Intelligence Reports/Water Utility Intelligence Report
Water Utility of the Future: Aguas Andinas cover

Water Utility Intelligence Report

Water Utility of the Future: Aguas Andinas

An assessment of how far Aguas Andinas is moving from service provider to system operator, across digital control, energy and carbon, climate-ready infrastructure, customers, governance and capital planning. Aguas Andinas is shifting from running a single river-to-tap system to managing a portfolio of wells, storage, reservoir connections and treated-water exchanges across the Maipo basin, funded through a CLP 365 billion tariff-linked plan for 2025–2030. The report finds the program financeable on current terms, with the main risks in water rights, a lawsuit against the 2021 irrigator agreement and a drinking water pipe replacement rate of 0.2% in 2025.

Geography
Greater Santiago, Metropolitan Region, Chile
Evidence current to
2 November 2026
Format
PDF
Length
16 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

CLP 365 billion: tariff-linked investment plan for 2025–2030, as optimized (company, May 2026)

7.4%: additional tariff attached to the drought and climate works approved for 2025–2030

19% → about 40%: groundwater share of drinking water production in 2025 (22% in 2024; company, May 2026), and as targeted under the Biociudad roadmap, by 2030 according to one September 2026 report; the company described its current share as about 25% in September 2026

37 hours: supply autonomy during turbidity events, against a stated goal of 96 hours (company, May 2026); the general manager spoke of weeks in September 2026

02

Buyer relevance

Who the report is for

Suppliers of wells, pumping and treatment equipment

Size the Santiago West, Santiago South and Fajas de Canales well fields, which add up to 3,190–3,200 L/s, and see which are under construction.

Credit and equity analysts covering Chilean utilities

Track net debt to EBITDA (3.53x at June 2026), the 75% payout on 2025 earnings and the CLP 200–250 billion average annual investment plan.

Water policy and basin planning teams

Follow how the Retorno Maipo dispute tests private water exchanges under the 2022 Water Code reform and the adaptation plan published in September 2026.

Network and leakage technology providers

Compare loss indicators, such as an infrastructure leakage index of 43.2 in 2025, with renewal rates and the metering programs launched in 2025.

03

Decision scope

Questions answered

01

How much is Aguas Andinas planning to invest in 2025–2030?

The tariff-linked plan is CLP 365 billion as optimized in May 2026, within an average annual investment of CLP 200–250 billion.

02

How long can Santiago keep water flowing during a turbidity event?

The company gives 37 hours of autonomy, against a stated goal of 96 hours.

03

How fast is the drinking water network being renewed?

The FY 2025 report gives a replacement rate of 0.2% for drinking water pipes, which implies a cycle of about 500 years.

04

What does the climate works tariff add to bills?

The 2025–2030 settlement adds a 7.4% tariff for drought and climate works; the May 2026 presentation gives 7.51% phased to 2031.

04

Inside the report

Inside the complete report

Executive Snapshot

1. From Service Provider to System Operator

2. System Intelligence and Digital Control

3. Energy, Carbon, and Resource Decoupling

4. Infrastructure Strategy for a Non-Stationary Climate

5. Customers, Demand, and the Water Prosumer

6. Governance, Regulation, and Institutional Reform

7. Capital Planning and Financial Architecture

8. Strategic System Roadmap

Conclusion

Source Register

05

Public preview

What to watch next

7. Capital Planning and Financial Architecture

FY 2026 capital spending against the CLP 200–250 billion range; net debt to EBITDA at year-end 2026; the payout approved at the April 2027 shareholders' meeting.

6. Governance, Regulation, and Institutional Reform

The first-instance ruling in the Retorno Maipo case; the Maipo basin strategic plan; SISS service-quality sanctions, which feed into the next tariff process.

4. Infrastructure Strategy for a Non-Stationary Climate

Commissioning of the first Santiago West stage in late 2027; reported autonomy hours; El Yeso storage through the 2026–2027 summer.

5. Customers, Demand, and the Water Prosumer

Complaint numbers and their network share in FY 2026; overdue debt; the use of the variable transfer tariff in the 2026–2027 summer.

Sample page · page 7 of 16

Climate drivers, the asset program from Pirque to Retorno Maipo, and autonomy against turbidity outages.

Report page with tables listing Aguas Andinas climate drivers, its storage, well and reuse projects with status, and supply autonomy in hours from 2011 to 2026.

06

Included

What you receive

The complete PDF report: 16 pages, 11 sections, 23 tables and a register of 33 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The report draws on Aguas Andinas' integrated reports and data tables for 2016 to 2025, its H1 2026 financial filing and 2023–2026 investor presentations, and the regulator's 2020–2025 tariff study. It adds Chilean government and climate science publications on the Maipo basin, and press reporting on projects and litigation checked in November 2026.

Sources

33 sources, listed in the report's source register. Evidence current to 2 November 2026. Principal data periods: FY 2025 integrated report and data tables (year ended December 31, 2025); H1 2026 results (six months to June 30, 2026); the 2025–2030 tariff period. Project, rating, legal and regulatory status checked on November 2, 2026. All currency is Chilean pesos (CLP) unless stated..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Utility of the Future: Aguas Andinas

Format
PDF
Length
16 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
16 pages
Reference
OFW_EXT_WATER_UTILITY_OF_THE_FUTURE_AGUAS_ANDINAS_6ade499f7e95
Evidence current to
2 November 2026

14

Explore this report family

More Water Utility of the Future reports

Explore the same report family covering other utilities.

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate cover

Water Utility of the Future

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate

An assessment of how Abu Dhabi's Department of Energy is moving from regulating licensed water companies to planning, monitoring and decarbonizing the emirate's water system as a whole, and what its 2027–2035 milestones depend on. The Department of Energy has set dated system targets, a 40% cut in network water losses by 2035 and a 500 million m³ cut in groundwater abstraction by 2030, of which measures for half had been identified by October 2026. Reverse osmosis reached 45% of water generation at EWEC-contracted plants in 2025, while the RC2 price control that funds the network companies ends on December 31, 2026 with no successor published.
Geography
Abu Dhabi, United Arab Emirates
Edition
November 2026, New edition
Length
16 pages
Explore report
Water Utility of the Future: Water and Sanitation Directorate, City of Cape Town cover

Water Utility of the Future

Water Utility of the Future: Water and Sanitation Directorate, City of Cape Town

An assessment of how Cape Town's Water and Sanitation Directorate is turning a dam-fed network into a diversified, metered and data-managed water system, and what could slow it before 2036. Cape Town's committed New Water Programme, a peak design capacity of 305 Ml/day, is now due by December 2036, while the City expects to reach its raw water allocation within two years. In the meantime it is installing about 83,000 smart meters by February 2029 and opened Faure reuse procurement on 25 September 2026, with 70 Ml/day due by June 2031.
Geography
Cape Town, South Africa
Edition
November 2026, New edition
Length
14 pages
Explore report
Water Utility of the Future: Electricity and Water Authority cover

Water Utility of the Future

Water Utility of the Future: Electricity and Water Authority

An assessment of how Bahrain's Electricity and Water Authority is changing from owning plants to buying private supply and operating the system, and which awards and targets set its path to 2032. Two private reverse osmosis plants in procurement, Hidd at 60 MIGD and Sitra at 30 MIGD, would add capacity equal to 42.2% of EWA's 213.22 MIGD installed in 2024, but neither had been awarded by 24 November 2026. EWA has set a 23% water loss target for 2032 with staged flow-meter replacement from 2026, while its first solar IPP was retendered with operation now targeted for 31 December 2028.
Geography
Bahrain, Middle East
Edition
November 2026, New edition
Length
15 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.