Free City Snapshot

Copenhagen

Denmark

A groundwater-only city system whose thin supply buffer, contaminated wellfields and cloudburst exposure are driving waterworks renewal, groundwater protection and a pending decision on metropolitan wastewater treatment.

Browse all 4 city reports

Paste the caption with your link. Social platforms control how previews appear.

At a glance

Scale, resources and strategic position

671,714ResidentsStatistics Denmark · Københavns Kommune · 1 January 2026
54.1 million m³Water produced, all from groundwaterHOFOR · eight-municipality supply area · 2025
31.6 million m³Drinking water delivered in CopenhagenHOFOR · Københavns Kommune · 2025
11% vs 20–30% targetAnnual supply bufferHOFOR · eight-municipality supply area · 2025 actual · target has no published deadline
5.8%Water lossHOFOR · Københavns Kommune · 2025 · HOFOR group 6.48%
105 million m³Wastewater treatedBIOFOS · three plants, 15 owner municipalities · 2025

01

City Water System

Copenhagen’s water services are run by HOFOR, the Greater Copenhagen multi-utility, which supplies drinking water and drains wastewater and rainwater across eight municipalities. Within the city, HOFOR Vand København and HOFOR Spildevand København are the regulated companies, each with its own accounts and tariff. The City of Copenhagen is the majority owner, holding 73.59% of HOFOR’s water holding company and 61.37% of its wastewater holding company, and it adopts the city’s water, wastewater and climate-adaptation plans. BIOFOS, owned by 15 municipalities, treats Copenhagen’s wastewater at Lynetten and Damhusåen. Frederiksberg, enclosed by the city, has its own provider. The national Water Sector Supervisory Authority sets the utilities’ economic frameworks.

02

Resources & Supply

Copenhagen draws all its drinking water from groundwater. Wells across Eastern and Central Zealand feed seven regional waterworks, which treat it without chlorine. HOFOR produced 54.1 million m³ in 2025, and 31.6 million m³ was delivered in Copenhagen. There, household use averaged 98 litres a person a day and water loss was 5.8%.

The constraint is spare capacity, not network performance. HOFOR’s supply buffer was 11% in 2025, against a desired 20–30%. Contamination has forced cuts at eight of about 50 wellfields, and voluntary agreements protect less than a fifth of the areas that recharge the regional waterworks. In a June 2026 drought, HOFOR was producing at full capacity and asked customers to save water.

Up to 12 million m³Projected drinking-water shortfallHOFOR supply area · by 2040 · HOFOR projection
8 of about 50Wellfields with production cut by contaminationHOFOR supply area · reported 2026, undated
75%Usable production capacity, limited by PFASThorsbro waterworks, Ishøj · as of January 2025

03

Wastewater & Stormwater

HOFOR collected 41.6 million m³ of wastewater across its eight municipalities in 2025 and sent 98.6% of it to treatment. In Copenhagen, the network includes just over 1,200 km of main sewers. BIOFOS treated 105 million m³ for about 1.25 million residents in 2025, and expects to need around 40% more capacity by 2045. On 13 November 2026 its board is due to choose between expanding the existing plants and moving Lynetten to Prøvestenen. Management recommends the move. HOFOR is also designing retention basins at Spangen and Utterslev Mose to cut overflows into local waters. Construction is expected to start in 2026 and 2027.

About 620,000 PEProjected rise in treatment loadBIOFOS treatment area · to 2045 · projection
DKK 26.5–27.1 billionCost of the two future-plant optionsBIOFOS · move (B) / stay (A) · 2025 prices · EY-corrected estimates
22% → 36%Treatment charge share of the combined water tariffHOFOR København · 2026 to 2043 · BIOFOS projection

04

Investment & Resilience

HOFOR’s Copenhagen water and wastewater companies invested DKK 1,595 million in 2025, up from DKK 952 million in 2023, and forecast DKK 1,609 million for 2026. HOFOR is building or modernising eight waterworks. Regnemark is expected to deliver water in 2028, and permitting for Islev and Gørløse began in 2025.

Cloudburst protection is the other main programme. The Kalvebod Brygge tunnel is due in service for the 2027 season, and early works on the 10 km Svanemøllen tunnel have begun; its main tunnel contract is in tender and the project is now expected to open at the end of 2033. After a change in national rules, the city expects only 59 of 242 planned surface projects to reach the Cloudburst Plan’s 100-year standard. A new climate adaptation strategy is being prepared.

05

Key Challenges

  1. Rebuilding the supply buffer from 11% towards the desired 20–30%.
  2. Protecting wellfields from PFAS and other contamination while voluntary agreements cover less than a fifth of recharge areas.
  3. Expanding metropolitan wastewater treatment by around 40% by 2045 while managing the projected rise in customer bills.
  4. Managing cloudburst risk as fewer planned projects can be built to the 100-year standard.

Evidence

Sources and reporting periods

Drawn from HOFOR’s 2025 annual and local reports, BIOFOS decision papers, City of Copenhagen committee records and climate-adaptation reporting, Statistics Denmark and national agencies. Figures cover the city, HOFOR’s eight-municipality area or BIOFOS’s treatment area, as labelled.

Evidence through October 2026 · 91 sources read

Report library

City reports on Copenhagen

4 reports available for purchase

Climate Resilience: Drought and Flood Risk in Copenhagen cover

Climate Resilience: Drought and Flood Risk in Copenhagen

Copenhagen's cloudburst programme has cut flood risk by about 9-10%, but under funding rules in force since 2021 only 59 of 242 surface projects are expected to reach the 100-year standard. Sea level at Copenhagen is projected to rise 38-86 cm by 2100, and the 2026 heatwave showed that drought now tests a water supply whose buffer was 11% in 2025.
Edition
November 2026, First edition
Price
USD 249
Explore report →
Copenhagen City Intelligence Profile cover

City profile

Copenhagen City Intelligence Profile

Copenhagen's drinking water is entirely groundwater, supplied by the municipally owned utility HOFOR, whose supply buffer fell to 11% in 2025 against a desired 20-30%. The combined 2026 water and wastewater price rose 13% on the city's figures, and BIOFOS faces a DKK 26.5 to 27.1 billion decision on rebuilding metropolitan wastewater treatment.
Edition
November 2026, First edition
Price
USD 99
Explore report →
Water Infrastructure Investment and Project Pipeline in Copenhagen cover

Water Infrastructure Investment and Project Pipeline in Copenhagen

HOFOR invested DKK 1,595 million in Copenhagen's water and wastewater in 2025, mainly in new waterworks and cloudburst tunnels, and the largest live package is the Svanemøllen tunnel contract estimated at DKK 1.9 billion. Behind it, BIOFOS's DKK 26.5 to 27.1 billion rebuild of metropolitan wastewater treatment moves to a principle decision on 13 November 2026, with a final investment decision around 2031.
Edition
November 2026, First edition
Price
USD 249
Explore report →
Water Security and Supply Outlook in Copenhagen cover

Water Security and Supply Outlook in Copenhagen

Copenhagen relies entirely on groundwater, and HOFOR's supply buffer stood at 11% in 2025 against a desired 20-30%. Contamination has cut output at 8 of about 50 wellfields, HOFOR says it needs 12 million m³ a year more output to be sure of supplying everyone in 2040, and the measures with dates add limited volume before 2028.
Edition
November 2026, First edition
Price
USD 249
Explore report →

Explore the Copenhagen report collection

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.