Intelligence Reports/Water Utility Intelligence Report
Water Systems Overview: EYDAP S.A. cover

Water Utility Intelligence Report

Water Systems Overview: EYDAP S.A.

An overview of the water system served by EYDAP S.A.: its water resources, governance and institutions, infrastructure and service delivery, and its strategic outlook. Athens' water system splits supply from service: EYDAP Fixed Assets owns the External Water Supply System, while EYDAP treats and distributes water for approximately 4,400,000 residents. Reservoir reserves recovered from 399.7 to 723.9 million m3 in the first half of 2026 but stayed below 2019 levels, and non-revenue water was 25.46% in H1 2026.

Geography
Athens and Attica, Greece
Evidence current to
12 November 2026
Format
PDF
Length
12 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

Approximately 4,400,000 residents: population served with water supply; 3,695,500 with sewerage (FY2025 report, actual)

399.7 → 723.9 million m3: withdrawable reserves of the main reservoirs, January 1 to July 1, 2026 (actual)

25.46%: non-revenue water in H1 2026 (actual; 23.70% in 2023)

€2.5 billion: investment plan for 2026–2035 (plan); €77.5 million was absorbed in 2025 (actual)

02

Buyer relevance

Who the report is for

Water-resource and drought-resilience advisers

See reserve levels, the reserve sources EYDAP activated and the status of the Eurytos diversion in one place.

Public-sector and regulatory analysts

Follow how the State, EYDAP Fixed Assets, the regulator and four laws passed between 2024 and 2026 divide responsibility for Athens' water.

Engineering and operations suppliers

Compare network lengths, treatment capacities and loads, losses and overflow data before scoping work with EYDAP.

Investors following EYDAP

Read the 2025–2029 allowed revenue, the €323 million disputed claim and the €2.5 billion plan against actual absorption of €77.5 million in 2025.

03

Decision scope

Questions answered

01

Who owns Athens' water supply system?

EYDAP Fixed Assets owns the 495 km External Water Supply System, which EYDAP operates under a contract extended to December 31, 2026; the State holds 61.33% of EYDAP's voting rights.

02

How did reserves recover after the 2025 drought?

Withdrawable reserves rose from 399.7 million m3 on January 1, 2026 to 723.9 million m3 on July 1, 2026, mainly from rainfall; EYDAP's reserve-source actions added about 56 million m3.

03

How large is the system EYDAP runs?

Four water treatment plants with 1.8 million m3 a day of capacity, approximately 14,300 km of water mains and 8,716 km of sewers, and five wastewater treatment plants led by Psyttalia.

04

What changes under Law 5325/2026?

EYDAP's jurisdiction extends into Boeotia, Phocis and Evia, with special succession of about 43 providers expected by July 31, 2027.

04

Inside the report

Inside the complete report

Executive Overview

1. Water Resource Profile

2. Governance and Institutional Framework

3. Infrastructure and Service Delivery

Strategic Outlook and Opportunities

Source Register

05

Public preview

What to watch next

1. Water Resource Profile

Reserve levels entering the 2026–2027 hydrological year; any Eurytos tender notice and the decision on its funding; the status of the state of emergency.

2. Governance and Institutional Framework

The regulator's response to the €323 million review request; the Council of State hearing; renewal of the External Water Supply System contract for 2027; the first valuations under Law 5325/2026.

3. Infrastructure and Service Delivery

Full-year 2026 non-revenue water against the 25.46% recorded in H1 2026; mains replacement in full-year 2026; the signing of the two main Eastern Attica plant contracts; any change in Psyttalia overflows.

Strategic Outlook and Opportunities

Award of the Rafina/Spata plant and signing of Marathon; full-year 2026 absorption; the smart-meter tender notice; the first regional investment plans under Law 5325/2026; reserve levels and any Eurytos decision.

Sample page · page 7 of 12

Treatment assets and service performance: capacities and loads, losses, overflows, drinking water quality and customer service.

Report page with tables of EYDAP's treatment plants and their loads, service performance indicators for 2019–2026, and customer service figures.

06

Included

What you receive

The complete PDF report: 12 pages, 6 sections, 17 tables and a register of 22 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

EYDAP's annual financial reports through FY2025 and its H1 2026 semi-annual report, ESG metrics, sustainability reports and drinking water quality data, the regulator's decisions and EYDAP's 2025–2029 tariff proposal, the tariff schedule, and dated press reports on project status checked to November 12, 2026.

Sources

22 sources, listed in the report's source register. Evidence current to 12 November 2026. Principal data periods: FY2025 annual financial report (year ended December 31, 2025); semi-annual financial report for January 1 to June 30, 2026; operating and environmental data for 2021–2025; project and procurement status as of November 12, 2026. All currency is euros..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Systems Overview: EYDAP S.A.

Format
PDF
Length
12 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
12 pages
Reference
OFW_EXT_WATER_SYSTEMS_OVERVIEW_EYDAP_S_A_efb9aa036421
Evidence current to
12 November 2026

14

Explore this report family

More Water Systems Overview reports

Explore the same report family covering other utilities.

Water Systems Overview: Watercare Services cover

Water Systems Overview: Watercare Services

An assessment of whether Auckland's dam and Waikato River supply, Watercare's treatment plants and networks, and its new regulatory settlement can carry a NZ$15.2 billion investment program. Watercare reported results within its Charter standards in FY2026, with real water loss of 11.26% and 7.4 unplanned interruptions per 1,000 connections, but its dams fell to uncomfortably low levels in March 2025 and the replacement of the 1928 Huia plant now runs to 2038. Capital delivered fell to NZ$959.5 million, NZ$90.5 million below target, as borrowings reached NZ$4,699.8 million ahead of the first price-quality path from 1 July 2028.
Geography
Auckland (Tāmaki Makaurau), New Zealand
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: Acea cover

Water Systems Overview: Acea

An assessment of how Rome's water system fits together, from the Peschiera–Marcio springs through Acea Ato 2's networks to the regulators and concession that decide its tariffs and investment. Rome's water system depends on one spring system for most of its supply and loses about four in ten cubic meters in its network: in 2018 Acea Ato 2 abstracted 700.0 Mm³, of which 597.8 Mm³ entered the ATO 2 network. Service quality improved on most ARERA measures between 2019 and 2023, but samples exceeding wastewater discharge limits rose to 9.60%, and the €1.449 billion Peschiera doubling is before the courts after its first award was annulled.
Geography
Rome and ATO 2 Lazio Centrale, Italy
Edition
November 2026, First edition
Length
10 pages
Explore report
Water Systems Overview: Johannesburg Water cover

Water Systems Overview: Johannesburg Water

An overview of how Johannesburg's water system works as a whole, from bulk supply under Rand Water's licence through the utility's network and six wastewater works to the plans that must close its supply gap. Johannesburg used 1,801 Ml/d in June 2024 against the 1,550 Ml/d its plan requires under Rand Water's licence, while non-revenue water was 44.79% in FY2024/25 and total water losses of 207,136 Ml equal about 567 Ml/d. Downstream, the six wastewater works averaged 49% in the 2023/24 Green Drop audit, and new bulk water from Lesotho is expected about 2028.
Geography
City of Johannesburg, Gauteng, South Africa
Edition
November 2026, First edition
Length
11 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.