At a glance

Scale, service and financial position

≈4,400,000Population served, water supplyFY2025 annual report
3,695,500Population served, sewerageFY2025 annual report
1.8 million m³/dayWater treatment capacityFY2025 annual report
23.70%Non-revenue water2023 (2021: 24.75%)
€364.7 millionTurnoverFY2025 (FY2024: €373.7 million)
6.24%Approved WACC (regulatory return)1st Regulatory Period 2025–2029

01

About the Utility

EYDAP holds the exclusive right under Greek law to provide water supply and sewerage services in its area of competence, and it has also taken over the municipal networks of Megara. Its operating framework is a contract between the Greek State, the EYDAP Asset Company and EYDAP itself, signed in February 2022 and valid until 2040. The Greek State directly and indirectly controls 61.33% of the voting rights. Water supply reaches approximately 4,400,000 residents, more than its sewerage network serves. The Waste, Energy and Water Regulatory Authority has confirmed the company's management adequacy as a water services provider and now approves its tariffs.

02

Water System

All the water EYDAP sourced in 2021 came from surface waters. Under an operation and maintenance contract it also runs the External Water Supply System, which is owned by EYDAP Fixed Assets, while four treatment plants feed approximately 14,300 kilometres of distribution mains. Losses, rather than demand, are the central operating constraint: non-revenue water was calculated at 23.70% in 2023. In 2025, as invoiced consumption edged down, the company replaced approximately 98 km of secondary and tertiary mains and repaired 25,546 emergency damages on a network it describes as outdated.

≈14,300 kmWater supply pipeline network (approximate)FY2025 annual report
55,946,232.00 m³Actual water losses2023

03

Wastewater System

Sewerage is a full part of EYDAP's remit, delivered through a network of approximately 8,716 kilometres. Treatment is concentrated at the Psyttalia wastewater treatment plant, which has an average design flow of one million m³ a day against an average incoming flow of around 650,000 m³ a day. Storms test the system: flooding caused overflows of 2,021,222 m³ in 2022. The company reported no breaches of effluent quality permits, standards or regulations in 2023. Works in East Attica, first described as sewerage and water recycling projects, are the largest item in successive ten-year plans.

≈8,716 kmSewage network (approximate)FY2025 annual report
1,000,000 m³/dayPsyttalia treatment capacity (average design flow)FY2025 annual report · incoming flow around 650,000 m³/day

04

Investment & Priorities

EYDAP's investment programme is set out as an accelerated ten-year plan of €2.5 billion, which is a plan rather than committed spending. Delivery now centres on loss reduction: approximately two million smart meters are being installed, against a strategic goal of reducing losses to 8–9% by 2029. Pricing runs through a regulated asset base framework, under which the regulator approved allowed revenue for the first regulatory period on a WACC of 6.24%. It refused to let EYDAP recover €323 million of earlier costs, a decision the company disputes.

€2.5 billionAccelerated ten-year investment planPlan, stated with FY2025 results
€375,968 thousandApproved financial cost (allowed revenue)2025 · 2029: €415,655 thousand (approved, not outturn)
€323 millionPrior-period recovery refused by the regulator (disputed)Decision of 30 December 2025

Company turnover

Reported actuals, FY2016–FY2025, as stated in each annual financial report

€ million
Company turnover: 2016, 328.8 € million, actual; 2017, 327.3 € million, actual; 2018, 322.4 € million, actual; 2019, 323.7 € million, actual; 2020, 330.3 € million, actual; 2021, 360.8 € million, actual; 2022, 343.5 € million, actual; 2023, 351.6 € million, actual; 2024, 373.7 € million, actual; 2025, 364.7 € million, actual0100200300400328.82016327.32017322.42018323.72019330.32020360.82021343.52022351.62023373.72024364.72025
Actual

Every value is the Company turnover reported in EYDAP's own annual financial report; each report's prior-year comparative matches the previous report. From 2021 turnover includes revenue from the External Water Supply System operation and maintenance contract.

