Intelligence Reports/Utility Account Brief
Berliner Wasserbetriebe: Utility Account Brief cover

Utility Account Brief

Berliner Wasserbetriebe: Utility Account Brief

A supplier's guide to Berliner Wasserbetriebe: how it is organised and makes decisions, its financial position and priorities, how it buys, and the opportunities to target first. Berliner Wasserbetriebe invested €589.0 million in 2025 and plans €691.3 million for 2027, led by further treatment stages at its six treatment works and pipe and sewer renewal. The brief sets out how it buys, which treatment packages are already let and to whom, the 20 engineering tenders and frameworks on its published schedule, and where suppliers should focus first.

Geography
Berliner Wasserbetriebe
Evidence current to
27 October 2026
Format
PDF
Length
12 pages
Edition
October 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

€589.0 million: total investment in 2025 (€543.7 million self-financed); €691.3 million planned for 2027

€265.9 million: invested in water mains, sewers and pressure pipes in 2025; 109.8 km of network rehabilitated, renovated or extended

20: planned EU-wide engineering tenders and framework agreements on the utility's published schedule, for publication between Q3 2026 and mid-2027 (non-binding, June 2026)

77.4%: share of order volume placed with the regional economy (2025; 79% in 2023)

02

Buyer relevance

Who the report is for

Engineering consultancies

Prepare for the 14 network design and supervision tenders on the June 2026 schedule, with chargeable costs of about €1.6–16 million each.

Pipe, sewer and relining contractors

Size the opportunity from €265.9 million of 2025 network investment and the 109.8 km renewed, and see where spending ran over or under plan.

Treatment and ozonation equipment suppliers

Identify the joint ventures and turnkey contractor already holding Ruhleben, Münchehofe and Waßmannsdorf packages, and the Münchehofe ozonation still to come by 2032.

Business development teams entering Germany

Follow the registration, platform and contract-condition steps for Vergabekooperation Berlin, and track the 2027 charge decision that will test the spending plan.

03

Decision scope

Questions answered

01

How much does Berliner Wasserbetriebe spend on capital work?

€589.0 million in 2025, of which €543.7 million was self-financed; €691.3 million is planned for 2027.

02

Which tenders are coming next?

The utility's June 2026 schedule lists 20 planned EU-wide engineering tenders and frameworks for publication between Q3 2026 and mid-2027, including four plant frameworks worth about €7.6 million over four years.

03

Who already holds the large treatment works contracts?

WTE Wassertechnik is turnkey contractor for the 68,000-tonne Waßmannsdorf sludge plant, and ARGE Ruhleben VE 5.1 holds Ruhleben civil works to June 2027.

04

Do local suppliers have an advantage?

The utility reports that 77.4% of its order volume went to the regional economy in 2025, against 79% in 2023; the utility's published tenders run on the Vergabekooperation Berlin platform.

04

Inside the report

Inside the complete report

1. The Account at a Glance

2. Organisation and Decision-Making

3. Financial Position

4. Priorities and Pressures

5. How Berliner Wasserbetriebe Buys

6. Opportunity Register

7. Commercial Priorities: Where to Focus First

8. Watch List: What to Monitor and What to Do

Source Register

05

Public preview

What to watch next

2027 charge decision

Determines how much of the €691.3 million 2027 plan can be self-financed.

New Berlin coalition

Will decide profit waivers, the mandate review and who chairs the supervisory board.

Forward engineering schedule

Next update shows which network and plant tenders are coming.

Platform notices from EK-B/P

Capital works notices name this department; Münchehofe ozonation construction is the next large treatment package on published timelines.

Sample page · page 7 of 12

The Opportunity Register: planned tenders and treatment works programmes with status, contractors, supplier categories and routes in.

Landscape report page with a seven-column table listing projects, status labels, stage at October 2026, existing contractors, supplier categories, next milestone and how to access.

06

Included

What you receive

The complete PDF report: 12 pages, 9 sections, 6 tables and a register of 24 sources.

This edition

October 2026, First edition.

07

Evidence & method

Evidence and method

The brief draws on the utility's FY 2025 annual report and operating series, its procurement pages and published tender schedules, EU contract notices, contractor and trade-press announcements, and Berlin Senate and Abgeordnetenhaus documents on charges and project status.

Sources

24 sources, listed in the report's source register. Evidence current to 27 October 2026. Principal data periods: FY 2025 annual report; 2026 charges; planned tender schedules of June 2026. Project and procurement status checked against public sources on 27 October 2026. All currency is euros (€)..

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Berliner Wasserbetriebe: Utility Account Brief

Format
PDF
Length
12 pages
Edition
October 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Utility Account Brief
Edition
October 2026, First edition
Format
PDF
Length
12 pages
Reference
OFW_BERLINER_WASSERBETRIEBE_UTILITY_ACCOUNT_BRIEF_ced4c142b6a7
Evidence current to
27 October 2026

14

Explore this report family

More Utility Account Briefs

Explore the same report family covering other utilities.

Watercare Services: Utility Account Brief cover

Watercare Services: Utility Account Brief

An assessment of where Watercare Services will spend its NZ$15.2 billion 10-year programme, how it buys, who already holds its major work and where suppliers should focus first. Watercare must lift capital delivery from NZ$959.5 million in FY2026, NZ$90.5 million below target, to a forecast NZ$1,350.0 million in FY2028. Much of its work already sits with standing panels of 19 renewals partners, while the NZ$1.7 billion Waikato Water Supply Programme, opened to alliance bidders on 2 September 2026, is the largest new opening.
Geography
Auckland (Tāmaki Makaurau), New Zealand
Edition
November 2026, First edition
Length
11 pages
Explore report
Acea: Utility Account Brief cover

Acea: Utility Account Brief

A supplier's guide to Acea's water business: where it spends, how it buys through one central portal, who holds its major contracts and which programmes to target first. Acea invested €890.8 million in water in 2025 and buys centrally for its main companies; Acea Ato 2 alone placed about €322 million of orders with 288 suppliers in 2024. Network, leakage, digital and reuse work is backed by a €450 million EIB package for 2027–2030, while the €1.449 billion Peschiera aqueduct is back before the courts after its first award was annulled.
Geography
Rome and ATO 2 Lazio Centrale, Italy
Edition
November 2026, First edition
Length
11 pages
Explore report
Johannesburg Water: Utility Account Brief cover

Johannesburg Water: Utility Account Brief

A commercial brief for suppliers asking where Johannesburg Water spends, how it buys, which projects are open or emerging and where to focus first. Johannesburg Water budgets R13.06 billion of capital for 2026/27 to 2030/31 and had four sewer-main tenders open on 23 November 2026, closing between 27 January and 4 February 2027. It spent 18% of its R1.704 billion capital budget in the first half of 2025/26 and collected 74.84% of billing in FY2024/25, and late payment has delayed contractors on three projects.
Geography
City of Johannesburg, Gauteng, South Africa
Edition
November 2026, First edition
Length
11 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.