At a glance

Scale, service and financial position

More than 1.4 millionPeople supplied with drinking water2025
95 million m³Drinking water production2025 · actual
3,355 kmDrinking water network length31 December 2025
543 thousandAdministrative connections2025
EUR 141 millionDrinking water turnover2025 · actual
EUR 2.09 per m³Residential drinking water rate (2025: EUR 2.20)2026 · tariff

01

About the Utility

Waternet was the joint water organisation of the City of Amsterdam and the Amstel, Gooi en Vecht water board (AGV), supplying drinking water to more than 1.4 million people in Amsterdam and surrounding areas in 2025. Constituted as a foundation, it carried out all of AGV’s water board tasks, including wastewater treatment, alongside Amsterdam’s water tasks, and it must supply drinking water at cost, making neither profit nor loss. Amsterdam and AGV were fully liable for any deficits in proportion to the tasks assigned. After both executive boards advised a split in May 2024, two separate water organisations have existed since 1 January 2026.

02

Water System

Waternet’s drinking water comes from river water taken from the Lek at Nieuwegein and seepage water from the Bethunepolder, with production sites including Leiduin in the Amsterdam Water Supply Dunes and Weesperkarspel. Leiduin produces 70 billion litres a year, and a 2025 permit allows expansion to 75 billion. Capacity is the binding constraint: Waternet states its current sources are sufficient only until 2030, and a record demand day in July 2025 underlined the pressure. Microbiological quality is strong, with no E. coli detected at either site, but both reported sulfamic acid results above the standard to the national inspectorate.

0 of 730E. coli detections, each production site2025 · actual
23 / 19 ng/lAverage sum of 20 EU PFAS (standard 100 ng/l from 12 January 2026)2025 · actual
3.88%Lead measurements above 5 µg/l (2019–2023 average 5.71%)2024 · actual

Drinking water production

Waternet drinking water production, million m³ per calendar year, 2015–2025 (2017 and 2018 not retained)

million m³
Drinking water production: 2015, 89 million m³, actual; 2016, 91 million m³, actual; 2019, 93 million m³, actual; 2020, 93 million m³, actual; 2021, 90 million m³, actual; 2022, 91 million m³, actual; 2023, 93 million m³, actual; 2024, 95 million m³, actual; 2025, 95 million m³, actual050100892015912016932019932020902021912022932023952024952025
Actual

Company-level actuals from successive Vewin key-figures editions; no values for 2017 or 2018 are shown.

Sources: Vewin, Kerngegevens drinkwater / Drinking water fact sheet, editions 2016, 2017 and 2020–2026.

03

Wastewater System

Waternet treated the wastewater of the Amstel, Gooi en Vecht water board, which in 2015 meant operating 12 treatment plants. It also carried out Amsterdam’s water tasks, where the city’s sewerage programme records about 3,900 km of sewers and a replacement need of roughly 65 km a year as the network ages. Delivering that renewal is the main constraint: the programme notes that fewer than 30 km may actually be replaced of 40 km planned at the start of a year. Since the split, these water-board and city roles sit in separate organisations.

12Wastewater treatment plants operated for AGV (capacity 1,729 thousand population equivalents)2015 · actual
About 3,900 kmSewers in Amsterdam (replacement need roughly 65 km a year)Programme 2022–2027

04

Investment & Priorities

Waternet’s investment priorities centre on supply capacity and system security. The largest is the Leiduin expansion, which would lift dune production from 70 to 75 billion litres a year under its new permit. Earlier commitments added an extra EUR 1 million a year to filter PFAS and EUR 2 million a year for digital security from 2022. Borrowing has grown alongside: outstanding loans had risen to EUR 90.3 million by the end of 2022.

EUR 90.3 millionLoans outstanding (original amount EUR 138.6 million)31 December 2022 · actual
+25.1%Residential drinking water rate change, EUR 1.70 to EUR 2.12 per m³2022 to 2023

05

Sustainability & Resilience

Waternet’s own carbon footprint fell sharply after it switched to Dutch wind power and green gas, and it reports having already met its target of a 94% cut against 2019. Institutional resilience has been the larger question. The national inspectorate placed Waternet under enhanced supervision after finding insufficient control over cybersecurity, and the shareholders judged the shared structure vulnerable before the organisation was divided into separate water-board and city bodies.

4,045.1 tonnes CO₂CO2 Performance Ladder footprint2023 · actual

06

Key Challenges

  1. Securing new drinking water capacity before current sources reach their limit after 2030.
  2. Delivering a clean transition of tasks after the split into two water organisations.
  3. Resolving reported sulfamic acid and chlorate exceedances while meeting the new PFAS standard.
  4. Accelerating sewer replacement, where delivery has lagged the annual renewal need.
  5. Strengthening cybersecurity governance after enhanced supervision by the national inspectorate.

Evidence

Sources and reporting periods

This Snapshot draws on Vewin sector key figures, Waternet’s production-site water quality results, tariff notices, year review and CO2 progress reports, the water board’s annual accounts, Amsterdam’s sewerage programme and national inspectorate reports.

Evidence through: 2026-10-1726 source documents

Report library

Reports on Waternet

4 reports available for purchase

Utility Intelligence Profile: Waternet cover

Utility profile

Utility Intelligence Profile: Waternet

A reference profile of Waternet after its January 1, 2026 split: an Amsterdam drinking water, sewer and urban water company that produced 95 million m3 in 2025, earned €141 million in drinking water turnover and set a 2026 residential rate of €2.09 per m3. It covers mandate, supply, assets, finances, projects, tariffs, carbon, governance and what comes next.
Edition
November 2026, First edition
Price
USD 99
Explore report →
Water Systems Overview: Waternet cover

Water system overview

Water Systems Overview: Waternet

Amsterdam's water system pairs a well-controlled drinking water service, producing 95 million m3 in 2025 from two treatment sites, with a sewer network of about 3,900 km whose renewal has fallen short of plan. The report maps the resources, institutions and assets of the system as it stands after Waternet's January 1, 2026 split.
Edition
November 2026, First edition
Price
USD 499
Explore report →
Water Utility of the Future: Waternet cover

Utility transformation

Water Utility of the Future: Waternet

Waternet was legally split on January 1, 2026 and now works for the City of Amsterdam alone. The report finds that its institutional reform is complete but its capacity program is early: forecast demand rises from about 95 to about 107 million m3 between 2024 and 2035, while its two published projects add about 11 million m3 a year, the larger not in use until 2031.
Edition
November 2026, First edition
Price
USD 499
Explore report →
Waternet: Utility Account Brief cover

Utility account

Waternet: Utility Account Brief

A commercial brief on Waternet after its 1 January 2026 split: a drinking water business with €141 million of turnover in 2025 and a capacity programme led by a second slow sand filter at Weesperkarspel, estimated at €54 million. It sets out how Waternet buys, which tenders are announced or closed, and where suppliers should focus first.
Edition
November 2026, First edition
Price
USD 499
Explore report →

Explore the Waternet report collection

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.