Intelligence Reports/Complete library

Our Future Water Intelligence

Report Library

Search reports by subject, geography and report family. Each product page describes its contents, price and ordering availability.

Paste the caption with your link. Social platforms control how previews appear.

119 reports

Showing 1–24
Utility Intelligence Profile: Dubai Electricity and Water Authority cover

Utility Intelligence Profile: Dubai Electricity and Water Authority

An assessment of how Dubai Electricity and Water Authority's supply, networks, finances, projects and plans to 2030 position it to meet Dubai's growing demand for water and power. DEWA added 120 MIGD of desalination capacity in the first nine months of 2026, reaching 615 MIGD at September 30, 2026, after a 2025 daily peak of 487 MIG had left 8 MIGD of headroom. Group revenue reached AED 32.84 billion in FY2025 (audited), while borrowings rose to AED 43,725.0 million at March 31, 2026.
Geography
Emirate of Dubai, United Arab Emirates
Edition
November 2026, New edition
Length
15 pages
Explore report
Utility Intelligence Profile: National Water Company cover

Utility Intelligence Profile: National Water Company

An assessment of what National Water Company runs, how its networks, wastewater and supply perform against its own targets, and which contracts, tariffs and carbon commitments change its position from 2027. National Water Company's non-revenue water stood at 35% in February 2026 against a 27% target, and supply averaged 20.45 hours a day against 21.9. It treated 99.3% of the wastewater collected in 2024, but 26.33% of treated wastewater was reused, while its first residential tariff block rises from SAR 0.10 to SAR 1 per m³ in January 2027.
Geography
Saudi Arabia — national municipal water and sanitation network
Edition
November 2026, New edition
Length
12 pages
Explore report
Jeddah Water Intelligence Report cover

City Intelligence Report

Jeddah Water Intelligence Report

An assessment of whether Jeddah's networks, sewers and storm drains can deliver the water that an enlarged regional desalination system now supplies, as new tariffs and capital programmes take effect from 2027. Jeddah's bulk supply has expanded at regional scale, with Shuaiba-5 producing 665,000 m³ a day against a 600,000 m³ design, but the city's own weaknesses sit downstream: leakage above 20% (2017), half of its wastewater treated (2021 study) and stormwater projects covering 46% of the city at end-2024. NWC has announced more than SAR 4.1 billion across two Jeddah packages, and from 1 January 2027 the lowest residential block's combined rate rises from SAR 0.15 to SAR 1.50 per m³.
Geography
Jeddah, Saudi Arabia
Edition
November 2026, New edition
Length
31 pages
Explore report
Water Utility of the Future: Department of Energy, Abu Dhabi Emirate cover

Water Utility of the Future

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate

An assessment of how Abu Dhabi's Department of Energy is moving from regulating licensed water companies to planning, monitoring and decarbonizing the emirate's water system as a whole, and what its 2027–2035 milestones depend on. The Department of Energy has set dated system targets, a 40% cut in network water losses by 2035 and a 500 million m³ cut in groundwater abstraction by 2030, of which measures for half had been identified by October 2026. Reverse osmosis reached 45% of water generation at EWEC-contracted plants in 2025, while the RC2 price control that funds the network companies ends on December 31, 2026 with no successor published.
Geography
Abu Dhabi, United Arab Emirates
Edition
November 2026, New edition
Length
16 pages
Explore report
Water Utility of the Future: Electricity and Water Authority cover

Water Utility of the Future

Water Utility of the Future: Electricity and Water Authority

An assessment of how Bahrain's Electricity and Water Authority is changing from owning plants to buying private supply and operating the system, and which awards and targets set its path to 2032. Two private reverse osmosis plants in procurement, Hidd at 60 MIGD and Sitra at 30 MIGD, would add capacity equal to 42.2% of EWA's 213.22 MIGD installed in 2024, but neither had been awarded by 24 November 2026. EWA has set a 23% water loss target for 2032 with staged flow-meter replacement from 2026, while its first solar IPP was retendered with operation now targeted for 31 December 2028.
Geography
Bahrain, Middle East
Edition
November 2026, New edition
Length
15 pages
Explore report
Muscat Water Intelligence Report cover

