Intelligence Reports/Country Intelligence Profile
Qatar Country Intelligence Profile cover

Country Intelligence Profile

Qatar Country Intelligence Profile

A reference profile of the water system in Qatar: its sources and supply, the institutions that run it, major projects, tariffs and finance, climate risk and what to watch next. Qatar supplies virtually all its drinking water from desalination bought from private plants, with 538 MIGD of potable desalination capacity in 2024 against demand of 420 MIGD. This profile sets out where the water comes from, who runs each part of the system, the major projects and their stage, tariffs and finance, and the 2030 targets, and shows that the open question is groundwater, drawn at about four times the aquifers' safe yield.

Geography
Qatar
Report type
National Water Research and Reference
Evidence current to
26 October 2026
Format
PDF
Length
12 pages
Edition
October 2026 edition
Price
USD 99
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

63%, 19% and 18%: shares of desalinated seawater, groundwater and reused treated wastewater in 1,065 million m³ of total water production (2023)

200 million m³ vs 49.6 million m³: estimated groundwater abstraction (2023) against the aquifers' long-term safe yield; 180 million m³ of it went to agriculture

538 MIGD vs 420 MIGD: potable desalination capacity and water demand (2024); capacity is expected to reach 648 MIGD when Facility E is commissioned in 2028

QAR 13.5 billion: value of the Facility E power and water agreement (May 2025), with USD 2,971 million of co-financing signed in January 2026

02

Buyer relevance

Who the report is for

Desalination developers, lenders and equipment suppliers

The single-buyer IWPP model, Facility E's sponsors, financing and commissioning dates, and the supply margin against demand.

Wastewater and network contractors

Which Ashghal and KAHRAMAA projects are under construction, completed or awaiting commissioning, with the published capital plans behind them.

Consultants and policy advisers

Who owns, operates, regulates and prices water in Qatar, the 2025 water law's compliance timetable, and the conflicting 2030 targets side by side.

Agriculture and food security planners

Groundwater abstraction by farms against safe yield, treated wastewater prices for fodder, and the national reduction targets.

03

Decision scope

Questions answered

01

Where does Qatar's water come from?

Of 1,065 million m³ of water in 2023, desalinated seawater supplied 63%, groundwater 19% and reused treated wastewater 18%.

02

How large is the gap between groundwater use and recharge?

Estimated abstraction was 200 million m³ in 2023, about four times the long-term safe yield of 49.6 million m³; 180 million m³ went to agriculture.

03

Is more desalination capacity coming?

Facility E, a QAR 13.5 billion power and water plant, is due to add 110 MIGD of reverse osmosis by 1 August 2028, lifting capacity to an expected 648 MIGD.

04

What do water customers pay?

KAHRAMAA's tariff pages show categories but no rate table; a 2015 schedule reported QAR 4.40 to 7.40 per m³, and Ashghal adds a wastewater fee of 20% of the bill for non-Qatari households and organisations.

04

Inside the report

Inside the complete report

Executive Snapshot

1. Country Water Profile

2. Water Resources and Supply

3. Institutions and Utilities

4. Infrastructure and Major Projects

5. Tariffs and Finance

6. Climate and Resilience

7. Outlook and What to Watch

Source Register

05

Public preview

What to watch next

2. Water Resources and Supply

Well-level metering results; 2025 demand against the 428 MIGD forecast; any reconciliation of the 74.7 and 150.5 million m³ resource figures.

3. Institutions and Utilities

Implementing decisions as the compliance period ends; how the law treats the 2015 groundwater decree; targets under KAHRAMAA's 2026–2030 strategy.

4. Infrastructure and Major Projects

Facility E's 2028 milestones; commissioning of Al Wakrah and Al Wukair and the D-Line; storage plans as the Mega Reservoirs' 2026 horizon passes; a second wastewater PPP phase.

5. Tariffs and Finance

A published tariff resolution or KAHRAMAA schedule; Nebras Energy's third-quarter 2026 results; any KAHRAMAA disclosure of subsidy or cost recovery.

Sample page · page 6 of 12

Infrastructure and Major Projects: owner, value, scope, stage and timeline for Facility E, the Mega Reservoirs, the first wastewater PPP and other projects, with KAHRAMAA and Ashghal capital plans.

Report page 6: a table of major water projects from Facility E to the seasonal storage lagoons with owner, value, scope, stage and timeline, followed by a table of capital plans.

06

Included

What you receive

The complete PDF report: 12 pages, 9 sections, 12 tables and a register of 47 sources.

This edition

October 2026 edition. National Planning Council water statistics for 2023 and KAHRAMAA operating data for 2024 and 2025. Law No. 23 of 2025 on water and the six-month compliance extension from 19 June 2026. Facility E's financing, signed in January 2026, and its 2028 and 2029 commissioning dates. Nebras Energy's audited 2025 results and KAHRAMAA's 2026–2030 strategy; regulatory and project status checked on 26 October 2026. New edition, October 2026, with evidence current to 26 October 2026. Replaces the earlier edition for new buyers; buyers of an earlier edition keep access to the edition they bought.

07

Evidence & method

Evidence and method

Built on National Planning Council water statistics, KAHRAMAA's statistics report and water-sector data, the national open data portal, Nebras Energy's audited accounts, Ashghal and state news agency announcements, project financing releases, Qatar's national strategies and climate submissions, and UN and World Bank series.

Sources

47 sources, listed in the report's source register. Evidence current to 26 October 2026. Principal data periods: National Planning Council water statistics for 2023 (November 2024); KAHRAMAA data for 2023 to 2025; Nebras Energy audited results for 2025; regulatory and project status checked on 26 October 2026. Currency is Qatari riyals (QAR), with US dollars (USD) where the source states them..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Qatar Country Intelligence Profile

Format
PDF
Length
12 pages
Edition
October 2026 edition
Price
USD 99
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Country Intelligence Profile
Report type
National Water Research and Reference
Edition
October 2026 edition
Format
PDF
Length
12 pages
Reference
ofw-profile-country-qat_de934253b326
Evidence current to
26 October 2026

14

Explore this report family

More Country Intelligence Profiles

Explore the same report family covering other countries.

Oman Country Intelligence Profile cover

Oman Country Intelligence Profile

A reference overview of who runs Oman's water, where its drinking water comes from, the numbers that define the system, the projects under way and what is changing. Oman withdraws 117% of its renewable water after environmental flows and had 1.73 million m³ a day of desalination capacity at the end of 2024, delivered through one state-owned chain of bulk buyer, utilities and regulator. Its main utility reached 31.70% wastewater coverage in 2025, and RO 7.2 billion of its RO 11.1 billion master plan to 2050 is for wastewater.
Geography
Oman
Edition
November 2026, First edition
Length
14 pages
Explore report
Kuwait Country Intelligence Profile cover

Kuwait Country Intelligence Profile

A reference assessment of how Kuwait gets, runs, prices and expands its water: who is responsible, where supply comes from, the key national figures and which projects are changing the system. Kuwait withdraws 3,850.50% of its renewable freshwater and relies on 683.3 MIGD of desalination capacity run by one ministry. Its 2026 build is led by wastewater, with North Kabd under construction at KD 998m to 999.85m, while the 546,000 m3/d Az-Zour North 2 & 3 expansion has not reported financial close.
Geography
Kuwait
Edition
November 2026, First edition
Length
14 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.