A municipality of 1.4 million supplied almost entirely with desalinated seawater through one national network, where rising demand is met with large-scale storage and new desalination capacity.

Browse all 10 city reports

Paste the caption with your link. Social platforms control how previews appear.

At a glance

Scale, resources and strategic position

1,375,577Residents of Doha MunicipalityNational Planning Council · Doha Municipality · 2025 · estimate
100%Water supply coverageKAHRAMAA · Doha Municipality · 2025
666 million m³Water producedKAHRAMAA · State of Qatar · 2025
420 MIGDWater demandKAHRAMAA · State of Qatar · 2024
5.71%Real water lossesKAHRAMAA · State of Qatar · 2023
9,707 kmSewer network assetsAshghal · State of Qatar · 2025

01

City Water System

Doha’s water services are run at national level. KAHRAMAA, the Qatar General Electricity and Water Corporation, operates the country’s only water network and handles transmission, distribution, retail supply and billing. It reports 100% supply coverage in Doha Municipality in every year from 2019 to 2025. Water is produced by independent water and power producers, the largest being the listed Nebras Energy, and QatarEnergy supplies the natural gas that fuels the plants. The Public Works Authority, Ashghal, runs sewerage, stormwater and treated sewage effluent. The Ministry of Environment and Climate Change regulates water quality and groundwater, and Law No. 23 of 2025 governs the sector.

02

Resources & Supply

Qatar has no perennial surface water and receives about 77 mm of rain a year, so drinking water is almost entirely desalinated seawater. National production was 666 million m³ in 2025 and has stayed between 666 and 691 million m³ a year since 2019, while demand reached 420 million imperial gallons a day (MIGD) in 2024.

The plants nearest the city are the Ras Abu Fontas complex just south of Doha and Umm Al Houl, the country’s largest single source. Groundwater abstraction, estimated at 200 million m³ in 2023, goes mainly to agriculture. Capacity is due to reach 648 MIGD once the new Ras Abu Fontas plant is commissioned.

538 MIGDPotable desalinated water productionKAHRAMAA · State of Qatar · 2024
289.34 million m³Water produced at Umm Al HoulKAHRAMAA · Umm Al Houl, Al Wakra Municipality · 2024
648 MIGDProduction capacity after the new Ras Abu Fontas plantKAHRAMAA · State of Qatar · target

03

Wastewater & Stormwater

Ashghal’s sewer network assets grew from 2,836 km in 2013 to 9,707 km in 2025. It operates eight wastewater treatment plants, including Doha North and Doha South, and 99.7% of sewage was treated in 2021. Treated effluent irrigates landscaping, and 33 of Qatar’s 76 district cooling plants had switched to recycled water by 2025. The national target is to reuse all treated wastewater by 2030, supported by the D-Line transmission line and seasonal storage lagoons, whose first-phase main works were completed in November 2025. For stormwater, Ashghal’s North Doha flood programme is addressing about 51 rainwater accumulation spots.

3,326 kmSewage networkAshghal · State of Qatar · 2025
22.5 million m³Treated-effluent storage lagoonsAshghal · Doha South catchment · Phase 1, main works completed 2025
2,084 kmTreated-water networkAshghal · State of Qatar · 2025

04

Investment & Resilience

The new Ras Abu Fontas plant, known in trade press as Facility E, will add 2,400 MW of power and 110 million gallons a day of desalination; KAHRAMAA signed its QAR 13.5 billion agreement in May 2025. Ashghal’s 2025–2029 plan exceeds QAR 81 billion across all its sectors.

Storage is the main buffer against supply disruption: total water storage was 2,417 million imperial gallons in 2023. On the network side, real losses were 5.71% in 2023, and almost 298,000 residential water meters joined KAHRAMAA’s smart metering system in 2025. The national development strategy targets consumption below 310 litres per person a day by 2030.

