Intelligence Reports/Utility Account Brief
Electricity and Water Authority: Utility Account Brief cover

Utility Account Brief

Electricity and Water Authority: Utility Account Brief

A supplier's guide to the Electricity and Water Authority: how it is organised and makes decisions, its financial position and priorities, how it buys, and the opportunities to target first. EWA is the single buyer for Bahrain's electricity and water. This brief sets out how it spends and buys: private build-own-operate plants, lender-financed grid works such as the US$464.97 million Al Jasra station, and EWA tenders for substations and island desalination. It also names who holds major work and where suppliers should focus first.

Geography
Kingdom of Bahrain
Evidence current to
7 November 2026
Format
PDF
Length
10 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

US$464.97 million: estimated cost of the Al Jasra 400 kV station, inaugurated 20 January 2026, with a US$200 million Islamic Development Bank loan

US$407 million: Al Dur 2 water transmission and storage programme, lender financing approved in 2022

2 private plants in procurement: Hidd Independent Water Project (up to 60 MIGD) and Sitra Independent Water and Power Project (at least 1,200 MW and 30 MIGD); neither awarded as of 7 November 2026

B / B / B2 (negative): Kingdom of Bahrain sovereign ratings from S&P, Fitch and Moody's (2025–2026)

02

Buyer relevance

Who the report is for

Desalination equipment and O&M suppliers

See that Acwa is the lowest Sitra bidder and the only remaining Hidd bidder, and plan an approach through the developer before award.

Grid equipment makers and substation contractors

Track the nine 66 kV substations staged 2026–2028 and the Sitra 400 kV packages held by Siemens Energy and Hitachi Energy.

Metering and leak-detection firms

Prepare for flow-meter replacement under EWA's plan to reach 23% water loss by 2032.

Business development teams entering the Gulf

Use the Opportunity Register and commercial priorities to decide which of 12 EWA programmes to pursue first.

03

Decision scope

Questions answered

01

Which EWA procurements are active?

Hidd (up to 60 MIGD), Sitra (at least 1,200 MW and 30 MIGD), the Hawar intake, outfall and storage packages and the 100 MW BAJ Solar IPP were all in procurement on 7 November 2026.

02

Who already holds EWA's grid work?

Siemens Energy holds the Sitra 400 kV substation (US$127m), Hitachi Energy the transformers and reactors (US$47.1m), and Al-Kooheji Electrical the nine 66 kV substations.

03

How is EWA's grid financed?

Development lenders provide US$470.21 million of about US$872 million across Al Jasra and Al Dur 2 water transmission, including a US$200 million IsDB loan.

04

What is the counterparty risk?

Bahrain is rated B by S&P and Fitch and B2 with a negative outlook by Moody's, and a draft law would move EWA's assets and liabilities to a national company.

04

Inside the report

Inside the complete report

1. The Account at a Glance

2. Organisation and Decision-Making

3. Financial Position

4. Priorities and Pressures

5. How Electricity and Water Authority Buys

6. Opportunity Register

7. Commercial Priorities: Where to Focus First

8. Watch List: What to Monitor and What to Do

Source Register

05

Public preview

What to watch next

Sitra IWPP award (expected by end-2026)

Largest plant contract in the current round.

Hidd IWP award

Bahrain's first independent water-only project; published dates differ (Q2 2028 or by 2029).

Tender Board openings

Bid prices and bidders for EWA packages are published.

Water loss plan tenders

Flow-meter replacement is due to start in 2026.

Sample page · page 6 of 10

The Opportunity Register: status, stage, contractors, supplier categories and route in for each EWA programme.

Landscape report page with a table of EWA projects showing status labels, stage at November 2026, delivery contractors, supplier categories, next milestone and how to access.

06

Included

What you receive

The complete PDF report: 10 pages, 9 sections, 6 tables and a register of 21 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The brief draws on EWA's Statistical Books and announcements, MEED and Bahraini press reports on bids, awards and loans, and rating agency coverage, all checked on 7 November 2026.

Sources

21 sources, listed in the report's source register. Evidence current to 7 November 2026. Principal data periods: EWA Statistical Books 2016–2024 (primary year 2024); project, procurement, financing, tariff and legislative status checked against public sources on 7 November 2026. Currency is the Bahraini dinar (BD), with US dollar equivalents (US$) as the sources report them..

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Electricity and Water Authority: Utility Account Brief

Format
PDF
Length
10 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Utility Account Brief
Edition
November 2026, First edition
Format
PDF
Length
10 pages
Reference
OFW_EXT_ELECTRICITY_AND_WATER_AUTHORITY_UTILITY_ACCOUNT_BRIEF_3eb0f83715c1
Evidence current to
7 November 2026

14

Explore this report family

More Utility Account Briefs

Explore the same report family covering other utilities.

Watercare Services: Utility Account Brief cover

Watercare Services: Utility Account Brief

An assessment of where Watercare Services will spend its NZ$15.2 billion 10-year programme, how it buys, who already holds its major work and where suppliers should focus first. Watercare must lift capital delivery from NZ$959.5 million in FY2026, NZ$90.5 million below target, to a forecast NZ$1,350.0 million in FY2028. Much of its work already sits with standing panels of 19 renewals partners, while the NZ$1.7 billion Waikato Water Supply Programme, opened to alliance bidders on 2 September 2026, is the largest new opening.
Geography
Auckland (Tāmaki Makaurau), New Zealand
Edition
November 2026, First edition
Length
11 pages
Explore report
Acea: Utility Account Brief cover

Acea: Utility Account Brief

A supplier's guide to Acea's water business: where it spends, how it buys through one central portal, who holds its major contracts and which programmes to target first. Acea invested €890.8 million in water in 2025 and buys centrally for its main companies; Acea Ato 2 alone placed about €322 million of orders with 288 suppliers in 2024. Network, leakage, digital and reuse work is backed by a €450 million EIB package for 2027–2030, while the €1.449 billion Peschiera aqueduct is back before the courts after its first award was annulled.
Geography
Rome and ATO 2 Lazio Centrale, Italy
Edition
November 2026, First edition
Length
11 pages
Explore report
Johannesburg Water: Utility Account Brief cover

Johannesburg Water: Utility Account Brief

A commercial brief for suppliers asking where Johannesburg Water spends, how it buys, which projects are open or emerging and where to focus first. Johannesburg Water budgets R13.06 billion of capital for 2026/27 to 2030/31 and had four sewer-main tenders open on 23 November 2026, closing between 27 January and 4 February 2027. It spent 18% of its R1.704 billion capital budget in the first half of 2025/26 and collected 74.84% of billing in FY2024/25, and late payment has delayed contractors on three projects.
Geography
City of Johannesburg, Gauteng, South Africa
Edition
November 2026, First edition
Length
11 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.