Intelligence Reports/Complete library

Our Future Water Intelligence

Report Library

Search reports by subject, geography and report family. Each product page describes its contents, price and ordering availability.

Paste the caption with your link. Social platforms control how previews appear.

127 reports

Showing 1–24
Utility Intelligence Profile: Northumbrian Water cover

Utility Intelligence Profile: Northumbrian Water

An assessment of what Northumbrian Water supplies and treats in the North East and Essex & Suffolk, how its assets, finances and environmental performance stand, and what its 2025–2030 program must deliver. Northumbrian Water cut storm overflow spills from 40,792 in 2024 to 27,776 in 2025 and reduced regulatory gearing to 61.3% after a £400 million equity injection, yet its Environment Agency rating stayed at two stars as pollution incidents reached 50 per 10,000 km of sewer. Only 27% of year-one enhancement allowance was spent, and Essex entered drought under a temporary use ban.
Geography
North East England and Essex & Suffolk, England, United Kingdom
Edition
November 2026, First edition
Length
15 pages
Explore report
Utility Intelligence Profile: Affinity Water cover

Utility Intelligence Profile: Affinity Water

A reference profile answering what Affinity Water supplies, how its network and service perform, how it is financed and regulated, and which decisions come next. Affinity Water cut gearing to 69.1% from 77.5% in FY 2025/26 after a £150 million equity injection, and net debt fell to £1,449.4 million. Its service results moved the other way: leakage of 149.11 Ml/d missed its 21.3% reduction commitment and household complaints rose to 18,262.
Geography
England, United Kingdom
Edition
November 2026 edition
Length
13 pages
Explore report
Utility Intelligence Profile: Acea cover

Utility Intelligence Profile: Acea

A reference profile of Acea's water business, answering what the Rome concession covers, how its networks perform, how the group is financed and which projects and decisions come next. Acea's regulated water business now provides about 58% of pro-forma group EBITDA (€819.7 million of €1,420.0 million in 2025), led by Acea Ato 2's Rome concession serving 3,942,215 residents. Service quality has improved on most ARERA measures, but water losses remain close to 40% and the first award of the €1.449 billion Peschiera aqueduct doubling was annulled by the Rome administrative court.
Geography
Rome and ATO 2 Lazio Centrale, Italy
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Utility of the Future: Acea cover

Water Utility of the Future: Acea

An assessment of how Acea is turning Rome's water service into a measured, financed system operation, and whether its Peschiera aqueduct, network program and 2028 targets can be delivered within its concession. Acea is rebuilding the trunk of Rome's water supply and digitizing the network around it, but the award of its €1.449 billion Peschiera aqueduct doubling was annulled by the Rome administrative court (reported 19 November 2026). With 783 measurement districts in place and a 2028 loss target of 41.61%, the program is financed to 2030, while the ATO 2 concession ends on 31 December 2032, before the aqueduct's planned commissioning from April 2034.
Geography
Rome and ATO 2 Lazio Centrale, Italy
Edition
November 2026, First edition
Length
14 pages
Explore report
Water Systems Overview: Acea cover

Water Systems Overview: Acea

An assessment of how Rome's water system fits together, from the Peschiera–Marcio springs through Acea Ato 2's networks to the regulators and concession that decide its tariffs and investment. Rome's water system depends on one spring system for most of its supply and loses about four in ten cubic meters in its network: in 2018 Acea Ato 2 abstracted 700.0 Mm³, of which 597.8 Mm³ entered the ATO 2 network. Service quality improved on most ARERA measures between 2019 and 2023, but samples exceeding wastewater discharge limits rose to 9.60%, and the €1.449 billion Peschiera doubling is before the courts after its first award was annulled.
Geography
Rome and ATO 2 Lazio Centrale, Italy
Edition
November 2026, First edition
Length
10 pages
Explore report
Acea: Utility Account Brief cover