Muscat Water Intelligence Report

An assessment of whether Muscat's desalination plants, Barka transfers, networks, wastewater programme and the finances of Nama Water Services can keep pace with the capital's demand to 2032. Muscat's own plants total about 431,000 m³ a day, about 64% of 2025 peak demand of 677,000, and even with Ghubrah III (93% complete in November 2026) and the Wadi Dayqah dam plant local capacity would reach about 766,000 m³ a day, just below the 774,000 peak projected for 2032. The utility behind the new contracts drew RO 173.651 million of its RO 428.663 million 2024 operating revenue from government subsidy, while current liabilities exceeded current assets by RO 338 million.
Geography
Oman
Edition
November 2026, First edition
Length
31 pages
Explore report
Water Utility of the Future: National Water Company cover

Water Utility of the Future

Water Utility of the Future: National Water Company

An assessment of how National Water Company is changing from running Saudi Arabia's water and sewer networks itself to managing private operators, concessions and published service targets. National Water Company is placing a 6.6 million m³/day sewage treatment program on 15-year operating contracts and preparing distribution concessions, while non-revenue water stood at 35% in February 2026 against a 27% target. It reported 3.25 million tCO2e of emissions for 2025 and reused 26.33% of treated wastewater in 2024, but its seven service targets and its carbon plan carry no target year.
Geography
Saudi Arabia, Middle East
Edition
November 2026, New edition
Length
12 pages
Explore report
Dubai Water Intelligence Report cover

City Water Intelligence

Dubai Water Intelligence Report

An assessment of whether Dubai's desalinated supply, storage, wastewater and drainage programmes, tariffs and governance can keep pace with a resident population heading for 5.8 million by 2040. DEWA lifted installed desalination capacity from 495 MIGD to 615 MIGD in the year to 30 September 2026, after a 2025 peak of 487 MIG left about 8 MIGD of margin, and has a contracted route to its 735 MIGD target for 2030. The larger open commitments are on the wastewater side: the AED 80 billion sewerage tunnel concessions had preferred bidders but no formal award as of 24 November 2026, while the sewerage fee rises 87% between 2025 and 2027.
Geography
Dubai, United Arab Emirates
Edition
November 2026, New edition
Length
32 pages
Explore report
Abu Dhabi Water Intelligence Report cover

City Water Intelligence

Abu Dhabi Water Intelligence Report

An assessment of whether Abu Dhabi's desalinated supply, networks, wastewater and regulation can keep the capital's water secure and affordable as the price control and the next round of reverse osmosis plants arrive from 2027. Abu Dhabi's drinking-water supply is secure on the regulator's 2023 data, with 98.91% of customers in the ADDC area connected and all of them on continuous supply, and reverse osmosis output up 46% in a year. The open questions are regulatory and resource-led: the RC2 price control, which set a revenue limit of AED 50 billion for 2023–2026, ends on 31 December 2026, and groundwater, about 60% of all water used in the emirate, is pumped at about 20 times natural recharge.
Geography
Abu Dhabi, United Arab Emirates
Edition
November 2026, New edition
Length
30 pages
Explore report
Water Security and Supply Outlook in Oman cover

Water Security and Supply Outlook in Oman

An assessment of whether Oman will have enough water: how reliable its sources are, how supply compares with demand in each zone, its climate exposure and the new supply due. Oman withdraws 117% of its renewable water after environmental flows, yet its drinking water is well supplied in the near term: national desalination capacity was 1.73 million m³ a day at the end of 2024 and the 300,000 m³-a-day Ghubrah III plant is due in Q2 2027. Dhofar's margin is thin, with about 230 thousand m³ a day of contracted desalination and planned well supply against a projected 2032 peak of 240 thousand (calculated).
Geography
Oman
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Infrastructure Investment and Project Pipeline in Oman cover

Water Infrastructure Investment and Project Pipeline in Oman

An assessment of what Oman is building and funding in water, who owns each project, what stage it has reached and how it is financed, for suppliers, contractors and investors. Nama Water Services' master plan sets out RO 11.1 billion to 2050, RO 7.2 billion of it for wastewater, about twice the annual rate of its RO 666 million budget for 2025–2027 (calculated). Bids for the Al Ansab and Al Amerat sewage plant expansions are due on 5 January 2027, while government subsidy made up 40.5% of the utility's 2024 operating revenue.
Geography
Oman
Edition
November 2026, First edition
Length
14 pages
Explore report
Oman Country Intelligence Profile cover

Oman Country Intelligence Profile

A reference overview of who runs Oman's water, where its drinking water comes from, the numbers that define the system, the projects under way and what is changing. Oman withdraws 117% of its renewable water after environmental flows and had 1.73 million m³ a day of desalination capacity at the end of 2024, delivered through one state-owned chain of bulk buyer, utilities and regulator. Its main utility reached 31.70% wastewater coverage in 2025, and RO 7.2 billion of its RO 11.1 billion master plan to 2050 is for wastewater.
Geography
Oman
Edition
November 2026, First edition
Length
14 pages
Explore report
Doha Water Intelligence Report cover

