Intelligence Reports/Utility Account Brief
K-Water: Utility Account Brief cover

Utility Account Brief

K-Water: Utility Account Brief

A supplier's guide to K-Water, Korea's state water corporation. It sets out where K-Water spends, how it buys through its own tenders and the Public Procurement Service, who already holds major work, and which projects are open now, led by Yongin phase 1 lots estimated at KRW 620.5 billion with bidders to be selected on 18 December 2026.

Geography
South Korea · headquartered in Daejeon
Evidence current to
31 October 2026
Format
PDF
Length
10 pages
Edition
October 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

KRW 4,451.5 billion: consolidated revenue in FY 2024 (operating profit KRW 366.2 billion)

KRW 0.7–0.9 trillion a year: capital expenditure cited by the rating agency KIS (June 2025)

KRW 2.2 trillion: planned total cost of the Yongin semiconductor cluster water supply to 2034; phase 1 lots 1 and 3 tendered on 14 October 2026 at estimated KRW 275.6 billion and KRW 344.9 billion

105.6 MW at 7 sites: floating solar in operation; about 500 MW planned by 2030 (ministry, September 2026)

02

Buyer relevance

Who the report is for

Civil and water main contractors

Prepare for Yongin lots 1 and 3, with prequalification documents due 2 November 2026 and bidder selection planned for 18 December 2026.

Treatment and process equipment makers

Follow the package-by-package tenders at Cheongju and Danwol, such as Danwol instrumentation and control at KRW 2.86 billion.

Floating solar and grid suppliers

Plan around 105.6 MW now operating, the 95 MW Soyanggang project and about 500 MW targeted by 2030.

Business development teams entering Korea

Learn which channel applies: 17 of K-Water's 20 most recent notices were commissioned to the Public Procurement Service.

03

Decision scope

Questions answered

01

What is open now at K-Water?

Yongin phase 1 lots 1 and 3, tendered on 14 October 2026 at estimated KRW 275.6 billion and KRW 344.9 billion.

02

How does K-Water buy equipment?

Recent equipment tenders have mostly been run by the Public Procurement Service on KONEPS, with K-Water as demand agency; 17 of the 20 most recent notices were commissioned this way.

03

Who already holds K-Water's major work?

Kolon Global holds Yongin lot 2 at KRW 126.5 billion, and GS E&C built the Daesan desalination plant, with a total project cost of KRW 317.5 billion.

04

How much does K-Water invest each year?

The rating agency KIS cites capital expenditure of around KRW 0.7-0.9 trillion a year, against FY 2024 consolidated revenue of KRW 4,451.5 billion.

04

Inside the report

Inside the complete report

1. The Account at a Glance

2. Organisation and Decision-Making

3. Financial Position

4. Priorities and Pressures

5. How K-Water Buys

6. Opportunity Register

7. Commercial Priorities: Where to Focus First

8. Watch List: What to Monitor and What to Do

Source Register

05

Public preview

What to watch next

Yongin lots 1 and 3 award (18 December 2026, planned)

The largest open works in the pipeline.

Chief executive appointment

Priorities for 2027 may change.

Bulk tariff decision

A cost gap of KRW 410.2 billion in 2025 limits spending.

FY 2025 audited accounts and the 2027 budget

Confirms spending capacity after net income fell 29.8%.

Sample page · page 6 of 10

Opportunity Register: K-Water projects by status, stage, contractors, supplier categories and route in

Landscape report page with a table listing K-Water projects, including Yongin lots, treatment plant upgrades, dam safety, floating solar and digital operation, with status, stage, contractors, supplier categories, next milestone and how to access.

06

Included

What you receive

The complete PDF report: 10 pages, 9 sections, 6 tables and a register of 18 sources.

This edition

October 2026, First edition.

07

Evidence & method

Evidence and method

The brief draws on the June 2025 KIS credit opinion, ministry announcements on dams, floating solar and the Yongin scheme, tender notices for K-Water from late 2025 to October 2026, and Korean news reports of contracts, results and leadership, checked to 31 October 2026.

Sources

18 sources, listed in the report's source register. Evidence current to 31 October 2026. Principal data periods: FY 2022–FY 2024 consolidated results; FY 2025 reported results; tenders and contracts to October 2026. Project and procurement status checked against public sources on 31 October 2026. All currency is Korean won (KRW)..

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

K-Water: Utility Account Brief

Format
PDF
Length
10 pages
Edition
October 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Utility Account Brief
Edition
October 2026, First edition
Format
PDF
Length
10 pages
Reference
OFW_EXT_K_WATER_UTILITY_ACCOUNT_BRIEF_c461e35f0dfd
Evidence current to
31 October 2026

14

Explore this report family

More Utility Account Briefs

Explore the same report family covering other utilities.

Watercare Services: Utility Account Brief cover

Watercare Services: Utility Account Brief

An assessment of where Watercare Services will spend its NZ$15.2 billion 10-year programme, how it buys, who already holds its major work and where suppliers should focus first. Watercare must lift capital delivery from NZ$959.5 million in FY2026, NZ$90.5 million below target, to a forecast NZ$1,350.0 million in FY2028. Much of its work already sits with standing panels of 19 renewals partners, while the NZ$1.7 billion Waikato Water Supply Programme, opened to alliance bidders on 2 September 2026, is the largest new opening.
Geography
Auckland (Tāmaki Makaurau), New Zealand
Edition
November 2026, First edition
Length
11 pages
Explore report
Acea: Utility Account Brief cover

Acea: Utility Account Brief

A supplier's guide to Acea's water business: where it spends, how it buys through one central portal, who holds its major contracts and which programmes to target first. Acea invested €890.8 million in water in 2025 and buys centrally for its main companies; Acea Ato 2 alone placed about €322 million of orders with 288 suppliers in 2024. Network, leakage, digital and reuse work is backed by a €450 million EIB package for 2027–2030, while the €1.449 billion Peschiera aqueduct is back before the courts after its first award was annulled.
Geography
Rome and ATO 2 Lazio Centrale, Italy
Edition
November 2026, First edition
Length
11 pages
Explore report
Johannesburg Water: Utility Account Brief cover

Johannesburg Water: Utility Account Brief

A commercial brief for suppliers asking where Johannesburg Water spends, how it buys, which projects are open or emerging and where to focus first. Johannesburg Water budgets R13.06 billion of capital for 2026/27 to 2030/31 and had four sewer-main tenders open on 23 November 2026, closing between 27 January and 4 February 2027. It spent 18% of its R1.704 billion capital budget in the first half of 2025/26 and collected 74.84% of billing in FY2024/25, and late payment has delayed contractors on three projects.
Geography
City of Johannesburg, Gauteng, South Africa
Edition
November 2026, First edition
Length
11 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.