Acea: Utility Account Brief

A supplier's guide to Acea's water business: where it spends, how it buys through one central portal, who holds its major contracts and which programmes to target first. Acea invested €890.8 million in water in 2025 and buys centrally for its main companies; Acea Ato 2 alone placed about €322 million of orders with 288 suppliers in 2024. Network, leakage, digital and reuse work is backed by a €450 million EIB package for 2027–2030, while the €1.449 billion Peschiera aqueduct is back before the courts after its first award was annulled.
Geography
Rome and ATO 2 Lazio Centrale, Italy
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Systems Overview: Thames Water cover

Water Systems Overview: Thames Water

An assessment of whether Thames Water's water resources, institutions and infrastructure can keep London and the Thames Valley supplied and served while its ownership and financing are decided. London ran a 17 Ml/d deficit to target headroom in FY 2025/26, after London leakage ran about 53 Ml/d above forecast and 43.3 Ml/d of deployable output was written down, and reservoir storage stood at 56% against a 77% seasonal average on November 3, 2026. The new supply schemes are years away, so supply security rests on leakage and demand, while statutory net debt of £18,515.5 million and an unapproved recapitalization proposal leave the company's future undecided.
Geography
London and the Thames Valley, England
Edition
November 2026 edition
Length
15 pages
Explore report
Utility Intelligence Profile: Thames Water cover

Utility Intelligence Profile: Thames Water

A reference profile answering what Thames Water runs, how it performs, how it is financed and regulated, and which decisions and milestones come next. Thames Water put 2,568.31 Ml/d into supply and treated 4,343 Ml/d of wastewater in FY 2025/26, on revenue of £3,756.5 million, but its statutory net debt reached £18,515.5 million and leakage rose to 573.7 Ml/d. It now relies on a creditor-provided super senior facility, £2.65 billion of £3 billion drawn by October 15, 2026, while a recapitalization proposal awaits approval.
Geography
London and the Thames Valley, England
Edition
November 2026 edition
Length
14 pages
Explore report
Thames Water: Utility Account Brief cover

Thames Water: Utility Account Brief

A supplier's guide to where Thames Water is spending in AMP8, how it buys, who already holds its major work and which opportunities are open or emerging. Thames Water invested £2.4 billion in the first AMP8 year, £996 million of it on pollution prevention, and has let its estimated £4 billion Major Projects Framework to nine contractor teams with no guaranteed volume. The largest open opportunity is a smart-metering-as-a-service tender of about £1.32 billion, due for award on 20 September 2027, while the company runs on a creditor facility with £2.65 billion of £3 billion drawn by 15 October 2026.
Geography
London and the Thames Valley, England
Edition
November 2026 edition
Length
13 pages
Explore report
Water Utility of the Future: EYATH S.A. cover

Water Utility of the Future: EYATH S.A.

An assessment of how EYATH is turning from Thessaloniki's water and sewerage company into a regional system operator, and what its plans, regulation and funding allow it to deliver by 2030. EYATH has a regulator-approved €221.6 million investment plan for 2025-2029 and a legal deadline of July 31, 2027 to take over water supply, sewerage and irrigation across the Thessaloniki and Chalkidiki regional units. Delivering it means raising investment from €14.3 million completed in 2024 to about €44.3 million a year, with tariffs fixed to 2029 and a proposed EIB loan of about €150 million still under appraisal.
Geography
Thessaloniki, Greece
Edition
November 2026 edition
Length
17 pages
Explore report
Water Systems Overview: EYATH S.A. cover

Water Systems Overview: EYATH S.A.

An overview of whether Thessaloniki's water system, from its river, springs and boreholes to its plants, networks and governing institutions, can absorb the expansion that EYATH takes on by July 2027. Thessaloniki's main source reaches the city through one treatment plant that averaged 93.2% of its first-phase capacity in 2025, while its second phase has slipped to 2027. The system is run by a debt-free, state-controlled company whose tariffs are now fixed to 2029 under a €221.6 million approved investment plan, and which must take over two regional units by July 31, 2027.
Geography
Thessaloniki, Greece
Edition
November 2026 edition
Length
12 pages
Explore report
EYATH S.A.: Utility Account Brief cover

