Intelligence Reports/Water Utility Intelligence Report
Water Systems Overview: Seqwater cover

Water Utility Intelligence Report

Water Systems Overview: Seqwater

An overview of the water system served by Seqwater: its water resources, governance and institutions, infrastructure and service delivery, and its strategic outlook. Seqwater supplied 343,554 ML to South East Queensland's retailers in FY 2025-26, about 80% of the 430,000 ML a year its existing system is modeled to yield, while dam upgrades hold the Water Grid at about 88% of full supply. The report sets the region's resources, institutions and assets against a program of new supply and dam repairs whose key decisions fall in 2028.

Geography
South East Queensland, Queensland, Australia
Evidence current to
30 October 2026
Format
PDF
Length
13 pages
Edition
October 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

343,554 ML: drinking water supplied to retailer customers in FY 2025-26, up from about 326,060 ML a year earlier (actual)

430,000 ML a year: the existing system's level of service yield under historical climate, falling to 325,000 ML a year by 2051 under future climate (modeled projection)

About 88%: the SEQ Water Grid's effective full supply level while Wivenhoe, Somerset and North Pine dams are held below full for upgrades (temporary operating limit)

A$534.8 million: capital expenditure in FY 2025-26, the largest in Seqwater's history, against a A$747.3 million budget (actual)

02

Buyer relevance

Who the report is for

Water resource and drought planners

Compare FY 2025-26 supply of 343,554 ML with a modeled yield of 430,000 ML a year, falling to 325,000 ML by 2051, and Grid storage of 82.5% against an 88% ceiling.

Dam, water transfer and treatment contractors

Track the Wyaralong plant, the NPI-3 northern interconnector and the North Pine, Somerset and Wivenhoe upgrades, each estimated above A$1 billion, with their current status and next milestones.

Public sector and regulatory teams

See which decisions sit with the responsible Ministers, the Department and the Queensland Competition Authority, including the price freeze at A$3.517 a kiloliter to June 30, 2028.

Lenders and infrastructure investors

Set capital expenditure of A$534.8 million against a A$747.3 million budget and net debt at 79% of the Regulated Asset Base against a 60% benchmark.

03

Decision scope

Questions answered

01

How close is South East Queensland's demand to its water supply limit?

Retailer supply of 343,554 ML in FY 2025-26 was about 80% of the existing system's 430,000 ML a year modeled yield, and Seqwater's modeling puts the need for new supply at about 2030/31.

02

Why can't the Water Grid fill to 100%?

Wivenhoe is held at 90%, Somerset at 80% and North Pine at 54% of full supply during upgrades, which caps the Grid at about 88%.

03

When does the next major new supply arrive?

The Wyaralong Water Treatment Plant is targeting first water in 2032, after shortlisting two bidders in September 2025.

04

What happens to bulk water prices?

Prices for South East Queensland councils are frozen at A$3.517 a kiloliter for 2026-27 and 2027-28, with the next regulator-recommended prices due from July 1, 2028.

04

Inside the report

Inside the complete report

Executive Overview

1. Water Resource Profile

2. Governance and Institutional Framework

3. Infrastructure and Service Delivery

Strategic Outlook and Opportunities

Source Register

05

Public preview

What to watch next

1. Water Resource Profile

Grid storage against the 70% and 60% triggers through the 2026-27 wet season; publication of the desalination trigger amendment; FY 2025-26 per person demand in the next Water Security Program annual report.

2. Governance and Institutional Framework

The terms of reference for the next QCA bulk water review; legislative amendments to the level of service objectives; the 2026-27 State Borrowing Program approval; any further section 61 directions.

3. Infrastructure and Service Delivery

Capital delivered against the FY 2026-27 budget; South West Pipeline moving to full operation; the next drinking water service annual report; the transition of off-grid towns to Grid supply.

Sample page · page 9 of 13

The strategic program table: dam repairs, new supply and water transfer projects with cost, status at October 30, 2026 and next milestone.

Report page with a table listing the Dam Repair Plan, Lake Macdonald, North Pine, Somerset and Wivenhoe dams, the Toowoomba to Warwick water transfer and the Wyaralong Water Treatment Plant, with scale, status and next milestone columns.

06

Included

What you receive

The complete PDF report: 13 pages, 6 sections, 15 tables and a register of 24 sources.

This edition

October 2026, First edition.

07

Evidence & method

Evidence and method

The report draws on Seqwater's annual reports for FY 2020-21 to FY 2025-26, its Water Security Program 2023 and the 2025 program annual report, its national performance and drinking water quality reports, Queensland Government price pages and ministerial statements, and Seqwater project pages and market briefings checked on October 30, 2026.

Sources

24 sources, listed in the report's source register. Evidence current to 30 October 2026. Principal data periods: FY 2020-21 to FY 2025-26 results (years ended June 30); Water Security Program 2023 and its 2025 annual report (March 2026); bulk water prices for 2026-27 and 2027-28; storage and project status checked against public sources on October 30, 2026. All currency is Australian dollars (A$). Figures marked "calculated" are derived in this report from the values shown..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Systems Overview: Seqwater

Format
PDF
Length
13 pages
Edition
October 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
October 2026, First edition
Format
PDF
Length
13 pages
Reference
OFW_EXT_WATER_SYSTEMS_OVERVIEW_SEQWATER_ec618a0a68bf
Evidence current to
30 October 2026

14

Explore this report family

More Water Systems Overview reports

Explore the same report family covering other utilities.

Water Systems Overview: Watercare Services cover

Water Systems Overview: Watercare Services

An assessment of whether Auckland's dam and Waikato River supply, Watercare's treatment plants and networks, and its new regulatory settlement can carry a NZ$15.2 billion investment program. Watercare reported results within its Charter standards in FY2026, with real water loss of 11.26% and 7.4 unplanned interruptions per 1,000 connections, but its dams fell to uncomfortably low levels in March 2025 and the replacement of the 1928 Huia plant now runs to 2038. Capital delivered fell to NZ$959.5 million, NZ$90.5 million below target, as borrowings reached NZ$4,699.8 million ahead of the first price-quality path from 1 July 2028.
Geography
Auckland (Tāmaki Makaurau), New Zealand
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: Acea cover

Water Systems Overview: Acea

An assessment of how Rome's water system fits together, from the Peschiera–Marcio springs through Acea Ato 2's networks to the regulators and concession that decide its tariffs and investment. Rome's water system depends on one spring system for most of its supply and loses about four in ten cubic meters in its network: in 2018 Acea Ato 2 abstracted 700.0 Mm³, of which 597.8 Mm³ entered the ATO 2 network. Service quality improved on most ARERA measures between 2019 and 2023, but samples exceeding wastewater discharge limits rose to 9.60%, and the €1.449 billion Peschiera doubling is before the courts after its first award was annulled.
Geography
Rome and ATO 2 Lazio Centrale, Italy
Edition
November 2026, First edition
Length
10 pages
Explore report
Water Systems Overview: Johannesburg Water cover

Water Systems Overview: Johannesburg Water

An overview of how Johannesburg's water system works as a whole, from bulk supply under Rand Water's licence through the utility's network and six wastewater works to the plans that must close its supply gap. Johannesburg used 1,801 Ml/d in June 2024 against the 1,550 Ml/d its plan requires under Rand Water's licence, while non-revenue water was 44.79% in FY2024/25 and total water losses of 207,136 Ml equal about 567 Ml/d. Downstream, the six wastewater works averaged 49% in the 2023/24 Green Drop audit, and new bulk water from Lesotho is expected about 2028.
Geography
City of Johannesburg, Gauteng, South Africa
Edition
November 2026, First edition
Length
11 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.