Intelligence Reports/Utility Intelligence Profile
Utility Intelligence Profile: Denver Water cover

Utility Intelligence Profile

Utility Intelligence Profile: Denver Water

A reference profile of Denver Water: its service mandate, water supply, treatment and networks, wastewater, finances, major projects, tariffs, governance and climate resilience. Denver Water enters 2027 with Gross Reservoir's dam raise topped out and Northwater complete, but in a drought that left storage at 66% on October 26, 2026 against an average of 89%. This profile sets out its mandate, supply, treatment, network, recycled water, finances, tariffs, energy, governance and the milestones due before 2028, with FY 2016–FY 2025 audited series.

Geography
Denver metropolitan area, Colorado, United States
Report type
Utility Research and Reference
Evidence current to
27 October 2026
Format
PDF
Length
14 pages
Edition
October 2026, updated edition
Price
USD 99
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

66% full: reservoir storage on October 26, 2026, against an average of 89% for the date

US$1,685.2 million: total long-term debt at the end of FY 2025, about 3.6 times the FY 2016 level (calculated)

US$1.7 billion: capital investment planned over 10 years (plan, October 2025)

42,000 → 119,000 acre-feet: Gross Reservoir capacity after the dam raise; final roller-compacted concrete placed June 3, 2026; filling possible from 2028

02

Buyer relevance

Who the report is for

Engineering and construction firms

Check the status of Gross Reservoir, the North Reservoir Complex, the Hazeltine pump station and main replacement against published goals before bidding.

Municipal bond analysts

Compare FY 2016–FY 2025 revenue, expenses and long-term debt with the FY 2025 debt-to-gross-revenue ratio of 3.01 and the 2026 drought pricing.

Metering and network technology suppliers

Size the planned upgrade of more than 240,000 meters, estimated at up to US$63 million, against the 3,238.1-mile main network and annual break counts.

Regional water planners and consultants

Use the side-by-side storage, lead inventory and main replacement figures, with their source dates, as a single reference for Denver Water.

03

Decision scope

Questions answered

01

How severe is Denver Water's 2026 drought?

April–July 2026 natural streamflow was 95,000 acre-feet, 22% of normal and the lowest in 110 years of records; storage was 66% full on October 26, 2026.

02

How much debt does Denver Water carry?

Total long-term debt was US$1,685.2 million at the end of FY 2025, about 3.6 times the FY 2016 level, with water revenue bonds at 87.4% of the total.

03

When can the expanded Gross Reservoir start filling?

Dam work is expected to finish in summer 2027 and filling could begin as soon as 2028, depending on snowpack.

04

What do Denver Water customers pay in 2026?

Inside City single-family Tier 1 water costs US$3.02 per 1,000 gallons and Total Service US$4.37, with drought charges of US$1.10 and US$2.20 on Tiers 2 and 3.

05

How far along is lead service line replacement?

More than 35,000 customer-owned lead lines had been replaced by late 2025, against 60,000–64,000 homes with a possible lead line.

04

Inside the report

Inside the complete report

Executive Snapshot

1. Utility and Service Mandate

2. Water Resources and Supply

3. Infrastructure and Treatment

4. Networks and Assets

5. Wastewater and Resource Management

6. Financial Position

7. Investment and Major Projects

8. Tariffs and Customer Context

9. Energy and Sustainability

10. Governance and Regulation

11. Climate and Resilience

12. Forward Developments

Key Intelligence Summary

Source Register

05

Public preview

What to watch next

6. Financial Position

The FY 2026 audited report; any rating action after the drought year; the size of reserve draws.

7. Investment and Major Projects

A refreshed 10-year plan figure with the 2027 budget; Gross Reservoir dam completion; annual lead replacement counts.

8. Tariffs and Customer Context

The adopted 2027 rates and drought charges; whether drought pricing is extended beyond April 30, 2027.

11. Climate and Resilience

Storage at the start of 2027 runoff; any Stage 2 declaration; board action on restrictions for spring 2027.

Sample page · page 8 of 14

Tariffs and Customer Context: 2026 rates by service area, drought charges and the 2027 proposal.

Report page showing a table of 2026 single-family water rates per 1,000 gallons for three Denver Water service areas, drought charges, other charges and a demand table for FY 2016 to FY 2025.

06

Included

What you receive

The complete PDF report: 14 pages, 15 sections, 26 tables and a register of 30 sources.

