Water Utility of the Future: Massachusetts Water Resources Authority

An assessment of how far the Massachusetts Water Resources Authority is moving from service provider to system operator, across digital control, energy and carbon, climate-ready infrastructure, customers, governance and capital planning. MWRA's next phase is redundancy, overflow control and energy, not treatment capacity: an about US$2.1 billion tunnel program and an about US$1.3 billion draft overflow plan lie ahead, while FY2026 capital spending of US$226.8 million ran about 40% below budget. Capital financing already takes 55.3% of the FY2026 budget, and staff project near-term water rate increases of around 3.9%.

Geography
Greater Boston, Massachusetts, United States
Evidence current to
9 November 2026
Format
PDF
Length
14 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

About US$2.1 billion: Metropolitan Water Tunnel Program estimate; both tunnels operational by 2040 (target; final cost "not yet defined")

US$226.8 million: FY2026 actual capital spending, about 40% below the US$380.3 million budget

About US$1.3 billion: draft Updated CSO Control Plan, designed for zero CSO discharges to the Charles, Mystic and Alewife Brook in a projected 2050 typical rainfall year (draft)

55.3%: share of the FY2026 Current Expense Budget for capital financing (budgeted)

02

Buyer relevance

Who the report is for

Engineering and construction firms in tunnels, wastewater and coastal works

Time bids around South Tunnel bidding in late 2027 and the US$70 million Deer Island Eastern Seawall award planned for FY2027.

Energy developers and equipment suppliers

Size the Deer Island opportunity from a 24.0% own-generation share in FY2025, a CHP projected at 69.3 GWh a year and a US$31 million battery study estimate.

Municipal bond analysts and investors

Weigh 186% and 187% primary coverage in FY2025 against FY2024–FY2028 cap spending forecast at about US$1.1 billion, about US$309 million under the US$1.4 billion cap.

Member community and state policy staff

Follow the draft overflow plan's US$340 million, US$260 million and US$690 million river shares and the lead program's 2032 goal.

03

Decision scope

Questions answered

01

How much is MWRA planning to spend on new water tunnels?

The Metropolitan Water Tunnel Program estimate is about US$2.1 billion, with both tunnels targeted to be operational by 2040; MWRA says the final cost is not yet defined.

02

Is MWRA spending its capital budget?

No. FY2026 capital spending was US$226.8 million, about 40% below the US$380.3 million budget; the FY2027 Final CIP is US$322.1 million.

03

How much of its own electricity does Deer Island produce?

In FY2025 Deer Island produced 34,814,562 kWh of its own electricity against 144,889,154 kWh required, a 24.0% share, down from 34.1% in FY2017.

04

What will the updated overflow plan cost?

The draft Updated CSO Control Plan is about US$1.3 billion in current dollars, designed for zero discharges in a projected 2050 typical rainfall year; the final plan is due in 2027.

04

Inside the report

Inside the complete report

Executive Snapshot

1. From Service Provider to System Operator

2. Energy, Carbon, and Resource Decoupling

3. Infrastructure Strategy for a Non-Stationary Climate

4. Customers, Demand, and the Water Prosumer

5. Governance, Regulation, and Institutional Reform

6. Capital Planning and Financial Architecture

7. Strategic System Roadmap

Conclusion

Source Register

05

Public preview

What to watch next

6. Capital Planning and Financial Architecture

The FY2028 budget and assessment proposal; FY2027 capital spending against the US$322.1 million plan; rating agency commentary at the next bond sale.

7. Strategic System Roadmap

The FY2028–FY2033 capital prioritization; the final CSO plan's cost allocation among communities; South Tunnel procurement documents.

3. Infrastructure Strategy for a Non-Stationary Climate

South Tunnel bidding in late 2027; the Eastern Seawall award in FY2027; Quabbin volume at June 30, 2027.

5. Governance, Regulation, and Institutional Reform

Gulliver's start date; the court's ruling on MWRA's motion; issuance of the final Deer Island permit.

Sample page · page 11 of 14

The Strategic System Roadmap, setting MWRA's overflow, tunnel, energy and lead programs against their milestones from 2026 onward.

Report page with a roadmap table listing MWRA programs by horizon, status and strategic role, and a table of draft overflow plan costs by river.

06

Included

What you receive

The complete PDF report: 14 pages, 10 sections, 18 tables and a register of 26 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The report draws on MWRA's FY2025 annual financial report, its 2026 bond Official Statement and rating agency reports, its FY2024 to FY2027 budgets and capital programs, quarterly performance indicators, the greenhouse gas inventory, and board papers and votes to October 21, 2026.

Sources

26 sources, listed in the report's source register. Evidence current to 9 November 2026. Principal data periods: FY2025 audited results (fiscal years end June 30; FY2025 is the year ended June 30, 2025); FY2026 and FY2027 budgets and capital program; board decisions to October 21, 2026; status checked to November 9, 2026. All currency is US dollars..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Utility of the Future: Massachusetts Water Resources Authority

Format
PDF
Length
14 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
14 pages
Reference
OFW_EXT_WATER_UTILITY_OF_THE_FUTURE_MASSACHUSETTS_WATER_RESOURCES_AUTHORITY_b51d402dd9bf
Evidence current to
9 November 2026

14

Explore this report family

More Water Utility of the Future reports

Explore the same report family covering other utilities.

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate cover

Water Utility of the Future

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate

An assessment of how Abu Dhabi's Department of Energy is moving from regulating licensed water companies to planning, monitoring and decarbonizing the emirate's water system as a whole, and what its 2027–2035 milestones depend on. The Department of Energy has set dated system targets, a 40% cut in network water losses by 2035 and a 500 million m³ cut in groundwater abstraction by 2030, of which measures for half had been identified by October 2026. Reverse osmosis reached 45% of water generation at EWEC-contracted plants in 2025, while the RC2 price control that funds the network companies ends on December 31, 2026 with no successor published.
Geography
Abu Dhabi, United Arab Emirates
Edition
November 2026, New edition
Length
16 pages
Explore report
Water Utility of the Future: Water and Sanitation Directorate, City of Cape Town cover

Water Utility of the Future

Water Utility of the Future: Water and Sanitation Directorate, City of Cape Town

An assessment of how Cape Town's Water and Sanitation Directorate is turning a dam-fed network into a diversified, metered and data-managed water system, and what could slow it before 2036. Cape Town's committed New Water Programme, a peak design capacity of 305 Ml/day, is now due by December 2036, while the City expects to reach its raw water allocation within two years. In the meantime it is installing about 83,000 smart meters by February 2029 and opened Faure reuse procurement on 25 September 2026, with 70 Ml/day due by June 2031.
Geography
Cape Town, South Africa
Edition
November 2026, New edition
Length
14 pages
Explore report
Water Utility of the Future: Electricity and Water Authority cover

Water Utility of the Future

Water Utility of the Future: Electricity and Water Authority

An assessment of how Bahrain's Electricity and Water Authority is changing from owning plants to buying private supply and operating the system, and which awards and targets set its path to 2032. Two private reverse osmosis plants in procurement, Hidd at 60 MIGD and Sitra at 30 MIGD, would add capacity equal to 42.2% of EWA's 213.22 MIGD installed in 2024, but neither had been awarded by 24 November 2026. EWA has set a 23% water loss target for 2032 with staged flow-meter replacement from 2026, while its first solar IPP was retendered with operation now targeted for 31 December 2028.
Geography
Bahrain, Middle East
Edition
November 2026, New edition
Length
15 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.