Intelligence Reports/Water Utility Intelligence Report
Water Utility of the Future: Johannesburg Water cover

Water Utility Intelligence Report

Water Utility of the Future: Johannesburg Water

An assessment of how Johannesburg Water is changing from a City-run service into a ring-fenced operator of its network, and which commitments must be delivered between 2026 and 2033. Johannesburg Water has kept its own water and sanitation revenue since July 1, 2026 and budgets R13.06 billion of capital over five years, rising to R4.384 billion in 2030/31, against R1.312 billion spent in FY2024/25. Its Circular 88 targets take non-revenue water from 44.8% to 29.54% by 2029/30, while the City must cut consumption from 1,801 Ml/d to the 1,550 Ml/d its bulk licence allows.

Geography
City of Johannesburg, Gauteng, South Africa
Evidence current to
23 November 2026
Format
PDF
Length
14 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

R13.06 billion: five-year capital budget for 2026/27–2030/31, from R1.96 billion in 2026/27 to R4.384 billion in 2030/31 (budgeted, Business Plan 2026/27)

44.79% → 29.54%: non-revenue water in FY2024/25 (actual) and the Circular 88 target for 2029/30 (target); the half-year figure for H1 2025/26 was 48.7%

1,801 → 1,550 Ml/d: City consumption in June 2024 (actual) and the reduction required under Rand Water's abstraction licence (target)

140 Ml: new reservoir capacity in a program of 44 reservoirs and towers, with five new towers (program, Executive Mayor, July 2026)

02

Buyer relevance

Who the report is for

Pipe, reservoir and pump-station contractors

Follow a capital budget that rises from R1.96 billion in 2026/27 to R4.384 billion in 2030/31, the 44-reservoir storage program and the late-payment delays on Hursthill 2 and Craigavon.

Leak detection, metering and pressure-management firms

Track the performance-based contract for five district metered areas carrying 22% of system input and the 479 of 714 pressure-reducing valves already rehabilitated.

Development finance institutions and lenders

Weigh the ZAR 750 million IFC proposal on 'Hold', the R13 billion sought for pipe replacement and a collection rate of 74.84% in FY2024/25.

Wastewater treatment and compliance advisers

Set a Green Drop average of 49% and effluent compliance of 70.9% against the City's 85% target for December 2026 and a bulk wastewater budget rising to R1.7 billion.

03

Decision scope

Questions answered

01

What changed for Johannesburg Water in July 2026?

Cash sweeping to the City stopped on June 30, 2026, and single-point accountability for water and sanitation took effect on July 1, 2026 under National Treasury's Metro Trading Services Reform.

02

How large is the capital plan, and is it being spent?

R13.06 billion over 2026/27 to 2030/31; the utility spent 101.64% of its FY2024/25 budget but only 18% of the R1.704 billion 2025/26 budget by December 31, 2025.

03

How far must demand fall?

From 1,801 Ml/d in June 2024 to the 1,550 Ml/d required under Rand Water's licence; Level 2 restrictions from November 21, 2026 aim to cut consumption by 200 million litres a day.

04

When does new bulk water arrive?

The Lesotho Highlands Water Project Phase II was 56.7% complete in September 2026, with impoundment from July 2027 and extra water expected about 2028.

04

Inside the report

Inside the complete report

Executive Snapshot

1. From Service Provider to System Operator

2. System Intelligence and Digital Control

3. Energy, Carbon, and Resource Decoupling

4. Infrastructure Strategy for a Non-Stationary Climate

5. Customers, Demand, and the Water Prosumer

6. Governance, Regulation, and Institutional Reform

7. Capital Planning and Financial Architecture

8. Workforce, Capability, and Organisational Change

9. Strategic System Roadmap

Conclusion

Source Register

05

Public preview

What to watch next

7. Capital Planning and Financial Architecture

The FY2025/26 capital outturn against the R1.704 billion budget; IFC status changing from "Hold"; signature of the pipe-replacement financing; the 2027/28 business plan's restated five-year total.

4. Infrastructure Strategy for a Non-Stationary Climate

Confirmation of Crosby and the B-line in December 2026; Hursthill 2 restarting; award of the 15-reservoir repair package; a completion date for Northern Works Unit 5 Module 2; Polihali impoundment in July 2027.

