Intelligence Reports/Water Utility Intelligence Report
Water Utility of the Future: Melbourne Water cover

Water Utility Intelligence Report

Water Utility of the Future: Melbourne Water

An assessment of how far Melbourne Water is moving from service provider to system operator, across digital control, energy and carbon, climate-ready infrastructure, customers, governance and capital planning. Melbourne Water already runs desalination, treatment-plant energy and flood modeling as parts of one system, and the regulator has set a capital benchmark of A$7,307.7 million for 2026–2031. The report finds that net profit after tax fell from A$192.0 million to A$81.7 million between FY2021 and FY2025, and that the halving of net emissions relied mainly on offsets.

Geography
Greater Melbourne and the Port Phillip and Westernport region, Victoria, Australia
Evidence current to
29 October 2026
Format
PDF
Length
16 pages
Edition
October 2026 edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

A$7,307.7 million: capital expenditure benchmark adopted by the Essential Services Commission for 2026–2031 (final decision, 5 June 2026), against A$7.9 billion proposed

150 GL: desalinated water ordered for 2026-27, the plant's maximum ordering level

204,379 t CO2-e: net Scope 1 and 2 emissions in 2024-25 after carbon credits, 50% below baseline; gross emissions were 395,916 t CO2-e

A$711 million: Western Treatment Plant Resource Recovery and Re-Use Complex, planned to be fully operational in 2029

02

Buyer relevance

Who the report is for

Treatment, tunneling and dam contractors

Map the Western Trunk Sewer, Maroondah outlet, Cardinia Dam and treatment plant projects against their published costs and schedules to 2030.

Energy and decarbonization providers

Size the gap between gross emissions of 395,916 t CO2-e in 2024-25 and the 2030 net-zero target.

Digital and control-system vendors

Judge where Melbourne Water's monitoring, digital twin and SCADA programs sit between pilot and operating stage.

Investors and state policy advisers

Read the FY2021–FY2025 financial series and the 2026–2031 regulatory settlement alongside the state's pending supply decisions.

03

Decision scope

Questions answered

01

How much capital spending did the regulator allow for 2026–2031?

The Essential Services Commission adopted a benchmark of A$7,307.7 million, against A$7.9 billion proposed by Melbourne Water.

02

Has Melbourne Water halved its emissions?

Net emissions of 204,379 t CO2-e in 2024-25 were 50% below the baseline, but gross emissions of 395,916 t CO2-e were only about 3% below it.

03

How much desalinated water has been ordered?

The 2026-27 order is 150 GL, the plant's maximum ordering level, with deliveries brought forward to June 2026.

04

How have Melbourne Water's finances changed?

Between FY2021 and FY2025, revenue rose 6.1% while operating and other expenses rose 24.2%, and net profit after tax fell 57.4%.

04

Inside the report

Inside the complete report

Executive Snapshot

1. From Service Provider to System Operator

2. System Intelligence and Digital Control

3. Energy, Carbon, and Resource Decoupling

4. Infrastructure Strategy for a Non-Stationary Climate

5. Customers, Demand, and the Water Prosumer

6. Governance, Regulation, and Institutional Reform

7. Capital Planning and Financial Architecture

8. Workforce, Capability, and Organisational Change

9. Strategic System Roadmap

Conclusion

Source Register

05

Public preview

What to watch next

7. Capital Planning and Financial Architecture

FY2026 results, especially net profit and borrowings; gearing as the capital program ramps up; the annual price adjustments the ESC approves within the 2026–2031 period.

4. Infrastructure Strategy for a Non-Stationary Climate

Storage levels and any restrictions over summer 2026/27; the following year's desalination order; the Water Security Taskforce report due in March 2027; completion of the Hobsons Bay Main Sewer.

6. Governance, Regulation, and Institutional Reform

The Water Security Taskforce report due in March 2027 and the government's response; Melbourne Water's implementation of the five drainage audit recommendations, including public reporting of growth-area performance; any further statement on future ownership options.