This edition

October 2026, updated edition. Covers audited results to FY 2025 and an annual series from FY 2016. Includes the 2026 drought through October 26, 2026, the October 1, 2026 lawn watering ban and the 2027 rate proposal. Reports Gross Reservoir's final roller-compacted concrete placement on June 3, 2026, the Tenth Circuit decision of September 15, 2026 and filling possible from 2028. Includes Reclamation's August 21, 2026 Colorado River decision framework for 2027–2036. New edition, October 2026, with evidence current to 27 October 2026. Replaces the earlier edition for new buyers; buyers of an earlier edition keep access to the edition they bought.

07

Evidence & method

Evidence and method

Denver Water's audited annual financial reports for FY 2016–FY 2025, its 2026 Water Quality Report, published 2026 rate schedules and board drought resolutions, project and program pages, and federal Colorado River decision documents, with project and drought status checked to October 27, 2026.

Sources

30 sources, listed in the report's source register. Evidence current to 27 October 2026. Principal data periods: FY 2016–FY 2025 audited results (years ended December 31); 2026 rates and drought measures; calendar 2025 water quality data; project and drought status checked to October 27, 2026. All currency is US dollars..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Our Future Water Intelligence

Water-system research and reference analysis.

    09

    Buyer FAQs

    Before you purchase

    Who can use the report?

    Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

    How is the report delivered?

    The PDF is available to download immediately after confirmed payment, through our secure delivery system.

    Can my organization buy wider access?

    Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

    10

    Utility Intelligence Profile: Denver Water

    Format
    PDF
    Length
    14 pages
    Edition
    October 2026, updated edition
    Price
    USD 99
    Secure Stripe checkout · your paid edition is delivered privately in this browser.

    11

    Report details

    Publication details

    Publisher
    Our Future Water Intelligence
    Report family
    Utility Intelligence Profile
    Report type
    Utility Research and Reference
    Edition
    October 2026, updated edition
    Format
    PDF
    Length
    14 pages
    Reference
    ofw-profile-utility-denver-water-r3_f38c6df817bf
    Evidence current to
    27 October 2026

    14

    Explore this report family

    More Utility Intelligence Profiles

    Explore the same report family covering other utilities.

    Utility Intelligence Profile: Dubai Electricity and Water Authority cover

    Utility Intelligence Profile: Dubai Electricity and Water Authority

    An assessment of how Dubai Electricity and Water Authority's supply, networks, finances, projects and plans to 2030 position it to meet Dubai's growing demand for water and power. DEWA added 120 MIGD of desalination capacity in the first nine months of 2026, reaching 615 MIGD at September 30, 2026, after a 2025 daily peak of 487 MIG had left 8 MIGD of headroom. Group revenue reached AED 32.84 billion in FY2025 (audited), while borrowings rose to AED 43,725.0 million at March 31, 2026.
    Geography
    Emirate of Dubai, United Arab Emirates
    Edition
    November 2026, New edition
    Length
    15 pages
    Explore report
    Utility Intelligence Profile: National Water Company cover

    Utility Intelligence Profile: National Water Company

    An assessment of what National Water Company runs, how its networks, wastewater and supply perform against its own targets, and which contracts, tariffs and carbon commitments change its position from 2027. National Water Company's non-revenue water stood at 35% in February 2026 against a 27% target, and supply averaged 20.45 hours a day against 21.9. It treated 99.3% of the wastewater collected in 2024, but 26.33% of treated wastewater was reused, while its first residential tariff block rises from SAR 0.10 to SAR 1 per m³ in January 2027.
    Geography
    Saudi Arabia — national municipal water and sanitation network
    Edition
    November 2026, New edition
    Length
    12 pages
    Explore report
    Utility Intelligence Profile: Northumbrian Water cover

    Utility Intelligence Profile: Northumbrian Water

    An assessment of what Northumbrian Water supplies and treats in the North East and Essex & Suffolk, how its assets, finances and environmental performance stand, and what its 2025–2030 program must deliver. Northumbrian Water cut storm overflow spills from 40,792 in 2024 to 27,776 in 2025 and reduced regulatory gearing to 61.3% after a £400 million equity injection, yet its Environment Agency rating stayed at two stars as pollution incidents reached 50 per 10,000 km of sewer. Only 27% of year-one enhancement allowance was spent, and Essex entered drought under a temporary use ban.
    Geography
    North East England and Essex & Suffolk, England, United Kingdom
    Edition
    November 2026, First edition
    Length
    15 pages
    Explore report

    Stay informed

    Our Future Water Intelligence updates

    New analysis, water intelligence and report releases, delivered by email.