EYATH S.A.: Utility Account Brief

A guide for suppliers to where EYATH spends, how it buys, who holds its major contracts and which Thessaloniki water and wastewater projects are open, confirmed or emerging. EYATH's regulator-approved €221.6 million plan for 2025-2029 averages €44.3 million a year, against €14.3 million of investment completed in 2024. In November 2026 it has open tenders for OT/SCADA telecommunications, server hardware and meter services, and it is preparing a new operation, maintenance and upgrade contract for its water treatment plant.
Geography
Thessaloniki, Greece
Edition
November 2026 edition
Length
11 pages
Explore report
De Watergroep: Utility Account Brief cover

De Watergroep: Utility Account Brief

A supplier's guide to where De Watergroep spends, how it buys under EU utilities rules and through Waterunie Operator, who holds major work, and which programmes to pursue first. De Watergroep spent €162.165 million on mains in 2025, up from €141.475 million, with a €350 million European Investment Bank loan fully signed for its 2023–2028 programme. A joint meter framework estimated at €198,619,000 closed for bids on 7 April 2026, and from 2026 Waterunie Operator runs operations for De Watergroep and Farys.
Geography
West Flanders, East Flanders, Flemish Brabant and Limburg, Flanders, Belgium
Edition
November 2026, First edition
Length
11 pages
Explore report
Utility Intelligence Profile: De Watergroep cover

Utility Intelligence Profile: De Watergroep

A reference profile of what De Watergroep runs, how it is paid, regulated and financed, what it is building, and which milestones to follow toward the full merger with Farys intended by 2032. De Watergroep returned to a €24.1 million profit in 2025 after three loss years, while turnover reached €974.0 million in the first year of a tariff plan that raised tariffs 11.6%. Net debt to EBITDA fell to 5.9 against a limit of 9, but its leakage index of 1.15 remains behind a 2025 target of 1.07.
Geography
West Flanders, East Flanders, Flemish Brabant and Limburg, Flanders, Belgium
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: De Watergroep cover

Water Systems Overview: De Watergroep

An assessment of whether De Watergroep's sources, network, institutions and finances can deliver a climate-robust drinking water system across four Flemish provinces through 2030 and the planned 2032 asset merger with Farys. De Watergroep's water meets standard in about 99.8% of analyses, but its Infrastructure Leakage Index has fallen by only 0.08 since 2022, to 1.15 in 2025, against a target of 0.80 by end-2030. Net purchases over sales equal about 28% of the 174,012,068 m³ it made available in 2025, while key sources such as Kluizen and De Gavers are still being rebuilt.
Geography
West Flanders, East Flanders, Flemish Brabant and Limburg, Flanders, Belgium
Edition
November 2026, First edition
Length
12 pages
Explore report
Vitens: Utility Account Brief cover

Vitens: Utility Account Brief

A supplier's guide to Vitens: how it is organised and makes decisions, its financial position and priorities, how it buys, and the opportunities to target first. Vitens's net investment reached €341.5 million in 2025, up 93% since 2021, and its 2026 tenders include a €7.2 million pump framework and cleaning for about 350 technical sites. Its own 2025 annual report warns of insufficient investment room and plans to phase the investment programme, while objection procedures slow the new source capacity it needs.
Geography
Netherlands
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: HOFOR cover

Water Systems Overview: HOFOR

HOFOR's water service performs well, with 99.5% of water samples compliant and water loss of 6.48% in 2025, but its supply buffer was 11% against the 20–30% it describes as desired. With 5 of 8 new waterworks running and the programme due to finish in 2032, the cost of the rebuild shows in Copenhagen's 2026 price, which HOFOR gives as DKK 49.57 per m3 and the municipal tariff annex as DKK 54.93.
Geography
Greater Copenhagen, Denmark
Edition
November 2026, First edition
Length
13 pages
Explore report
HOFOR: Utility Account Brief cover

