Intelligence Reports/Water Utility Intelligence Report
Water Utility of the Future: Yarra Valley Water cover

Water Utility Intelligence Report

Water Utility of the Future: Yarra Valley Water

An assessment of how far Yarra Valley Water is moving from service provider to system operator, across digital control, energy and carbon, climate-ready infrastructure, customers, governance and capital planning. Yarra Valley Water states it reached net zero for its own operations from 1 July 2025, and it targets about 900,000 digital meters by mid-2032 and a 67% Scope 3 cut by 2030. Its next tests are water losses of 9.6% against a target below 7.3%, cash interest cover of 1.83 times in FY2024-25, and a 2028-33 price submission due in September 2027.

Geography
Northern and eastern Melbourne, Victoria, Australia
Evidence current to
10 November 2026
Format
PDF
Length
17 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

Net zero from 1 July 2025: Yarra Valley Water (YVW) states it reached net zero Scope 1 and 2 emissions from 2025-26, using 100% renewable electricity and Victorian carbon offsets

About 900,000 digital meters by mid-2032: target set in May 2026, with more than 50,000 installed

2.9 → 10 ML/day: new Aurora (Wollert) recycled water plant in early design with John Holland, commissioning expected around 2030

September 2027: 2028-33 price submission due to the Essential Services Commission, after a 40-member Citizens' Jury (August to December 2026)

02

Buyer relevance

Who the report is for

Digital metering and network analytics suppliers

Size the rollout from over 50,000 meters installed toward about 900,000 by mid-2032, and see which loss and demand targets the data must move.

Energy, bioenergy and hydrogen developers

Track the Lilydale ramp-up toward about 55,000 tonnes a year, the Wollert plant and the A$1.7 million hydrogen pilot with its conditional A$11.9 million next stage.

Engineering and construction firms in Melbourne's north and east

See the projects in design or construction, from the 10 ML/day Aurora recycled water plant to the Healesville upgrade, and who holds each contract.

Policy, regulatory and investor analysts

Follow the 2028-33 price review timeline from the Citizens' Jury to the June 2028 decision, with the FY2024-25 financial position behind it.

03

Decision scope

Questions answered

01

How far has Yarra Valley Water's digital meter rollout got?

More than 50,000 meters were installed by 19 May 2026, against a target of about 900,000 by mid-2032.

02

Has Yarra Valley Water reached net zero?

It states it reached net zero Scope 1 and 2 emissions from 1 July 2025, with 100% renewable electricity and Victorian carbon offsets; its FY2024-25 emissions were 7,478 t CO2-e.

03

When will the new Aurora recycled water plant be ready?

It is in early design with John Holland, raising capacity from 2.9 to 10 ML/day, with commissioning expected around 2030.

04

When is the next price plan decided?

Yarra Valley Water submits its 2028-33 plan to the Essential Services Commission in September 2027; the final decision is due in June 2028.

05

What constrains the transition financially?

Cash interest cover fell to 1.83 times in FY2024-25 as finance costs reached A$193.8 million.

04

Inside the report

Inside the complete report

Executive Snapshot

1. From Service Provider to System Operator

2. System Intelligence and Digital Control

3. Energy, Carbon, and Resource Decoupling

4. Infrastructure Strategy for a Non-Stationary Climate

5. Customers, Demand, and the Water Prosumer

6. Governance, Regulation, and Institutional Reform

7. Capital Planning and Financial Architecture

8. Workforce, Capability, and Organisational Change

9. Strategic System Roadmap

Conclusion

Source Register

05

Public preview

What to watch next

2. System Intelligence and Digital Control

The installed count against the mid-2032 target; whether YVW reports loss reductions attributable to digital meters; and the metering budget proposed for 2028-33.

5. Customers, Demand, and the Water Prosumer

The jury's recommendations (recall session March 2027); 2026-27 household use and recycled water share; and the bill path proposed in June 2027.

7. Capital Planning and Financial Architecture

The capital program in the June 2027 draft plan; and any State rating change after the election.

9. Strategic System Roadmap

Publication of costs for Aurora and the metering program; the 2028-33 capital total and bill path; and annual installed-meter and Scope 3 figures against their dates.

Sample page · page 11 of 17

Section 7: the 2023-28 capital program figures and the FY2021-22 to FY2024-25 financial indicators.

Report page with tables of Yarra Valley Water capital program figures, financial indicators from FY2021-22 to FY2024-25, and its balance sheet and funding at 30 June 2025.

06

Included

What you receive

The complete PDF report: 17 pages, 12 sections, 19 tables and a register of 39 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The report draws on Yarra Valley Water's audited annual reports and performance reports, its questionnaires to the Parliament of Victoria, Essential Services Commission price and outcome decisions, Melbourne Water and state water strategies, and Yarra Valley Water project releases and pages current to 10 November 2026.

Sources

39 sources, listed in the report's source register. Evidence current to 10 November 2026. Principal data periods: FY2024-25 audited results (year ended 30 June 2025); 2025-26 outcome results (April 2025 to March 2026); program and project status to 10 November 2026. All currency is Australian dollars (A$)..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Utility of the Future: Yarra Valley Water

Format
PDF
Length
17 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
17 pages
Reference
OFW_EXT_WATER_UTILITY_OF_THE_FUTURE_YARRA_VALLEY_WATER_36e0b60436eb
Evidence current to
10 November 2026

14

Explore this report family

More Water Utility of the Future reports

Explore the same report family covering other utilities.

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate cover

Water Utility of the Future

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate

An assessment of how Abu Dhabi's Department of Energy is moving from regulating licensed water companies to planning, monitoring and decarbonizing the emirate's water system as a whole, and what its 2027–2035 milestones depend on. The Department of Energy has set dated system targets, a 40% cut in network water losses by 2035 and a 500 million m³ cut in groundwater abstraction by 2030, of which measures for half had been identified by October 2026. Reverse osmosis reached 45% of water generation at EWEC-contracted plants in 2025, while the RC2 price control that funds the network companies ends on December 31, 2026 with no successor published.
Geography
Abu Dhabi, United Arab Emirates
Edition
November 2026, New edition
Length
16 pages
Explore report
Water Utility of the Future: Water and Sanitation Directorate, City of Cape Town cover

Water Utility of the Future

Water Utility of the Future: Water and Sanitation Directorate, City of Cape Town

An assessment of how Cape Town's Water and Sanitation Directorate is turning a dam-fed network into a diversified, metered and data-managed water system, and what could slow it before 2036. Cape Town's committed New Water Programme, a peak design capacity of 305 Ml/day, is now due by December 2036, while the City expects to reach its raw water allocation within two years. In the meantime it is installing about 83,000 smart meters by February 2029 and opened Faure reuse procurement on 25 September 2026, with 70 Ml/day due by June 2031.
Geography
Cape Town, South Africa
Edition
November 2026, New edition
Length
14 pages
Explore report
Water Utility of the Future: Electricity and Water Authority cover

Water Utility of the Future

Water Utility of the Future: Electricity and Water Authority

An assessment of how Bahrain's Electricity and Water Authority is changing from owning plants to buying private supply and operating the system, and which awards and targets set its path to 2032. Two private reverse osmosis plants in procurement, Hidd at 60 MIGD and Sitra at 30 MIGD, would add capacity equal to 42.2% of EWA's 213.22 MIGD installed in 2024, but neither had been awarded by 24 November 2026. EWA has set a 23% water loss target for 2032 with staged flow-meter replacement from 2026, while its first solar IPP was retendered with operation now targeted for 31 December 2028.
Geography
Bahrain, Middle East
Edition
November 2026, New edition
Length
15 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.