6. Governance, Regulation, and Institutional Reform

The effluent result for December 2026 against the 85% target; the next Green Drop audit; the outcome of the DWS proceedings; conditions attached to the first tranche of the reform grant.

2. System Intelligence and Digital Control

Award of the five-district contract and the name of the contractor; extension of district metering beyond the first 22% of input; billing on actual readings reaching the 92% target.

Sample page · page 6 of 14

Section 4: Johannesburg Water's storage, bulk supply and wastewater projects, with status checked on November 23, 2026 and the next milestone for each.

Report page with a table listing reservoir, tower, bulk supply and wastewater works projects in Johannesburg, their scope, latest status and next milestone.

06

Included

What you receive

The complete PDF report: 14 pages, 12 sections, 9 tables and a register of 29 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

Johannesburg Water's integrated annual reports to FY2024/25, its business plans to 2026/27 and its 2025/26 mid-year report. Project, funding, tariff, legal and supply status comes from City of Johannesburg statements, parliamentary replies, the IFC disclosure and press reports checked on November 23, 2026.

Sources

29 sources, listed in the report's source register. Evidence current to 23 November 2026. Principal data periods: FY2024/25 Integrated Annual Report (year ended June 30, 2025); mid-year report for H1 FY2025/26 (to December 31, 2025); Business Plan 2026/27; project, tariff, legal and supply status checked on November 23, 2026. Currency is South African rand (R); "R…k" is rand thousand, as printed by the utility.

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Utility of the Future: Johannesburg Water

Format
PDF
Length
14 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
14 pages
Reference
OFW_EXT_WATER_UTILITY_OF_THE_FUTURE_JOHANNESBURG_WATER_06acdc121fde
Evidence current to
23 November 2026

14

Explore this report family

More Water Utility of the Future reports

Explore the same report family covering other utilities.

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate cover

Water Utility of the Future

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate

An assessment of how Abu Dhabi's Department of Energy is moving from regulating licensed water companies to planning, monitoring and decarbonizing the emirate's water system as a whole, and what its 2027–2035 milestones depend on. The Department of Energy has set dated system targets, a 40% cut in network water losses by 2035 and a 500 million m³ cut in groundwater abstraction by 2030, of which measures for half had been identified by October 2026. Reverse osmosis reached 45% of water generation at EWEC-contracted plants in 2025, while the RC2 price control that funds the network companies ends on December 31, 2026 with no successor published.
Geography
Abu Dhabi, United Arab Emirates
Edition
November 2026, New edition
Length
16 pages
Explore report
Water Utility of the Future: Water and Sanitation Directorate, City of Cape Town cover

Water Utility of the Future

Water Utility of the Future: Water and Sanitation Directorate, City of Cape Town

An assessment of how Cape Town's Water and Sanitation Directorate is turning a dam-fed network into a diversified, metered and data-managed water system, and what could slow it before 2036. Cape Town's committed New Water Programme, a peak design capacity of 305 Ml/day, is now due by December 2036, while the City expects to reach its raw water allocation within two years. In the meantime it is installing about 83,000 smart meters by February 2029 and opened Faure reuse procurement on 25 September 2026, with 70 Ml/day due by June 2031.
Geography
Cape Town, South Africa
Edition
November 2026, New edition
Length
14 pages
Explore report
Water Utility of the Future: Electricity and Water Authority cover

Water Utility of the Future

Water Utility of the Future: Electricity and Water Authority

An assessment of how Bahrain's Electricity and Water Authority is changing from owning plants to buying private supply and operating the system, and which awards and targets set its path to 2032. Two private reverse osmosis plants in procurement, Hidd at 60 MIGD and Sitra at 30 MIGD, would add capacity equal to 42.2% of EWA's 213.22 MIGD installed in 2024, but neither had been awarded by 24 November 2026. EWA has set a 23% water loss target for 2032 with staged flow-meter replacement from 2026, while its first solar IPP was retendered with operation now targeted for 31 December 2028.
Geography
Bahrain, Middle East
Edition
November 2026, New edition
Length
15 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.