Intelligence Reports/Insight Brief
Water Infrastructure Investment and Project Pipeline in Riyadh cover

Insight Brief

Water Infrastructure Investment and Project Pipeline in Riyadh

A guide to water infrastructure investment in Riyadh: the programmes and projects planned or under way, who is responsible, the risks to delivery and what to watch. Riyadh's water investment runs on two tracks: about SAR 4.6 billion of National Water Company network rounds between May 2024 and April 2025, and privately financed plants and transmission lines procured by SHARAKAT. The largest private scheme, the 685,000 m³ a day Riyadh–Qassim transmission line estimated at about US$2 billion, had no financial close announced by 7 November 2026, while the Riyadh East sewage plant drew five bids and the Central Cluster operations package LTOM16 has bids due on 3 May 2027.

Geography
Saudi Arabia
Evidence current to
7 November 2026
Format
PDF
Length
13 pages
Edition
November 2026, First edition
Price
USD 249
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

About SAR 4.6 billion (calculated): three National Water Company (NWC) Central Cluster capital rounds, 96 projects, May 2024 to April 2025

685,000 m³ a day: Riyadh–Qassim water transmission pipeline, estimated at about US$2 billion; preferred bidder named December 2025, no financial close announced by 7 November 2026

200,000 m³ a day: Al-Haer sewage treatment plant, SAR 1.8 billion or SAR 1.5 billion depending on source; commercial operation targeted for the end of 2026

Five bids: Riyadh East sewage treatment plant, 200,000 m³ a day, received 28 September 2026; commercial operation targeted for 2030

02

Buyer relevance

Who the report is for

Civil, network and EPC contractors

Use the construction and procurement tables to plan bids around NWC's Central Cluster rounds, which in April 2025 alone covered 1,955 km of lines, and around SHARAKAT plants such as Al-Haer, whose EPC contract was US$371 million.

Water and wastewater plant operators

Prepare for LTOM16, the Central Cluster package of 14 plants and 153,000 m³ a day under its original scope, with letters of intent due on 22 February 2027 and bids on 3 May 2027.

Project developers and lenders

Track the Riyadh–Qassim transmission line from its December 2025 preferred bidder to financial close, and the Riyadh East plant, estimated at about US$150 million, from five bids to award.

Equipment suppliers and advisers

Size local-content opportunities against SAR 2.8 billion committed across six localisation opportunities, and follow NWC's concession programme, whose advisers were planned to start in Q3 2026.

03

Decision scope

Questions answered

01

How much is NWC spending directly on Riyadh's networks?

Three Central Cluster rounds between May 2024 and April 2025 total about SAR 4.6 billion across 96 projects; no completion date has been published.

02

Has the Riyadh–Qassim transmission line reached financial close?

No. A preferred bidder was named on 23 December 2025 and MEED reported in July 2026 that close had been tipped for that quarter, but none had been announced by 7 November 2026.

03

When will the Al-Haer sewage plant start operating?

SHARAKAT said in April 2026 that the 200,000 m³ a day plant was on track for commercial operation by the end of 2026; a February 2025 contractor report gave Q3 2027.

04

What private operating contracts are already in force?

A SAR 358 million management contract for distribution and long-term treatment contracts of SAR 1.62 billion and SAR 2.18 billion, about SAR 4.16 billion in total.

05

Is there a single capital total for Riyadh?

No. The largest Riyadh-specific allocation published is more than SAR 14.19 billion for 240 projects in NWC's August 2022 package.

04

Inside the report

Inside the complete report

Executive Snapshot

1. Why This Matters Now in Riyadh

2. Current Position

3. Key Programmes, Projects and Investment

4. Policy, Regulation and Institutions

5. Risks and Constraints

6. Strategic Implications

7. What to Watch

Source Register

05

Public preview

What to watch next

3.4 Private operation contracts in force

Al-Haer's commercial operation notice; Riyadh–Qassim financial close; a Riyadh East preferred bidder; issue of the Riyadh North tender; a fourth NWC Central Cluster round.

4. Policy, Regulation and Institutions

First 2027 billing results; any SWA statement of the 2027 deficit; the appointment of NWC's concession advisers.

5. Risks and Constraints

Any change to the Ministry of Finance deficit model; a published NWC annual report; reconciled figures for Al-Haer and Riyadh–Qassim at financial close or commissioning.