9. Strategic System Roadmap

The 2025-26 annual report; the state's choice of the next supply source; delivery milestones on the trunk sewers and the Western Treatment Plant complex.

Sample page · page 7 of 16

Section 4 sets inflows, storage levels and the major asset programs side by side, with cost and status for each.

Report page showing a table of climate and supply indicators from 1913 to 2026 and a table of asset programs including the desalination plant, trunk sewers and treatment plant projects.

06

Included

What you receive

The complete PDF report: 16 pages, 12 sections, 17 tables and a register of 34 sources.

This edition

October 2026 edition.

07

Evidence & method

Evidence and method

The report draws on Melbourne Water annual reports from 2016-17 to 2024-25, Essential Services Commission price decisions for 2016, 2021 and 2026, and Melbourne Water's water supply, sewerage, flood, energy and project publications. Current status is checked against state government releases, Victorian Auditor-General's Office audits, the 2026 Water Outlook and parliamentary proceedings.

Sources

34 sources, listed in the report's source register. Evidence current to 29 October 2026. Principal data periods: FY2025 audited results (year ended 30 June 2025); 2026–2031 regulatory period (Essential Services Commission final decision, 5 June 2026); storage and desalination status to 1 September 2026. Status checked against public sources on 29 October 2026. All currency is Australian dollars (A$)..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Utility of the Future: Melbourne Water

Format
PDF
Length
16 pages
Edition
October 2026 edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
October 2026 edition
Format
PDF
Length
16 pages
Reference
OFW_EXT_WATER_UTILITY_OF_THE_FUTURE_MELBOURNE_WATER_7d6e1e0ed8e9
Evidence current to
29 October 2026

14

Explore this report family

More Water Utility of the Future reports

Explore the same report family covering other utilities.

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate cover

Water Utility of the Future

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate

An assessment of how Abu Dhabi's Department of Energy is moving from regulating licensed water companies to planning, monitoring and decarbonizing the emirate's water system as a whole, and what its 2027–2035 milestones depend on. The Department of Energy has set dated system targets, a 40% cut in network water losses by 2035 and a 500 million m³ cut in groundwater abstraction by 2030, of which measures for half had been identified by October 2026. Reverse osmosis reached 45% of water generation at EWEC-contracted plants in 2025, while the RC2 price control that funds the network companies ends on December 31, 2026 with no successor published.
Geography
Abu Dhabi, United Arab Emirates
Edition
November 2026, New edition
Length
16 pages
Explore report
Water Utility of the Future: Water and Sanitation Directorate, City of Cape Town cover

Water Utility of the Future

Water Utility of the Future: Water and Sanitation Directorate, City of Cape Town

An assessment of how Cape Town's Water and Sanitation Directorate is turning a dam-fed network into a diversified, metered and data-managed water system, and what could slow it before 2036. Cape Town's committed New Water Programme, a peak design capacity of 305 Ml/day, is now due by December 2036, while the City expects to reach its raw water allocation within two years. In the meantime it is installing about 83,000 smart meters by February 2029 and opened Faure reuse procurement on 25 September 2026, with 70 Ml/day due by June 2031.
Geography
Cape Town, South Africa
Edition
November 2026, New edition
Length
14 pages
Explore report
Water Utility of the Future: Electricity and Water Authority cover

Water Utility of the Future

Water Utility of the Future: Electricity and Water Authority

An assessment of how Bahrain's Electricity and Water Authority is changing from owning plants to buying private supply and operating the system, and which awards and targets set its path to 2032. Two private reverse osmosis plants in procurement, Hidd at 60 MIGD and Sitra at 30 MIGD, would add capacity equal to 42.2% of EWA's 213.22 MIGD installed in 2024, but neither had been awarded by 24 November 2026. EWA has set a 23% water loss target for 2032 with staged flow-meter replacement from 2026, while its first solar IPP was retendered with operation now targeted for 31 December 2028.
Geography
Bahrain, Middle East
Edition
November 2026, New edition
Length
15 pages
Explore report