City Water Intelligence

Doha Water Intelligence Report

An assessment of whether Doha's desalinated supply, storage, networks and wastewater system can keep the city's water secure as Facility E, new sewage PPPs and a new water law arrive to 2030. Doha's supply is ample on KAHRAMAA's figures, with 538 MIGD of national desalination capacity against 420 MIGD of demand in 2024, but it is concentrated: Umm Al Houl alone produced about 43% of 2024 plant output, and strategic storage is stated in days rather than months. Physical losses on the national network rose from 3.97% in 2019 to 5.71% in 2023, while most named capital projects around the city are Ashghal sewage, reuse and drainage works.
Geography
Doha, Qatar
Edition
November 2026, New edition
Length
32 pages
Explore report
Muscat City Intelligence Profile cover

Muscat City Intelligence Profile

A reference profile answering who runs Muscat's water, where it comes from, what it costs and which projects will change the capital's supply, wastewater and flood protection from 2027. Muscat's own plants do not cover its demand: the governorate's two contracted desalination plants hold 391,000 m³ a day and two operating NWS plants about 40,000, against 2025 Muscat Zone demand of 606 thousand m³ a day on average and 677 thousand at peak, with the balance carried from the Barka Zone. Ghubrah III, a 300,000 m³ a day plant 93% built in November 2026, is expected to operate from Q2 2027, while water produced for Muscat fell from 233.3 million m³ in 2024 to 202.2 million m³ in 2025.
Geography
Oman
Edition
November 2026, New edition
Length
13 pages
Explore report
Oman Water Intelligence Report cover

Country Water Intelligence

Oman Water Intelligence Report

An assessment of whether Oman's desalination-led water system, its wastewater build-out and the subsidy that funds its utilities can keep pace with demand and its 2040 service targets. Government subsidy made up 40.5% of Nama Water Services' 2024 operating revenue, while its master plan sets out about RO 11.1 billion to 2050, RO 7.2 billion of it for wastewater, where licensed-area coverage was 31.70% in 2025. Demand in the main system ran 44 thousand m³ a day above forecast in 2025, and the 300,000 m³-a-day Ghubrah III plant is 93% complete, with operations expected in Q2 2027.
Geography
Oman, Middle East
Edition
November 2026, New edition
Length
35 pages
Explore report
Kuwait Water Intelligence Report cover

Country Water Intelligence

Kuwait Water Intelligence Report

An assessment of whether Kuwait's desalination-and-power system, its pricing and its institutions can keep pace with demand and climate stress to 2035. Kuwait's water stress reached 3,850.50%, the highest value in FAO's 2025 dataset, and about 180 MIGD of new desalination is under contract for 2029 against a 2035 target of nearly 1 billion imperial gallons a day. Households pay a legacy 800 fils per 1,000 imperial gallons against a press-reported cost of about KD 5 to make 1,000 gallons, and the tariff review described in February 2026 has produced no decision.
Geography
Kuwait, Middle East
Edition
November 2026, New edition
Length
34 pages
Explore report
Water Utility of the Future: Dubai Electricity and Water Authority cover

Water Utility of the Future

Water Utility of the Future: Dubai Electricity and Water Authority

An assessment of how Dubai Electricity and Water Authority is moving from thermal desalination and conventional generation to a reverse osmosis, solar, storage and smart-grid system, and what must happen by 2030. DEWA plans 735 MIGD of desalination by 2030, with reverse osmosis rising from 68 MIGD at the end of 2025 to 308 MIGD on renewable energy, and installed capacity already reached 615 MIGD at September 30, 2026. Clean power supplied 16.23% of generation in 2025, while borrowings rose to AED 43,725,005 thousand at March 31, 2026, a quarter that included a new AED 5,000 million term loan and the Empower purchase.
Geography
Dubai, United Arab Emirates
Edition
November 2026, New edition
Length
16 pages
Explore report
Water Infrastructure Investment and Project Pipeline in Kuwait cover

Water Infrastructure Investment and Project Pipeline in Kuwait

An assessment of which water projects Kuwait is building and buying, who owns and funds them, what stage and value each has reached and where contractors, suppliers and investors can enter. Kuwait's 2026 water investment runs at two speeds: about KD 1.19bn of ministry contracts were signed in 2026, led by the KD 998m to 999.85m North Kabd wastewater plant, while about 180 MIGD of new desalination is under signed contracts and a further 200 MIGD sits in bid evaluation or planning.
Geography
Kuwait
Edition
November 2026, First edition
Length
15 pages
Explore report
Kuwait Country Intelligence Profile cover