HOFOR: Utility Account Brief

HOFOR invested DKK 3,411 million across its businesses in FY2025 and expects that level to continue, but much of its near-term work is already with consortia: three are negotiating the DKK 1.9 billion Svanemøllen tunnel contract. The open entry points for suppliers are the remaining waterworks (Islev out to tender, Gørløse in design), the Thorsbro PFAS add-on, the Spangen basins and a heat-pump programme targeting 300 MW by 2035.
Geography
Greater Copenhagen, Denmark
Edition
November 2026, First edition
Length
11 pages
Explore report
Dŵr Cymru Welsh Water: Utility Account Brief cover

Dŵr Cymru Welsh Water: Utility Account Brief

Dŵr Cymru Welsh Water has a £6.0 billion 2025-30 expenditure allowance, but Ofwat says it has not shown it is on track: water outputs were 23% below baseline in 2025-26 and, while wastewater outputs were 59% ahead, the company underspent its wastewater price control deliverable allowances by 66% and expects less than 40% of wastewater schemes to be with the supply chain by the end of 2026-27. Much of its capital and network work runs through AMP8 frameworks already let, including a £160 million consultancy framework, while the £600 million Cwm Taf scheme is due to start procurement in early 2027.
Geography
Wales
Edition
November 2026, First edition
Length
11 pages
Explore report
Utility Intelligence Profile: Dŵr Cymru Welsh Water cover

Utility Intelligence Profile: Dŵr Cymru Welsh Water

Dŵr Cymru Welsh Water's revenue reached £1,169.8 million in FY2025-26 and its regulatory capital value £8,345.0 million, yet Ofwat rated it off track after it met 6 of 23 performance targets in 2025-26. Leakage of 156.4 litres per property a day, against an industry average of 104.5, and liquidity that fell to £974 million frame the company's position at the start of the 2025-30 price control.
Geography
Wales
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: Dŵr Cymru Welsh Water cover

Water Systems Overview: Dŵr Cymru Welsh Water

Dŵr Cymru Welsh Water met 6 of 23 Ofwat performance targets in 2025-26 and was rated off track, even as revenue rose to £1,169.8 million on a c.30% uplift in household bills. Ofwat found the company had not shown it was on track to deliver its 2025-30 commitments: water outputs were 23% below baseline in 2025-26, and although wastewater outputs ran 59% ahead, wastewater deliverable allowances were 66% underspent and fewer than 40% of wastewater schemes are expected with the supply chain by the end of 2026-27.
Geography
Wales
Edition
November 2026, First edition
Length
13 pages
Explore report
Water Utility of the Future: EYDAP S.A. cover

Water Utility of the Future: EYDAP S.A.

EYDAP is becoming a regulated regional system operator: a €2.5 billion investment plan for 2026–2035, an approved 6.24% WACC for 2025–2029 and about 43 water providers to absorb by July 31, 2027. Its delivery pace is the test, with €77.5 million of investment absorbed in 2025 and the tender for about 2.1 million smart meters now targeted for H1 2027.
Geography
Athens and Attica, Greece
Edition
November 2026, First edition
Length
16 pages
Explore report
Water Systems Overview: EYDAP S.A. cover

Water Systems Overview: EYDAP S.A.

Athens' water system splits supply from service: EYDAP Fixed Assets owns the External Water Supply System, while EYDAP treats and distributes water for approximately 4,400,000 residents. Reservoir reserves recovered from 399.7 to 723.9 million m3 in the first half of 2026 but stayed below 2019 levels, and non-revenue water was 25.46% in H1 2026.
Geography
Athens and Attica, Greece
Edition
November 2026, First edition
Length
12 pages
Explore report
EYDAP S.A.: Utility Account Brief cover

EYDAP S.A.: Utility Account Brief

EYDAP has no loan obligations and a €2.5 billion investment plan for 2026–2035, but absorbed €77.5 million in 2025, so its procurement pace is what suppliers should follow. The €94.02 million Rafina-Spata treatment plant re-tender closed for bids on 3 November 2026, and a tender for about 2.1 million smart meters is targeted for H1 2027.
Geography
Athens and Attica, Greece
Edition
November 2026, First edition
Length
10 pages
Explore report