6. Strategic Implications

The make-up of the winning Riyadh East consortium; whether the Riyadh–Qassim close brings in international lenders; whether LTOM16 draws bidders from outside the current operator group.

Sample page · page 7 of 13

Section 3: Riyadh water projects in procurement and the private operation contracts in force, with owners, values, capacities and dates.

Report page showing a table of Riyadh water and wastewater projects in procurement, including the Riyadh–Qassim transmission line and Riyadh East plant, followed by a table of private operation contracts.

06

Included

What you receive

The complete PDF report: 13 pages, 9 sections, 12 tables and a register of 29 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The report draws on the Ministry of Environment, Water and Agriculture's Statistical Book 2024, National Water Company and SHARAKAT announcements and presentations, Saudi Water Authority statements and service guide, Riyadh Municipality releases, company disclosures reported by Argaam, and MEED, Zawya and Smart Water Magazine project reporting, with project and tariff status checked to 7 November 2026.

Sources

29 sources, listed in the report's source register. Evidence current to 7 November 2026. Principal data periods: Ministry of Environment, Water and Agriculture Statistical Book 2024 (reference year 2024); project announcements May 2024 to November 2026; National Water Company indicators to March 2026; project, procurement and tariff status checked to 7 November 2026. Currency is the Saudi riyal (SAR); US dollar figures are shown where sources publish them..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Infrastructure Investment and Project Pipeline in Riyadh

Format
PDF
Length
13 pages
Edition
November 2026, First edition
Price
USD 249
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Insight Brief
Edition
November 2026, First edition
Format
PDF
Length
13 pages
Reference
OFW_EXT_WATER_INFRASTRUCTURE_INVESTMENT_AND_PROJECT_PIPELINE_IN_RIYADH_217a279d86bc
Evidence current to
7 November 2026

14

Explore this report family

More Water Infrastructure Investment and Project Pipeline briefs

Explore the same report family covering other cities.

Water Infrastructure Investment and Project Pipeline in Muscat cover

Water Infrastructure Investment and Project Pipeline in Muscat

An assessment of what is being built and financed for Muscat's water, wastewater and flood protection, by whom, at what stage and value, and which contracts open to bidders by 2027. Muscat's water projects are moving fastest where private capital carries the risk: Ghubrah III, backed by a US$370 million project finance package, was 93% built in November 2026, and bids for the Al Ansab and Al Amerat sewage plant PPP are due on 5 January 2027. Network works of about RO 188 million in Al Seeb and Bawshar rest on Nama Water Services, whose 2024 operating revenue was 40.5% government subsidy, while its RO 11.1 billion master plan puts RO 7.2 billion into wastewater.
Geography
Oman
Edition
November 2026, First edition
Length
14 pages
Explore report
Water Infrastructure Investment and Project Pipeline in Jeddah cover

Water Infrastructure Investment and Project Pipeline in Jeddah

A guide to water infrastructure investment in Jeddah: the programmes and projects planned or under way, who is responsible, the risks to delivery and what to watch. Most of Jeddah's water work still being contracted is in sewers and storm drains: NWC's two 2025 packages carry over SAR 2.3 billion (wastewater) and over SAR 1.8 billion (water) of announced cost, and SR 536.3 million of north Jeddah sewer contracts were awarded in February 2026. The municipality's KAFA tunnel, at about USD 175 million per phase, still had no signed agreement in August 2026, while Prince Fawaz drainage bids close on 15 November 2026.
Geography
Saudi Arabia
Edition
November 2026, First edition
Length
13 pages
Explore report
Water Infrastructure Investment and Project Pipeline in Doha cover

Water Infrastructure Investment and Project Pipeline in Doha

A guide to water infrastructure investment in Doha: the programmes and projects planned or under way, who is responsible, the risks to delivery and what to watch. Doha's water investment runs on two tracks: Facility E, a QAR 13.5bn power and desalination plant financed with a USD 2.97bn co-financing package and due to deliver full water on 1 August 2028, and a flow of Ashghal drainage work led by eight projects worth about QAR 7bn scheduled for tender since February 2026. Delivery risk is visible, with eight delayed Ashghal packages re-awarded to new contractors in October 2026.
Geography
Qatar
Edition
November 2026, First edition
Length
13 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.