Sources: EYDAP annual financial reports, FY2016–FY2025

05

Sustainability & Resilience

Water scarcity has become the dominant resilience issue. Attica was placed in a state of emergency because of water shortages in November 2025, for six months. EYDAP states that its actions as operator of the External Water Supply System, together with EYDAP Fixed Assets, will add 150 million cubic metres a year to the Athens supply system, a stated effect rather than a delivered volume. Renewable sources provided 73.47% of total energy consumption in 2025. Financially, the company carries no loan obligations.

73.47%Renewable share of total energy consumption2025 (2024: 61.05%)
337,129.77 MWhTotal energy consumption2025
160,568.166 tCO₂eqGross Scope 1 greenhouse gas emissions2025

06

Key Challenges

  1. Securing supply for Attica after the water-shortage emergency declared in November 2025.
  2. Reducing losses on an outdated network toward the company's 8–9% goal for 2029.
  3. Delivering the accelerated €2.5 billion ten-year investment plan, including East Attica works.
  4. Financing the programme while €323 million of prior-period claims remain disputed.
  5. Containing flood-driven wastewater overflows during storms.

07

Major Projects

East Attica works

Largest item in EYDAP's ten-year plans; first described as sewerage and water recycling works, later as 90% EU-funded.

Status / period
Plan
Investment / capacity
~€958 million (in the €2.1 billion plan presented in 2024)

Smart meter installation

Installation of approximately two million smart meters, supporting the goal of reducing losses to 8–9% by 2029.

Status / period
Underway (FY2025 report)
Investment / capacity
≈two million meters

Water network replacement

Replacement of ageing mains for leak reduction; approximately 98 km of secondary and tertiary network replaced in 2025.

Status / period
Ongoing (actual 2025)
Investment / capacity
~€200 mn allocation in the 2021 ten-year plan

Evidence

Sources and reporting periods

This Snapshot draws on EYDAP's annual financial reports for 2016 to 2025, its results presentations, sustainability reports and ESG metrics, and decisions of the Greek Waste, Energy and Water Regulatory Authority on management adequacy and tariffs.

Evidence through: 2026-09-2422 source documents

Report library

Reports on EYDAP S.A.

4 reports available for purchase

Water Utility of the Future: EYDAP S.A. cover

Utility transformation

Water Utility of the Future: EYDAP S.A.

EYDAP is becoming a regulated regional system operator: a €2.5 billion investment plan for 2026–2035, an approved 6.24% WACC for 2025–2029 and about 43 water providers to absorb by July 31, 2027. Its delivery pace is the test, with €77.5 million of investment absorbed in 2025 and the tender for about 2.1 million smart meters now targeted for H1 2027.
Edition
November 2026, First edition
Price
USD 499
Explore report →
Water Systems Overview: EYDAP S.A. cover

Water system overview

Water Systems Overview: EYDAP S.A.

Athens' water system splits supply from service: EYDAP Fixed Assets owns the External Water Supply System, while EYDAP treats and distributes water for approximately 4,400,000 residents. Reservoir reserves recovered from 399.7 to 723.9 million m3 in the first half of 2026 but stayed below 2019 levels, and non-revenue water was 25.46% in H1 2026.
Edition
November 2026, First edition
Price
USD 499
Explore report →
EYDAP S.A.: Utility Account Brief cover

Utility account

EYDAP S.A.: Utility Account Brief

EYDAP has no loan obligations and a €2.5 billion investment plan for 2026–2035, but absorbed €77.5 million in 2025, so its procurement pace is what suppliers should follow. The €94.02 million Rafina-Spata treatment plant re-tender closed for bids on 3 November 2026, and a tender for about 2.1 million smart meters is targeted for H1 2027.
Edition
November 2026, First edition
Price
USD 499
Explore report →

Explore the EYDAP S.A. report collection

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.