Intelligence Reports/Water Utility Intelligence Report
Water Utility of the Future: Denver Water cover

Water Utility Intelligence Report

Water Utility of the Future: Denver Water

An assessment of how far Denver Water is moving from service provider to system operator, across digital control, energy and carbon, climate-ready infrastructure, customers, governance and capital planning. Denver Water has built or nearly built its largest projects: Northwater is complete and the Gross Reservoir dam raise was 95% complete in December 2025. This report assesses the harder part of its transition, which is operational and financial: turning advanced metering into customer action, running storage, reuse and hydropower as one system, and funding a US$1.7 billion capital plan while drought pricing cuts water sales.

Geography
Denver, United States
Report type
water utility of the future
Evidence current to
24 October 2026
Format
PDF
Length
13 pages
Edition
October 2026, Second edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

US$1.7 billion: capital investment planned over 10 years (October 2025)

42,000 → 119,000 acre-feet: Gross Reservoir after a 131-foot dam raise, 95% complete in December 2025

More than 240,000: meters to move from radio reading to cellular advanced metering, at up to US$63 million

20%: demand reduction targeted under the Stage 1 drought declared on March 25, 2026

02

Buyer relevance

Who the report is for

Utility executives and strategy teams

A worked case of a utility moving from building assets to operating a connected system, with the run-rates for main replacement, lead removal and meters that now measure its progress.

Metering and technology suppliers

Where Denver Water's digital transition stands: more than 240,000 meters still read by vehicle, a cellular advanced metering program of up to US$63 million, and no published procurement timeline yet.

Engineering firms and contractors

The status and next phases of Gross Reservoir, the Downstream Reservoir Program, main renewal and sediment work, and which programs are most exposed to 2027 budget reductions.

Investors and public sector advisers

How drought pricing, debt growth and AAA ratings interact, and how Colorado River operating rules could shape the new Integrated Resource Plan.

03

Decision scope

Questions answered

01

How far has Denver Water's building program progressed?

Northwater was completed in June 2024, on schedule and under budget, and the Gross Reservoir dam raise was 95% complete in December 2025 after a court halt and a win on appeal. Main renewal runs at about 97,000 feet a year against a goal of more than 145,000.

02

Where does Denver Water stand on digital control?

Customer meters are still read monthly by vehicle. The report sets out the planned cellular metering rollout, what it would change in a drought, and why its value depends on how the data is used.

03

How does the 2026 drought affect the transition?

Revenue is expected to fall in line with a 20% demand cut; the drought surcharge offsets part of it and the rest is to come from cash reserves and budget reductions. The report identifies the programs most exposed.

04

Which decisions come next?

The 2027 Approved Budget, an advanced metering procurement decision, the start of Gross Reservoir filling and the new 50-year Integrated Resource Plan.

04

Inside the report

Inside the complete report

Executive Snapshot

1. From Service Provider to System Operator

2. System Intelligence and Digital Control

3. Energy, Carbon, and Resource Decoupling

4. Infrastructure Strategy for a Non-Stationary Climate

5. Customers, Demand, and the Water Prosumer

6. Governance, Regulation, and Institutional Reform

7. Capital Planning and Financial Architecture

8. Strategic System Roadmap

Conclusion

Source Register

05

Public preview

What to watch next

2. System Intelligence and Digital Control

An AMI procurement decision and a published rollout schedule; whether the first phases target high-use or drought-sensitive customers.

4. Infrastructure Strategy for a Non-Stationary Climate

Completion of the Gross dam raise and the start of filling; main replacement footage against the 145,000-foot goal; progress on the North Reservoir Complex.

5. Customers, Demand, and the Water Prosumer

Actual demand reduction against the 20% target; the scale of drought-related budget reductions; any Stage 2 declaration.

7. Capital Planning and Financial Architecture

The 2027 Approved Budget; any change to the 10-year plan figure; rating agency commentary after the drought year.

Sample page · page 6 of 13

Infrastructure Strategy for a Non-Stationary Climate: climate drivers, the status of each major asset program and the assessment of Gross Reservoir.

Report page 6: a table of climate drivers from warming to 2026 reservoir and snowpack conditions, and a table of asset programs with their scope and status, followed by the assessment of Gross Reservoir and sediment.

06

Included

What you receive

The complete PDF report: 13 pages, 11 sections, 15 tables and a register of 34 sources.

