Intelligence Reports/City Intelligence Profile
Hamburg City Intelligence Profile cover

City Intelligence Profile

Hamburg City Intelligence Profile

A reference profile of the water system in Hamburg: its sources and supply, the institutions that run it, major projects, tariffs and finance, climate risk and what to watch next. Hamburg draws all of its drinking water from groundwater in three federal states, and abstraction of 125.3 million m³ in 2025 used 96.5% of the usable yield assessed for HAMBURG WASSER. The profile sets out who runs Hamburg's water, the key supply and financial figures, the major projects, led by the EUR 315.1 million VERA II budget, and the charges approved for 2027.

Geography
Germany
Evidence current to
4 November 2026
Format
PDF
Length
12 pages
Edition
November 2026, First edition
Price
USD 99
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

125.3 against 129.9 million m³: groundwater abstracted in 2025 against the usable yield assessed for HAMBURG WASSER, or 96.5% of it (calculated)

417,797 m³ against 460,000 m³: drinking water supplied on 1 July 2025 against maximum daily supply capacity, with a target of 500,000 m³ a day by 2030

EUR 2.05/m³ → EUR 2.13/m³: net drinking-water price in 2026 and the price approved by the Senate for 2027 (+3.9%)

EUR 315.1 million: budget for the VERA II sludge incineration expansion approved on 10 September 2026, EUR 71.2 million above the previously approved budget

02

Buyer relevance

Who the report is for

Network and waterworks contractors

Locate the 270 km mains renewal to 2035 and the Stellingen, Curslack and Langenhorn works behind the 500,000 m³ a day capacity target.

Lenders and public-finance analysts

Compare HWW's 23.9% equity ratio with HSE's 61.3% and the EUR 300 million EIB loan behind the wastewater programme.

Treatment-plant and energy suppliers

Track VERA II, the 60 MW heat pump and phosphorus recovery at the treatment plant against their budgets and stages.

Consultancies new to the Hamburg market

Identify which city body owns, prices, licenses and supervises each part of the water system before a first approach.

03

Decision scope

Questions answered

01

Where does Hamburg's drinking water come from?

All of it is groundwater: 77.6 million m³ was abstracted in Hamburg in 2025, 31.7 million m³ in Schleswig-Holstein and 16.0 million m³ in Niedersachsen.

02

How close is demand to supply capacity?

On 1 July 2025 HAMBURG WASSER supplied 417,797 m³ against maximum daily capacity of 460,000 m³, and it targets 500,000 m³ a day by 2030.

03

How much are water charges rising?

The net drinking-water price rises from EUR 2.05/m³ in 2026 to EUR 2.13/m³ in 2027, approved by the Senate on 20 October 2026.

04

How much is HAMBURG WASSER investing?

It plans EUR 1.15 billion for 2025–2029; the two companies invested EUR 227.8 million in 2025.

05

What has happened to the VERA II budget?

The supervisory board approved EUR 315.1 million for the expansion on 10 September 2026, EUR 71.2 million above the previous budget.

04

Inside the report

Inside the complete report

Executive Snapshot

1. City Water Profile

2. Water Resources and Supply

3. Institutions and Utilities

4. Infrastructure and Major Projects

5. Tariffs and Finance

6. Climate and Resilience

7. Outlook and What to Watch

Source Register

05

Public preview

What to watch next

2. Water Resources and Supply

The appeal court's decision on the Nordheide permit; the next reassessment of usable yield; whether peak days in 2026 exceed 2025.

4. Infrastructure and Major Projects

The VERA II commissioning date; the refurbishment estimate due in Q2 2027; heat-pump commissioning; contract awards for Langenhorn and Curslack.

5. Tariffs and Finance

The 2027 wastewater and stormwater fees; HSE's 2026 investment against plan and HWW's equity ratio (annual report, mid-2027); further EIB or green financing.

7. Outlook and What to Watch

The 2027 fee ordinance, the VERA II commissioning announcement, the German transposition bill for the wastewater directive and the Nordheide hearing date.

Sample page · page 6 of 12

Assets and major projects, from Section 4, Infrastructure and Major Projects.

Report page with a table of Hamburg's water and sewer assets followed by a project table listing owner, value, stage and timeline for mains renewal, waterworks capacity and VERA II.

06

Included

What you receive

The complete PDF report: 12 pages, 9 sections, 13 tables and a register of 26 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The profile draws on HAMBURG WASSER's 2025 annual report, environmental statement, Water Report and press releases, its price lists and fee schedules, and official population, land and economic statistics from Statistikamt Nord. It also uses Senate and BUKEA material on flood protection and climate adaptation, and the European Investment Bank's project record for the wastewater programme.

Sources

26 sources, listed in the report's source register. Evidence current to 4 November 2026. Principal data periods: HAMBURG WASSER financial year 2025 (calendar year) audited results and operating figures; hydrological year November 2024 to October 2025; official population at 31 December 2025; prices and fees in force for 2026 and approved for 2027; project and legal status re-checked on 4 November 2026. All currency is euros (EUR)..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Hamburg City Intelligence Profile

Format
PDF
Length
12 pages
Edition
November 2026, First edition
Price
USD 99
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
City Intelligence Profile
Edition
November 2026, First edition
Format
PDF
Length
12 pages
Reference
OFW_EXT_HAMBURG_CITY_INTELLIGENCE_PROFILE_81c760801471
Evidence current to
4 November 2026

14

Explore this report family

More City Intelligence Profiles

Explore the same report family covering other cities.

Muscat City Intelligence Profile cover

Muscat City Intelligence Profile

A reference profile answering who runs Muscat's water, where it comes from, what it costs and which projects will change the capital's supply, wastewater and flood protection from 2027. Muscat's own plants do not cover its demand: the governorate's two contracted desalination plants hold 391,000 m³ a day and two operating NWS plants about 40,000, against 2025 Muscat Zone demand of 606 thousand m³ a day on average and 677 thousand at peak, with the balance carried from the Barka Zone. Ghubrah III, a 300,000 m³ a day plant 93% built in November 2026, is expected to operate from Q2 2027, while water produced for Muscat fell from 233.3 million m³ in 2024 to 202.2 million m³ in 2025.
Geography
Oman
Edition
November 2026, New edition
Length
13 pages
Explore report
Jeddah City Intelligence Profile cover

Jeddah City Intelligence Profile

A reference profile of the water system in Jeddah: its sources and supply, the institutions that run it, major projects, tariffs and finance, climate risk and what to watch next. Jeddah's bulk supply has grown at regional scale, with Shuaiba-5 raised to 665,000 m³/day and Shuaibah 3 Conversion operating since May 2025; these plants serve the wider Makkah Region. The city's own weak points are local: leakage above 20% (2017) and stormwater projects covering 46% of the city at end-2024. The capital now moving is local too: NWC packages of over SAR 2.3 billion (wastewater) and over SAR 1.8 billion (water), and municipal drainage contracts.
Geography
Saudi Arabia
Edition
November 2026, First edition
Length
13 pages
Explore report
Doha City Intelligence Profile cover

Doha City Intelligence Profile

A reference profile of the water system in Doha: its sources and supply, the institutions that run it, major projects, tariffs and finance, climate risk and what to watch next. Doha has no separate water system: its water comes through KAHRAMAA's single national network from desalination plants with 538 MIGD of capacity in 2024, against national demand of 420 MIGD. Capacity is expected to reach 648 MIGD after the Facility E plant is commissioned in 2028, while Ashghal's sewer, treated-effluent and flood-drainage works make up seven of the eleven projects listed.
Geography
Qatar
Edition
November 2026, First edition
Length
13 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.