Intelligence Reports/Complete library

Our Future Water Intelligence

Report Library

Search reports by subject, geography and report family. Each product page describes its contents, price and ordering availability.

Paste the caption with your link. Social platforms control how previews appear.

10 reports

Showing 1–10
Water Utility of the Future: Department of Energy, Abu Dhabi Emirate cover

Water Utility of the Future

Water Utility of the Future: Department of Energy, Abu Dhabi Emirate

An assessment of how Abu Dhabi's Department of Energy is moving from regulating licensed water companies to planning, monitoring and decarbonizing the emirate's water system as a whole, and what its 2027–2035 milestones depend on. The Department of Energy has set dated system targets, a 40% cut in network water losses by 2035 and a 500 million m³ cut in groundwater abstraction by 2030, of which measures for half had been identified by October 2026. Reverse osmosis reached 45% of water generation at EWEC-contracted plants in 2025, while the RC2 price control that funds the network companies ends on December 31, 2026 with no successor published.
Geography
Abu Dhabi, United Arab Emirates
Edition
November 2026, New edition
Length
16 pages
Explore report
Abu Dhabi Water Intelligence Report cover

City Water Intelligence

Abu Dhabi Water Intelligence Report

An assessment of whether Abu Dhabi's desalinated supply, networks, wastewater and regulation can keep the capital's water secure and affordable as the price control and the next round of reverse osmosis plants arrive from 2027. Abu Dhabi's drinking-water supply is secure on the regulator's 2023 data, with 98.91% of customers in the ADDC area connected and all of them on continuous supply, and reverse osmosis output up 46% in a year. The open questions are regulatory and resource-led: the RC2 price control, which set a revenue limit of AED 50 billion for 2023–2026, ends on 31 December 2026, and groundwater, about 60% of all water used in the emirate, is pumped at about 20 times natural recharge.
Geography
Abu Dhabi, United Arab Emirates
Edition
November 2026, New edition
Length
30 pages
Explore report
Water Security and Supply Outlook in Abu Dhabi cover

Water Security and Supply Outlook in Abu Dhabi

Abu Dhabi's desalinated supply met a 2023 peak of 3.59 million m³ a day with transmission interruptions costing only 0.0078% of supply, but the regulator gives installed capacity as both 4.74 and 4.14 million m³ a day, so the margin is about 32% or about 15%. More than 2 million m³ a day of contracted capacity reaches expiry by 2037, and after Mirfa 2 and Shuweihat 4 the next RO plant is uncertain, with Saadiyat at letter of award: cancellation was reported in late 2025, but MEED still described it as being developed by Acciona in April 2026.
Geography
United Arab Emirates
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Infrastructure Investment and Project Pipeline in Abu Dhabi cover

Water Infrastructure Investment and Project Pipeline in Abu Dhabi

Abu Dhabi's water network and wastewater projects are moving through award and procurement, with a US$163 million STEP pumping-station rehabilitation, a 1 million m³ emergency lagoon and the US$775 million Mirfa–Liwa scheme due for bids on 5 January 2027, while the next desalination purchase agreement is unclear: Saadiyat has a letter of award to Acciona but a contested status, with 2025 reports of possible cancellation and MEED still naming Acciona as developer in April 2026. Network investment under RC2 was projected at AED 16.2 billion against about AED 21.3 billion forecast by the companies, and the successor control from 1 January 2027 had not been issued as of 11 November 2026.
Geography
United Arab Emirates
Edition
November 2026, First edition
Length
12 pages
Explore report
Climate Resilience: Drought and Flood Risk in Abu Dhabi cover

Climate Resilience: Drought and Flood Risk in Abu Dhabi

Abu Dhabi's climate risk to water lies in flood, coast and groundwater rather than rainfall drought: potable supply is desalinated and a 2010 study found climate change adds only about 3% to 2050 demand. More than 80 million m³ of rainwater had to be managed in a single week after the late-March 2026 storm, and in May 2026 the government allocated AED 11 billion to five PPP projects for dams, water storage, flood control and stormwater, while the projections cited for heat and sea level date from 2010.
Geography
United Arab Emirates
Edition
November 2026, First edition
Length
9 pages
Explore report
Abu Dhabi City Intelligence Profile cover

Abu Dhabi City Intelligence Profile

Abu Dhabi's potable water is desalinated seawater, and the supply base is moving to reverse osmosis: RO output rose 46% in 2023 while multi-stage flash fell 19.3%, against 1,160 million m³ produced by the plants supplying EWEC's Abu Dhabi system, including two in Fujairah outside the emirate. Taweelah RO operates at full capacity and Mirfa 2's partner ENGIE reports it operational, but Shuweihat 4's Q2 2026 commercial operation had not been announced as of 11 November 2026, and RC2, the price control that caps network revenue, ends on 31 December 2026.
Geography
United Arab Emirates
Edition
November 2026, First edition
Length
12 pages
Explore report