (KRW)..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Systems Overview: K-Water

Format
PDF
Length
9 pages
Edition
October 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
October 2026, First edition
Format
PDF
Length
9 pages
Reference
OFW_EXT_WATER_SYSTEMS_OVERVIEW_K_WATER_822efec5d79c
Evidence current to
31 October 2026

14

Explore this report family

More Water Systems Overview reports

Explore the same report family covering other utilities.

Water Systems Overview: Watercare Services cover

Water Systems Overview: Watercare Services

An assessment of whether Auckland's dam and Waikato River supply, Watercare's treatment plants and networks, and its new regulatory settlement can carry a NZ$15.2 billion investment program. Watercare reported results within its Charter standards in FY2026, with real water loss of 11.26% and 7.4 unplanned interruptions per 1,000 connections, but its dams fell to uncomfortably low levels in March 2025 and the replacement of the 1928 Huia plant now runs to 2038. Capital delivered fell to NZ$959.5 million, NZ$90.5 million below target, as borrowings reached NZ$4,699.8 million ahead of the first price-quality path from 1 July 2028.
Geography
Auckland (Tāmaki Makaurau), New Zealand
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: Acea cover

Water Systems Overview: Acea

An assessment of how Rome's water system fits together, from the Peschiera–Marcio springs through Acea Ato 2's networks to the regulators and concession that decide its tariffs and investment. Rome's water system depends on one spring system for most of its supply and loses about four in ten cubic meters in its network: in 2018 Acea Ato 2 abstracted 700.0 Mm³, of which 597.8 Mm³ entered the ATO 2 network. Service quality improved on most ARERA measures between 2019 and 2023, but samples exceeding wastewater discharge limits rose to 9.60%, and the €1.449 billion Peschiera doubling is before the courts after its first award was annulled.
Geography
Rome and ATO 2 Lazio Centrale, Italy
Edition
November 2026, First edition
Length
10 pages
Explore report
Water Systems Overview: Johannesburg Water cover

Water Systems Overview: Johannesburg Water

An overview of how Johannesburg's water system works as a whole, from bulk supply under Rand Water's licence through the utility's network and six wastewater works to the plans that must close its supply gap. Johannesburg used 1,801 Ml/d in June 2024 against the 1,550 Ml/d its plan requires under Rand Water's licence, while non-revenue water was 44.79% in FY2024/25 and total water losses of 207,136 Ml equal about 567 Ml/d. Downstream, the six wastewater works averaged 49% in the 2023/24 Green Drop audit, and new bulk water from Lesotho is expected about 2028.
Geography
City of Johannesburg, Gauteng, South Africa
Edition
November 2026, First edition
Length
11 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.