This edition

October 2026, Second edition. Audited financial results through FY 2025. The October 2025 10-year capital plan, 2026 rates and the 2026 drought response. Gross Reservoir after the Tenth Circuit ruling of September 15, 2026. The 2027-2028 Colorado River operating decision signed on August 21, 2026. Second edition, October 2026, with evidence current to 24 October 2026. Replaces the first edition for new buyers; buyers of the first edition keep access to the edition they bought.

07

Evidence & method

Evidence and method

Built on Denver Water's audited annual financial reports, capital plans, rates and drought resolutions, water quality and sustainability reporting, and federal sources including the EPA, the Bureau of Reclamation and the Department of the Interior, with the court rulings on Gross Reservoir.

Sources

34 sources, listed in the report's source register. Evidence current to 24 October 2026. Principal data periods: FY 2025 audited results (year ended December 31, 2025); 2026 rates and drought measures; calendar 2025 water quality data. All currency is US dollars..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Our Future Water Intelligence

Water-system research and reference analysis.

    09

    Buyer FAQs

    Before you purchase

    Who can use the report?

    Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

    How is the report delivered?

    The PDF is available to download immediately after confirmed payment, through our secure delivery system.

    Can my organization buy wider access?

    Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

    10

    Water Utility of the Future: Denver Water

    Format
    PDF
    Length
    13 pages
    Edition
    October 2026, Second edition
    Price
    USD 499
    Secure Stripe checkout · your paid edition is delivered privately in this browser.

    11

    Report details

    Publication details

    Publisher
    Our Future Water Intelligence
    Report family
    Water Utility Intelligence Report
    Report type
    water utility of the future
    Edition
    October 2026, Second edition
    Format
    PDF
    Length
    13 pages
    Reference
    OFW-WUOF-DENVER-20261025-E2
    Evidence current to
    24 October 2026

    14

    Explore this report family

    More Water Utility of the Future reports

    Explore the same report family covering other utilities.

    Water Utility of the Future: Department of Energy, Abu Dhabi Emirate cover

    Water Utility of the Future

    Water Utility of the Future: Department of Energy, Abu Dhabi Emirate

    An assessment of how Abu Dhabi's Department of Energy is moving from regulating licensed water companies to planning, monitoring and decarbonizing the emirate's water system as a whole, and what its 2027–2035 milestones depend on. The Department of Energy has set dated system targets, a 40% cut in network water losses by 2035 and a 500 million m³ cut in groundwater abstraction by 2030, of which measures for half had been identified by October 2026. Reverse osmosis reached 45% of water generation at EWEC-contracted plants in 2025, while the RC2 price control that funds the network companies ends on December 31, 2026 with no successor published.
    Geography
    Abu Dhabi, United Arab Emirates
    Edition
    November 2026, New edition
    Length
    16 pages
    Explore report
    Water Utility of the Future: Water and Sanitation Directorate, City of Cape Town cover

    Water Utility of the Future

    Water Utility of the Future: Water and Sanitation Directorate, City of Cape Town

    An assessment of how Cape Town's Water and Sanitation Directorate is turning a dam-fed network into a diversified, metered and data-managed water system, and what could slow it before 2036. Cape Town's committed New Water Programme, a peak design capacity of 305 Ml/day, is now due by December 2036, while the City expects to reach its raw water allocation within two years. In the meantime it is installing about 83,000 smart meters by February 2029 and opened Faure reuse procurement on 25 September 2026, with 70 Ml/day due by June 2031.
    Geography
    Cape Town, South Africa
    Edition
    November 2026, New edition
    Length
    14 pages
    Explore report
    Water Utility of the Future: Electricity and Water Authority cover

    Water Utility of the Future

    Water Utility of the Future: Electricity and Water Authority

    An assessment of how Bahrain's Electricity and Water Authority is changing from owning plants to buying private supply and operating the system, and which awards and targets set its path to 2032. Two private reverse osmosis plants in procurement, Hidd at 60 MIGD and Sitra at 30 MIGD, would add capacity equal to 42.2% of EWA's 213.22 MIGD installed in 2024, but neither had been awarded by 24 November 2026. EWA has set a 23% water loss target for 2032 with staged flow-meter replacement from 2026, while its first solar IPP was retendered with operation now targeted for 31 December 2028.
    Geography
    Bahrain, Middle East
    Edition
    November 2026, New edition
    Length
    15 pages
    Explore report

    Stay informed

    Our Future Water Intelligence updates

    New analysis, water intelligence and report releases, delivered by email.