Kuwait Country Intelligence Profile

A reference assessment of how Kuwait gets, runs, prices and expands its water: who is responsible, where supply comes from, the key national figures and which projects are changing the system. Kuwait withdraws 3,850.50% of its renewable freshwater and relies on 683.3 MIGD of desalination capacity run by one ministry. Its 2026 build is led by wastewater, with North Kabd under construction at KD 998m to 999.85m, while the 546,000 m3/d Az-Zour North 2 & 3 expansion has not reported financial close.
Geography
Kuwait
Edition
November 2026, First edition
Length
14 pages
Explore report
Water Infrastructure Investment and Project Pipeline in Muscat cover

Water Infrastructure Investment and Project Pipeline in Muscat

An assessment of what is being built and financed for Muscat's water, wastewater and flood protection, by whom, at what stage and value, and which contracts open to bidders by 2027. Muscat's water projects are moving fastest where private capital carries the risk: Ghubrah III, backed by a US$370 million project finance package, was 93% built in November 2026, and bids for the Al Ansab and Al Amerat sewage plant PPP are due on 5 January 2027. Network works of about RO 188 million in Al Seeb and Bawshar rest on Nama Water Services, whose 2024 operating revenue was 40.5% government subsidy, while its RO 11.1 billion master plan puts RO 7.2 billion into wastewater.
Geography
Oman
Edition
November 2026, First edition
Length
14 pages
Explore report
Climate Resilience: Drought and Flood Risk in Jeddah cover

Climate Resilience: Drought and Flood Risk in Jeddah

An assessment of how exposed the water system in Jeddah is to drought and flooding, and how far current programmes, policy and investment reduce that risk. The climate risk documented for Jeddah's water is flooding: 179 mm fell on 24 November 2022, more than the 86.4 mm recorded at Jeddah-KAIA in all of 2018. The city's stormwater programme covered 46% of the city at end-2024 against a 75% target for 2028. Its largest scheme, the KAFA tunnel at about USD 175 million per phase, had no signed agreement as of August 2026.
Geography
Saudi Arabia
Edition
November 2026, First edition
Length
10 pages
Explore report
Water Security and Supply Outlook in Jeddah cover

Water Security and Supply Outlook in Jeddah

An assessment of whether water supply in Jeddah can keep pace with demand, and which sources, projects and policies will decide that. The desalination system that supplies Jeddah has grown since 2024: Shuaiba-5 now produces 665,000 m³/day against a 600,000 m³/day design, Shuaibah 3 Conversion has operated since May 2025 and Rabigh 4 is reported online. These are regional capacities serving Jeddah, Makkah and other towns of the Makkah Region. The city's latest indicators are leakage above 20% (2017) and an academic projection of demand rising from 335 MCM in 2017 to 779 MCM in 2030.
Geography
Saudi Arabia
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Infrastructure Investment and Project Pipeline in Jeddah cover

Water Infrastructure Investment and Project Pipeline in Jeddah

A guide to water infrastructure investment in Jeddah: the programmes and projects planned or under way, who is responsible, the risks to delivery and what to watch. Most of Jeddah's water work still being contracted is in sewers and storm drains: NWC's two 2025 packages carry over SAR 2.3 billion (wastewater) and over SAR 1.8 billion (water) of announced cost, and SR 536.3 million of north Jeddah sewer contracts were awarded in February 2026. The municipality's KAFA tunnel, at about USD 175 million per phase, still had no signed agreement in August 2026, while Prince Fawaz drainage bids close on 15 November 2026.
Geography
Saudi Arabia
Edition
November 2026, First edition
Length
13 pages
Explore report
Jeddah City Intelligence Profile cover

Jeddah City Intelligence Profile

A reference profile of the water system in Jeddah: its sources and supply, the institutions that run it, major projects, tariffs and finance, climate risk and what to watch next. Jeddah's bulk supply has grown at regional scale, with Shuaiba-5 raised to 665,000 m³/day and Shuaibah 3 Conversion operating since May 2025; these plants serve the wider Makkah Region. The city's own weak points are local: leakage above 20% (2017) and stormwater projects covering 46% of the city at end-2024. The capital now moving is local too: NWC packages of over SAR 2.3 billion (wastewater) and over SAR 1.8 billion (water), and municipal drainage contracts.
Geography
Saudi Arabia
Edition
November 2026, First edition
Length
13 pages
Explore report