05

Key Challenges

  1. Keeping desalination capacity ahead of demand, which reached 420 MIGD in 2024 and is expected to keep rising.
  2. Delivering the new Ras Abu Fontas plant, which is planned to add full water capacity in 2028 and reach full operation in 2029.
  3. Reducing groundwater abstraction, mostly for agriculture, in line with national targets for 2030.
  4. Reaching full reuse of treated wastewater by 2030.
  5. Protecting low-lying coastal land and drainage as sea levels rise, measured at about 1.5 mm a year in Doha.

Evidence

Sources and reporting periods

Drawn from KAHRAMAA’s Annual Statistics Report and Qatar Open Data Portal datasets, National Planning Council statistics, Ashghal and Qatar News Agency releases, Qatar’s national development strategy and climate submission, and trade press. Many operating figures are national; scope is labelled.

Evidence through November 2026 · 118 sources read

Report library

City reports on Doha

10 reports available for purchase

Doha Water Intelligence Report cover

City Water Intelligence

Doha Water Intelligence Report

An assessment of whether Doha's desalinated supply, storage, networks and wastewater system can keep the city's water secure as Facility E, new sewage PPPs and a new water law arrive to 2030. Doha's supply is ample on KAHRAMAA's figures, with 538 MIGD of national desalination capacity against 420 MIGD of demand in 2024, but it is concentrated: Umm Al Houl alone produced about 43% of 2024 plant output, and strategic storage is stated in days rather than months. Physical losses on the national network rose from 3.97% in 2019 to 5.71% in 2023, while most named capital projects around the city are Ashghal sewage, reuse and drainage works.
Edition
November 2026, New edition
Price
USD 799
Explore report →
Water Infrastructure Investment and Project Pipeline in Doha cover

Water Infrastructure Investment and Project Pipeline in Doha

A guide to water infrastructure investment in Doha: the programmes and projects planned or under way, who is responsible, the risks to delivery and what to watch. Doha's water investment runs on two tracks: Facility E, a QAR 13.5bn power and desalination plant financed with a USD 2.97bn co-financing package and due to deliver full water on 1 August 2028, and a flow of Ashghal drainage work led by eight projects worth about QAR 7bn scheduled for tender since February 2026. Delivery risk is visible, with eight delayed Ashghal packages re-awarded to new contractors in October 2026.
Edition
November 2026, First edition
Price
USD 249
Explore report →
Doha City Intelligence Profile cover

City profile

Doha City Intelligence Profile

A reference profile of the water system in Doha: its sources and supply, the institutions that run it, major projects, tariffs and finance, climate risk and what to watch next. Doha has no separate water system: its water comes through KAHRAMAA's single national network from desalination plants with 538 MIGD of capacity in 2024, against national demand of 420 MIGD. Capacity is expected to reach 648 MIGD after the Facility E plant is commissioned in 2028, while Ashghal's sewer, treated-effluent and flood-drainage works make up seven of the eleven projects listed.
Edition
November 2026, First edition
Price
USD 99
Explore report →
Circular Water Economy in Doha, Qatar cover

Circular water economy

Circular Water Economy in Doha, Qatar

This Our Future Water Intelligence report evaluates how Doha can advance water reuse, resource recovery, demand management, strategic storage, and ecosystem restoration within a desalination-dependent urban system.
Edition
2025
Price
USD 499
Explore report →
Digital Water and AI in Doha, Qatar cover

Digital water and AI

Digital Water and AI in Doha, Qatar

This report evaluates how smart metering, integrated utility data, Artificial Intelligence, desalination dependence, water-quality monitoring, infrastructure investment, and institutional capability shape water-system performance in Doha.
Edition
2025
Price
USD 499
Explore report →
Urban Water Security and Demand Management in Doha cover

Urban water security

Urban Water Security and Demand Management in Doha

This Our Future Water Intelligence report evaluates how Doha combines desalination, strategic storage, demand management, digital intelligence, alternative water supplies, and climate-resilient infrastructure to secure urban water services.
Edition
2025
Price
USD 499
Explore report →

Explore the Doha report collection

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.